Japan offshore wind: when does CAPEX inflation break an investment case?
====================================================================================================

**News trigger:** Reuters, 5 November 2026, reported Tokyo Gas withdrawing
from an offshore wind project near Kashima Bay, citing rising costs:
https://www.reuters.com/business/energy/tokyo-gas-withdraws-ibaraki-offshore-wind-project-2026-11-05/

**Business question:** How do CAPEX inflation, net capacity factor, and real
financing rates change the flat real electricity tariff needed to break even?

**Evidence:** A January 2026 Japan Wind Power Association (JWPA) planning
scenario, presented at a Japanese METI committee meeting, provides generic
fixed-bottom offshore-wind CAPEX, OPEX and capacity-factor assumptions.
The numerical snapshot is attributed, NOT site-level observed project data.
Other inputs are clearly labelled illustrative. No Kashima project's actual
costs, financing, bids, output or future viability are inferred.

Download the :download:`source assumptions and provenance
<jwpa_offshore_cost_2026.json>`. Method details and limitations:
:doc:`offshore-wind economic stress guide
</_generated/guides/offshore-wind-economics>`.
"""

from dataclasses import replace
from pathlib import Path

import matplotlib.pyplot as plt
import numpy as np

from energy_data_retrieval.cost_inputs import load_offshore_cost_snapshot
from energy_methods.offshore_wind_economics import (
    OffshoreWindScenario,
    evaluate_offshore_wind,
    tariff_npv_jpy,
)

# %%
# 1. Read an attributed 2026 industry planning scenario, offline
# ---------------------------------------------------------------
# The industry inputs are source-attributed figures, not measured generation.
# The scenario's 25-year life, real rate of 6% and zero annual degradation are
# *illustrative assumptions*, not an interpretation of any project's contract.

root = Path(globals().get("__file__", Path.cwd() / "plot_japan_offshore_wind_cost.py"))
source = root.resolve().parent / "jwpa_offshore_cost_2026.json"
benchmark = load_offshore_cost_snapshot(source)
scenario = OffshoreWindScenario(
    capacity_mw=100.0,
    capex_jpy_per_kw=benchmark.capex_jpy_per_kw,
    opex_jpy_per_kw_year=benchmark.opex_jpy_per_kw_year,
    net_capacity_factor=benchmark.net_capacity_factor,
    lifetime_years=25,
    discount_rate=0.06,
)
base = evaluate_offshore_wind(scenario)
print("Input evidence:", benchmark.evidence_class, benchmark.source_url)
print(f"Illustrative break-even real tariff: {base.lcoe_jpy_per_kwh:.1f} JPY/kWh")
print(f"Illustrative lifetime energy: {base.lifetime_energy_mwh / 1e3:.2f} GWh")
print("This is NOT an estimate of Kashima Bay LCOE or a JWPA model reproduction.")

# %%
# 2. Plot sensitivity to capital-cost escalation and financing
# --------------------------------------------------------------
# The dashed industry baseline represents *assumed* current CAPEX, not a
# reconstructed historical estimate or statistically observed probability.

multipliers = np.linspace(0.7, 1.5, 17)
real_rates = (0.03, 0.06, 0.09)
fig, ax = plt.subplots(figsize=(9, 4.5), layout="constrained")
for rate in real_rates:
    prices = [
        evaluate_offshore_wind(
            replace(
                scenario,
                capex_jpy_per_kw=scenario.capex_jpy_per_kw * factor,
                discount_rate=rate,
            )
        ).lcoe_jpy_per_kwh
        for factor in multipliers
    ]
    ax.plot(multipliers, prices, label=f"Illustrative real rate {rate:.0%}")
ax.axvline(1, linestyle="--", color="grey", label="JWPA assumed CAPEX")
ax.set(
    xlabel="CAPEX relative to published industry planning assumption",
    ylabel="Break-even flat real tariff (JPY/kWh)",
    title="Japan offshore wind — indicative financing/CAPEX stress",
)
ax.grid(alpha=0.2)
ax.legend()
plt.show()

# %%
# 3. Separate energy-resource sensitivity from investment cost
# -------------------------------------------------------------
# Scenarios are *not* confidence intervals. Net capacity factor combines
# wind resource and technical losses; it is not an observed Kashima Bay series.

capacity_factors = np.linspace(0.26, 0.46, 11)
capex_increases = (1.0, 1.2, 1.4)
fig, ax = plt.subplots(figsize=(9, 4.5), layout="constrained")
for multiplier in capex_increases:
    prices = [
        evaluate_offshore_wind(
            replace(
                scenario,
                capex_jpy_per_kw=scenario.capex_jpy_per_kw * multiplier,
                net_capacity_factor=float(cf),
            )
        ).lcoe_jpy_per_kwh
        for cf in capacity_factors
    ]
    ax.plot(100 * capacity_factors, prices, label=f"CAPEX x{multiplier:.1f}")
ax.axvline(100 * benchmark.net_capacity_factor, linestyle="--", color="grey")
ax.set(
    xlabel="Assumed net capacity factor (%)",
    ylabel="Break-even flat real tariff (JPY/kWh)",
    title="Resource/yield sensitivity — planning scenarios only",
)
ax.grid(alpha=0.2)
ax.legend()
plt.show()

# %%
# 4. Audit cash-flow consistency with an assumed (NOT awarded) tariff
# ------------------------------------------------------------------------------------------
# The break-even tariff produces approximately zero NPV by construction.
# Compare it with a hypothetical 30 JPY/kWh flat real contract for an
# illustrative 100 MW asset; this is not a Japanese market price forecast.

hypothetical_tariff = 30.0
npv_jpy = tariff_npv_jpy(scenario, hypothetical_tariff)
print(f"At hypothetical {hypothetical_tariff:g} JPY/kWh: NPV = {npv_jpy / 1e9:.2f} bn JPY")
print(f"At break-even: NPV = {tariff_npv_jpy(scenario, base.lcoe_jpy_per_kwh):.2f} JPY")