  "case_id": "portugal_bess_grid_access_2026",
  "facts_as_of": "2026-11-10",
  "reported_evidence": [
    {
      "source_id": "dgeg_standalone",
      "type": "official_auction_summary",
      "order": "12924-C/2026",
      "order_date": "2026-10-22",
      "url": "https://dgeg.gov.pt/pt/areas-setoriais/energia/energia-eletrica/procedimentos-concorrenciais/atribuicao-de-titulos-de-reserva-de-capacidade-de-injecao-na-rede-eletrica-de-servico-publico-destinados-a-instalacoes-de-armazenamento-autonomo-de-eletricidade/",
      "auction": "standalone",
      "capacity_mva": 750,
      "minimum_storage_power_fraction": 1,
      "minimum_storage_hours": 4
    },
    {
      "source_id": "dgeg_colocated",
      "type": "official_auction_summary",
      "order": "12924-B/2026",
      "order_date": "2026-10-22",
      "url": "https://www.dgeg.gov.pt/pt/areas-setoriais/energia/energia-eletrica/procedimentos-concorrenciais/atribuicao-de-titulos-de-reserva-de-capacidade-de-injecao-na-rede-eletrica-de-servico-publico-destinados-a-centros-eletroprodutores-renovaveis-com-armazenamento-colocalizado/",
      "auction": "colocated",
      "capacity_mva": 300,
      "minimum_storage_power_fraction": 0.2,
      "minimum_storage_hours": 4,
      "warning": "Four hours specified at maximum injection power; do not treat the minimum 20% inverter fraction as sufficient legal compliance."
    },
    {
      "source_id": "pv_magazine_nov9",
      "type": "industry_news",
      "published_date": "2026-11-09",
      "url": "https://www.pv-magazine.es/2026/11/09/portugal-abre-dos-concursos-para-asignar-1-050-mva-de-capacidad-de-red-a-proyectos-con-baterias/",
      "minimum_bid_mva": 50,
      "application_deadline": "2026-12-22"
    },
    {
      "source_id": "portugal_government",
      "type": "official_government_news",
      "published_date": "2026-10-27",
      "url": "https://portugal.gov.pt/pt/gc25/comunicacao/noticias/governo-lanca-leiloes-para-reforcar-a-producao-renovavel-e-o-armazenamento-de-eletricidade"
    }
  ],
  "illustrative_assumptions_NOT_OBSERVED": {
    "bid_mva": [
      50,
      100,
      200
    ],
    "active_power_factor": [
      0.9,
      0.95,
      1
    ],
    "ac_discharge_efficiency": 0.94,
    "end_of_life_usable_fraction": 0.8
  },
  "warning": "Apparent grid MVA is not installed BESS MW; no awarded capacity or measured dispatch is inferred."
}