  "neoen_au_2024": {
    "publisher": "Neoen",
    "title": "Collie Battery Stage 1 begins operating and delivering grid reliability services",
    "url": "https://neoen.com/en/news/2024/neoens-collie-battery-stage-1-begins-operating-and-delivering-grid-reliability-services-in-western-australia/",
    "published_date": "2024-10-24",
    "retrieved_at": "2026-11-01T07:29:07+00:00",
    "license": "No open data license asserted; factual metadata only, source terms apply.",
    "access_method": "indexed_primary_source_excerpt",
    "evidence_note": "Lists operating Hornsdale at 150 MW / 193.5 MWh and Victorian Big Battery at 300 MW / 450 MWh."
  },
  "nzea_collie": {
    "publisher": "Net Zero Economy Authority",
    "title": "Neoen Collie Battery",
    "url": "https://www.nzea.gov.au/neoen-collie-battery",
    "published_date": null,
    "retrieved_at": "2026-11-01T07:29:07+00:00",
    "license": "No open data license asserted; factual metadata only, source terms apply.",
    "access_method": "web_page",
    "evidence_note": "Two operating stages: 219 MW / 877 MWh from October 2024, and 341 MW / 1363 MWh from July 2025. Total computed as the sum of these non-overlapping stages."
  },
  "engie_hazelwood": {
    "publisher": "ENGIE Australia",
    "title": "Hazelwood Battery",
    "url": "https://engie.com.au/about-us/our-generation-activities/battery-storage/hazelwood-battery",
    "published_date": null,
    "retrieved_at": "2026-11-01T07:29:07+00:00",
    "license": "No open data license asserted; factual metadata only, source terms apply.",
    "access_method": "web_page",
    "evidence_note": "Original HBESS operational from 2023, 150 MW / 150 MWh; separate HBESS2 expansion of 150 MW / 600 MWh under construction."
  },
  "mortenson_edwards": {
    "publisher": "Mortenson",
    "title": "Edwards & Sanborn Solar + Storage Project Complete",
    "url": "https://www.mortenson.com/news-insights/edwards-sanborn-solar-storage-completion",
    "published_date": null,
    "retrieved_at": "2026-11-01T07:29:07+00:00",
    "license": "No open data license asserted; factual metadata only, source terms apply.",
    "access_method": "indexed_primary_source_excerpt",
    "evidence_note": "Completed project: 3287 MWh BESS, 1300 MW site interconnection and 875 MWdc solar. Interconnection is not BESS output; no battery MW inferred."
  },
  "aecon_oneida": {
    "publisher": "Aecon",
    "title": "Oneida Energy Storage Project Commences Commercial Operations",
    "url": "https://www.aecon.com/press-room/news/2025/05/07/oneida-commences-commercial-operations",
    "published_date": "2025-05-07",
    "retrieved_at": "2026-11-01T07:29:07+00:00",
    "license": "No open data license asserted; factual metadata only, source terms apply.",
    "access_method": "web_page",
    "evidence_note": "250 MW / 1000 MWh at Haldimand County; lithium-ion units; Northland oversees operations."
  },
  "engie_coya_2024": {
    "publisher": "ENGIE Chile",
    "title": "Inicia su operación comercial el sistema de almacenamiento más grande de América Latina",
    "url": "https://www.engie.cl/inicia-su-operacion-comercial-el-sistema-de-almacenamiento-mas-grande-de-america-latina/",
    "published_date": "2024-03-18",
    "retrieved_at": "2026-11-01T07:29:07+00:00",
    "license": "No open data license asserted; factual metadata only, source terms apply.",
    "access_method": "indexed_primary_source_excerpt",
    "evidence_note": "Coya at María Elena: 139 MW / 638 MWh, lithium batteries; operation authorized by CEN."
  },
  "engie_storage": {
    "publisher": "ENGIE Chile",
    "title": "Almacenamiento BESS",
    "url": "https://www.engie.digital/almacenamiento-bess/",
    "published_date": null,
    "retrieved_at": "2026-11-01T07:29:07+00:00",
    "license": "No open data license asserted; factual metadata only, source terms apply.",
    "access_method": "indexed_primary_source_excerpt",
    "evidence_note": "Operating Tamaya: 68 MW / 418 MWh, Tocopilla, 2025. Coya listed at 139 MW / 638 MWh."
  },
  "engie_financial_2025": {
    "publisher": "ENGIE Chile / Comisión para el Mercado Financiero",
    "title": "ENGIE Energia Chile financial disclosure, 2025",
    "url": "https://www.cmfchile.cl/institucional/inc/inf_financiera/ifrs/safec_ifrs_verarchivo.php?auth=YTkzMzg5N2Q1NzVhYjg0YmQxNGVkZDQ1ZDY1YjU5MmI%3D&send=aTLbRr%2F7WtG0t9iSEYFzO7yoE2%2FVR6LkV0F57PF3dpY8m4jmpYcoaGZpfwneYsXRwIlXZjuYRoRicccbOcDrZ0gHG6YUSV2RxGE71hXYJrKSw7IXoi1yVuWH7hiH5GAZhoC6eH+HvxGZ7yP10tgDpCUpJvbQPBAl2L8V56+AXzTHOAQ%3D",
    "published_date": null,
    "retrieved_at": "2026-11-01T07:29:07+00:00",
    "license": "No open data license asserted; factual metadata only, source terms apply.",
    "access_method": "indexed_primary_source_excerpt",
    "evidence_note": "Financial report lists Coya at 140.97 MW and Tamaya at 76 MW. Basis discrepancy with public project descriptions is unresolved."
  },
  "isa_registro": {
    "publisher": "ISA Energia Brasil",
    "title": "ISA Energia Brasil receives MME, EPE and ONS at its battery storage facility",
    "url": "https://www.isaenergiabrasil.com.br/centro-de-midia/noticias/isa-energia-brasil-recebe-mme-epe-e-ons-para-visita-ao-primeiro-sistema-de-armazenamento-de-energia-em-larga-escala-da-transmissao-nacional/",
    "published_date": "2025-03-14",
    "retrieved_at": "2026-11-01T07:29:07+00:00",
    "license": "No open data license asserted; factual metadata only, source terms apply.",
    "access_method": "indexed_primary_source_excerpt",
    "evidence_note": "Registro substation battery system: 30 MW / 60 MWh and two-hour peak support."
  },
  "sse_ferrybridge": {
    "publisher": "SSE",
    "title": "Ferrybridge Battery Storage System enters full operation",
    "url": "https://www.sse.com/news-and-views/2026/03/sse-s-ferrybridge-battery-storage-system-enters-full-operation/",
    "published_date": "2026-03-20",
    "retrieved_at": "2026-11-01T07:29:07+00:00",
    "license": "No open data license asserted; factual metadata only, source terms apply.",
    "access_method": "web_page",
    "evidence_note": "Ferrybridge 150/300 operating; Salisbury 50/100 operating; Monk Fryston 320/640 and Fiddlers Ferry 150/300 under construction."
  },
  "iberdrola_aranuelo": {
    "publisher": "Iberdrola",
    "title": "Iberdrola commissions Arañuelo III, the first photovoltaic plant in Spain with a storage battery",
    "url": "https://www.iberdrola.com/press-room/news/detail/aranuelo-iii-first-photovoltaic-plant-spain-storage-battery",
    "published_date": "2021-09-16",
    "retrieved_at": "2026-11-01T07:29:07+00:00",
    "license": "No open data license asserted; factual metadata only, source terms apply.",
    "access_method": "web_page",
    "evidence_note": "3 MW / 9 MWh battery with Arañuelo III solar plant; commissioned announcement."
  },
  "galp_alcoutim": {
    "publisher": "Galp",
    "title": "Galp and Powin to build large-scale energy storage system in Portugal",
    "url": "https://www.galp.com/corp/en/media/press-releases/press-release/id/1515/galp-and-powin-to-build-large-scale-energy-storage-system-in-portugal",
    "published_date": "2024-02-07",
    "retrieved_at": "2026-11-01T07:29:07+00:00",
    "license": "No open data license asserted; factual metadata only, source terms apply.",
    "access_method": "indexed_primary_source_excerpt",
    "evidence_note": "5 MW / 20 MWh BESS near Alcoutim, integrated by Powin with solar."
  },
  "galp_alcoutim_2025": {
    "publisher": "Galp",
    "title": "Galp instala 74 MW de baterias para armazenar energia solar em Portugal e Espanha",
    "url": "https://www.galp.com/corp/Portals/0/Comunicados_Media/2025/07-Jul/Galp-instala-74-MW-de-baterias-para-armazenar-energia-solar-em-Portugal-e-Espanha.pdf",
    "published_date": "2025-07-31",
    "retrieved_at": "2026-11-01T07:34:13+00:00",
    "license": "No open data license asserted; factual metadata only, source terms apply.",
    "access_method": "web_page",
    "evidence_note": "Original Alcoutim 5 MW / 20 MWh system operating since early 2025; additional four-system 60.5 MW / 120.4 MWh expansion distinct."
  },
  "total_dunkirk": {
    "publisher": "TotalEnergies",
    "title": "TotalEnergies Launches the Largest Battery-Based Energy Storage Site in France",
    "url": "https://totalenergies.com/newsroom/totalenergies-launches-largest-battery-based-energy-storage-site-france/?lang=eng",
    "published_date": "2021-12-21",
    "retrieved_at": "2026-11-01T07:29:07+00:00",
    "license": "No open data license asserted; factual metadata only, source terms apply.",
    "access_method": "indexed_primary_source_excerpt",
    "evidence_note": "Completed Dunkirk facility: 61 MW and 61 MWh; Saft containers. Initial 25 MW unit included, not additive."
  },
  "rwe_hamm_neurath": {
    "publisher": "RWE",
    "title": "220 megawatts of power to stabilise the grid: RWE commissions Hamm and Neurath battery storage systems",
    "url": "https://www.rwe.com/en/press/rwe-generation/2025-02-14-220-megawatts-of-power-to-stabilise-the-grid-new-battery-storage-systems/",
    "published_date": "2025-02-14",
    "retrieved_at": "2026-11-01T07:29:07+00:00",
    "license": "No open data license asserted; factual metadata only, source terms apply.",
    "access_method": "indexed_primary_source_excerpt",
    "evidence_note": "Separate sites: Hamm 140 MW / 151 MWh and Neurath 80 MW / 84 MWh; exclude 220 MW portfolio total."
  },
  "neoen_storen": {
    "publisher": "Neoen",
    "title": "Sveriges största batteri tas i bruk",
    "url": "https://sweden.neoen.com/sv/okategoriserad/2024/sveriges-storsta-batteri-tas-i-bruk/",
    "published_date": "2024-06-20",
    "retrieved_at": "2026-11-01T07:29:07+00:00",
    "license": "No open data license asserted; factual metadata only, source terms apply.",
    "access_method": "indexed_primary_source_excerpt",
    "evidence_note": "Storen in Ragunda: 52 MW / 52 MWh; inaugurated and operating. Isbillen is a different project."
  },
  "neoen_yllikkala": {
    "publisher": "Neoen",
    "title": "Neoen ottaa käyttöön toisen suuren akkuvarastonsa Suomessa",
    "url": "https://finland.neoen.com/fi/okategoriserad/2025/neoen-ottaa-kayttoon-toisen-suuren-akkuvarastonsa-suomessa/",
    "published_date": "2025-09-08",
    "retrieved_at": "2026-11-01T07:29:07+00:00",
    "license": "No open data license asserted; factual metadata only, source terms apply.",
    "access_method": "Primary publisher text read via research service; direct request returned HTTP 503.",
    "evidence_note": "Two distinct installations ~100 metres apart: original 30 MW / 30 MWh; new Two project 56.4 MW / 112.9 MWh, Nidec and Destia.",
    "locator": "Construction paragraph: April2024 start, March2025 completion, Destia and Despro roles",
    "last_verified_at": "2026-11-02T02:08:32.850608+00:00",
    "checksum_unavailable_reason": "Original bytes not available; no checksum fabricated."
  },
  "energy_cells": {
    "publisher": "Energy Cells",
    "title": "About the project: Lithuanian battery parks",
    "url": "https://energy-cells.eu/about-project/",
    "published_date": null,
    "retrieved_at": "2026-11-01T07:29:07+00:00",
    "license": "No open data license asserted; factual metadata only, source terms apply.",
    "access_method": "web_page",
    "evidence_note": "Four separate 50 MW / 50 MWh parks at Vilnius, Šiauliai, Alytus, Utena; operational reserve service in 2023; Siemens Energy/Fluence consortium."
  },
  "giga_buffalo": {
    "publisher": "GIGA Storage",
    "title": "Buffalo NL",
    "url": "https://giga-storage.com/en/projects/buffalo/",
    "published_date": null,
    "retrieved_at": "2026-11-01T07:29:07+00:00",
    "license": "No open data license asserted; factual metadata only, source terms apply.",
    "access_method": "web_page",
    "evidence_note": "Lelystad: 25 MW / 48 MWh, lithium LFP, supplier Wärtsilä, delivered 2022; connected to Windnet smart grid."
  },
  "eskom_hex": {
    "publisher": "Eskom",
    "title": "Eskom unveils a first of its kind largest battery storage project in the African continent",
    "url": "https://www.eskom.co.za/eskom-unveils-a-first-of-its-kind-largest-battery-storage-project-in-the-african-continent/",
    "published_date": "2023-11-10",
    "retrieved_at": "2026-11-01T07:34:13+00:00",
    "license": "No open data license asserted; factual metadata only, source terms apply.",
    "access_method": "web_page",
    "evidence_note": "Hex opened in Worcester; 100 MWh storage."
  },
  "eskom_rollout": {
    "publisher": "Eskom",
    "title": "Battery Energy Storage System - Distribution",
    "url": "https://www.eskom.co.za/distribution/battery-energy-storage-system/",
    "published_date": null,
    "retrieved_at": "2026-11-01T07:29:07+00:00",
    "license": "No open data license asserted; factual metadata only, source terms apply.",
    "access_method": "indexed_primary_source_excerpt",
    "evidence_note": "Site-level table lists Hex at 20 MW / 100 MWh. Rollout totals are not separate projects."
  },
  "seci_rajnandgaon": {
    "publisher": "Solar Energy Corporation of India",
    "title": "Own projects: commissioned Rajnandgaon solar and BESS",
    "url": "https://seci.co.in/own-projects",
    "published_date": null,
    "retrieved_at": "2026-11-01T07:29:07+00:00",
    "license": "No open data license asserted; factual metadata only, source terms apply.",
    "access_method": "indexed_primary_source_excerpt",
    "evidence_note": "Commissioned Rajnandgaon: 40 MW / 120 MWh lithium-ion storage paired with 100 MW solar PV."
  },
  "dicp_dalian": {
    "publisher": "Dalian Institute of Chemical Physics, Chinese Academy of Sciences",
    "title": "百兆瓦级大连液流电池储能调峰电站并网发电",
    "url": "https://dicp.cas.cn/xwdt/kyjz/202210/t20221031_6541871.html",
    "published_date": "2022-10-31",
    "retrieved_at": "2026-11-01T07:34:13+00:00",
    "license": "No open data license asserted; factual metadata only, source terms apply.",
    "access_method": "web_page",
    "evidence_note": "Grid-connected first phase: 100 MW / 400 MWh vanadium flow battery. Planned 200 MW / 800 MWh total is excluded."
  },
  "sembcorp_ess": {
    "publisher": "Sembcorp",
    "title": "Energy Storage Systems",
    "url": "https://www.sembcorp.com/en/driving-energy-transition/our-businesses/renewable-energy/energy-storage-systems/",
    "published_date": null,
    "retrieved_at": "2026-11-01T07:29:07+00:00",
    "license": "No open data license asserted; factual metadata only, source terms apply.",
    "access_method": "web_page",
    "evidence_note": "Current owner page reports operating Jurong Island ESS with 326 MWh; no battery MW stated."
  },
  "ema_sembcorp_2023": {
    "publisher": "Energy Market Authority",
    "title": "Southeast Asia’s largest energy storage system officially opens",
    "url": "https://www.ema.gov.sg/news-events/news/media-releases/2023/southeast-asias-largest-energy-storage-system-officially-opens",
    "published_date": "2023-02-02",
    "retrieved_at": "2026-11-01T07:29:07+00:00",
    "license": "No open data license asserted; factual metadata only, source terms apply.",
    "access_method": "indexed_primary_source_excerpt",
    "evidence_note": "Jurong Island Banyan and Sakra project: 285 MWh at opening, operations began December 2022."
  },
  "sumitomo_hayakita": {
    "publisher": "Sumitomo Electric",
    "title": "Sumitomo Electric’s Vanadium Redox Flow Battery Selected by Hokkaido Electric Power Network for the Third Time",
    "url": "https://sumitomoelectric.com/press/2026/04/prs015",
    "published_date": "2026-04-28",
    "retrieved_at": "2026-11-01T07:29:07+00:00",
    "license": "No open data license asserted; factual metadata only, source terms apply.",
    "access_method": "indexed_primary_source_excerpt",
    "evidence_note": "Original 15 MW / 60 MWh demonstration battery remains commercially operational; separate 17/51 project and future 11/33 project excluded."
  },
  "fluence_kabankalan": {
    "publisher": "Fluence",
    "title": "SMCGPH and Fluence’s First Battery Project of 470 MW Portfolio Begins Commercial Operation in the Philippines",
    "url": "https://blog.fluenceenergy.com/smcgph-and-fluences-first-battery-energy-storage-project-of-470-mw-portfolio-begins-commercial-operation-in-the-philippines",
    "published_date": "2022-01-27",
    "retrieved_at": "2026-11-01T07:29:07+00:00",
    "license": "No open data license asserted; factual metadata only, source terms apply.",
    "access_method": "indexed_primary_source_excerpt",
    "evidence_note": "Kabankalan 20 MW / 20 MWh enters commercial operation; not the complete 470 MW portfolio."
  },
  "huawei_redsea": {
    "publisher": "Huawei",
    "title": "City of Tomorrow: Huawei FusionSolar contributes to the first city powered by clean energy",
    "url": "https://digitalpower.huawei.com/en/cases/fusionsolar/first-fity-powered-by-clean-energy",
    "published_date": null,
    "retrieved_at": "2026-11-01T07:34:13+00:00",
    "license": "No open data license asserted; factual metadata only, source terms apply.",
    "access_method": "web_page",
    "evidence_note": "Red Sea hotels and airport operating; project package includes 400 MW PV and 1.3 GWh ESS. No BESS power rating stated."
  },
  "nrec_bisha": {
    "publisher": "NR Electric",
    "title": "Saudi Arabia achieves black start of 500MW energy storage station for the first time",
    "url": "https://www.nrec.com/en/index.php/about/newsInfo/203.html",
    "published_date": null,
    "retrieved_at": "2026-11-01T07:29:07+00:00",
    "license": "No open data license asserted; factual metadata only, source terms apply.",
    "access_method": "web_page",
    "evidence_note": "Black-start test dated February 9, 2026 for 500 MW / 2 GWh Bisha project; NR supplies AC-side PCS/PMS/EMS. Commercial status not established by this test."
  },
  "ea_nz_batteries": {
    "publisher": "Electricity Authority New Zealand",
    "title": "Eye on electricity: Battery performance in New Zealand",
    "url": "https://www.ea.govt.nz/news/eye-on-electricity/eye-on-electricity-battery-performance-in-new-zealand/",
    "published_date": null,
    "retrieved_at": "2026-11-01T07:29:07+00:00",
    "license": "No open data license asserted; factual metadata only, source terms apply.",
    "access_method": "web_page",
    "evidence_note": "Operating grid batteries listed: Rotohiko 35 MW / 35 MWh, Ruakākā 100 MW / 200 MWh and Glenbrook-Ohurua 100 MW / 200 MWh."
  },
  "eia860_2025_bess": {
    "publisher": "U.S. Energy Information Administration",
    "title": "Form EIA-860 detailed data, report year 2025: battery storage",
    "url": "https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip",
    "retrieved_at": "2026-11-01T08:02:14+00:00",
    "license": "U.S. government public domain; acknowledge EIA and report year",
    "access_method": "downloaded_archive",
    "evidence_note": "Operating battery units aggregated by Plant Code. Nameplate power AC; stored energy nameplate; December 31 reporting-year status per archive instructions. Electrochemical capacitors excluded.",
    "license_url": "https://www.eia.gov/about/copyrights_reuse.php",
    "sha256": "2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba",
    "report_year": 2025,
    "locator": "2___Plant_Y2025.xlsx/Plant; 3_4_Energy_Storage_Y2025.xlsx/Operable; header row 2; EIA-860 instructions.pdf pp.12-13,17-18",
    "methodology_url": "https://www.eia.gov/electricity/data/eia860/"
  },
  "repd_2026_q2_bess": {
    "publisher": "Department for Energy Security and Net Zero",
    "title": "Renewable Energy Planning Database, July 2026 (Q2) battery records",
    "url": "https://assets.publishing.service.gov.uk/media/6a6cbdc00c36759b5ccaa305/REPD_Publication_Q2_2026.csv",
    "retrieved_at": "2026-11-01T08:02:14+00:00",
    "license": "Contains public sector information licensed under the Open Government Licence v3.0.",
    "access_method": "downloaded_csv",
    "evidence_note": "CP1252 CSV; operational Battery records only. Planning records require phase and alias reconciliation; MWh unreported; native applicant/operator and projected coordinates retained without role or datum inference.",
    "published_date": "2026-08-03",
    "license_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
    "sha256": "84c1b5f958a934d8b4b86ec88f50bdcf43830ded7ff2efc27bffca0c98695035",
    "methodology_url": "https://www.gov.uk/government/publications/renewable-energy-planning-database-quarterly-extract"
  },
  "neoen_blyth_2025": {
    "publisher": "Neoen",
    "title": "Blyth Battery is now operating",
    "url": "https://blythbattery.com.au/2025/04/10/blyth-battery-is-now-operating/",
    "retrieved_at": "2026-11-01T08:02:14+00:00",
    "license": "No open data license asserted; factual metadata only, source terms apply.",
    "access_method": "web_page",
    "evidence_note": "238.5 MW / 477 MWh operating; South Australia; release date not asserted as COD.",
    "published_date": "2025-04-10"
  },
  "neoen_western_downs_2025": {
    "publisher": "Neoen",
    "title": "Multiple milestones reached on Western Downs Battery",
    "url": "https://westerndownsgreenpowerhub.com.au/2025/12/15/multiple-milestones-reached-on-western-downs-battery/",
    "retrieved_at": "2026-11-01T08:02:14+00:00",
    "license": "No open data license asserted; factual metadata only, source terms apply.",
    "access_method": "web_page",
    "evidence_note": "Stages 1 and 2 operating at combined 540 MW / 1080 MWh. Stage 3 is 305 MW / 1220 MWh under construction, expected summer 2027/28 and excluded from current totals.",
    "published_date": "2025-12-15"
  },
  "amea_abydos_2025": {
    "publisher": "AMEA Power",
    "title": "Successful commissioning of Egypt battery energy storage system",
    "url": "https://www.ameapower.com/amea-power-successfully-commissions-landmark-battery-energy-storage-system-in-egypt-following-successful-financial-close/",
    "retrieved_at": "2026-11-01T08:02:14+00:00",
    "license": "No open data license asserted; factual metadata only, source terms apply.",
    "access_method": "web_page",
    "evidence_note": "300 MWh BESS at 500 MW solar plant in Aswan; commissioning complete ahead of scheduled COD; exact commercial operation unconfirmed.",
    "published_date": "2025-07-15"
  },
  "ifc_abydos_bess": {
    "publisher": "International Finance Corporation",
    "title": "Abydos I BESS investment disclosure 50576",
    "url": "https://disclosures.ifc.org/project-detail/SII/50576/abydos-i-bess",
    "retrieved_at": "2026-11-01T08:02:14+00:00",
    "license": "No open data license asserted; factual metadata only, source terms apply.",
    "access_method": "web_page",
    "evidence_note": "Named Abydos I BESS: 300 MWh integrated with existing 500 MWac PV in Aswan. The November 2024 commissioning date refers to solar, not BESS.",
    "published_date": "2025-07-04"
  },
  "acwa_riverside_cod": {
    "publisher": "ACWA Power, issuer announcement via Euroland IR",
    "title": "Riverside BESS full commercial-operation notice",
    "url": "https://ksatools.eurolandir.com/tools/Pressreleases/GetPressRelease/?ID=7901635&companycode=sa-acwa&lang=en-GB&v=ticker",
    "retrieved_at": "2026-11-01T08:02:14+00:00",
    "license": "No open data license asserted; factual metadata only, source terms apply.",
    "access_method": "web_page",
    "evidence_note": "Company received notice on 11 February 2026 that full COD had been achieved. 334 MW / 501 MWh Plant 2, 200 MW PV Plant 1, Tashkent region. Notice receipt is not necessarily the exact COD."
  },
  "esb_aghada_2024": {
    "publisher": "ESB",
    "title": "Aghada second battery facility opens",
    "url": "https://esb.ie/news---insights/press-releases/article/2024/11/15/esb-officially-opens-its-latest-battery-storage-project-in-co-cork-as-part-of--300m-investment",
    "retrieved_at": "2026-11-01T08:02:14+00:00",
    "license": "No open data license asserted; factual metadata only, source terms apply.",
    "access_method": "web_page",
    "evidence_note": "Second Aghada battery 150 MW / 300 MWh, following first 19 MW / 38 MWh in 2022. Poolbeg 75 MW /150 MWh. Aghada combined arithmetic total is 169 MW /338 MWh; no duplicate phase rows.",
    "published_date": "2024-11-15"
  },
  "esb_poolbeg": {
    "publisher": "ESB",
    "title": "Poolbeg Energy Hub",
    "url": "https://esb.ie/what-we-do/generation-and-trading/poolbeg-energy-hub",
    "retrieved_at": "2026-11-01T08:02:14+00:00",
    "license": "No open data license asserted; factual metadata only, source terms apply.",
    "access_method": "web_page",
    "evidence_note": "75 MW /150 MWh operational since late November 2023. Owner reports coordinates 53.340380,-6.189385. February 2024 opening is not COD."
  },
  "met_dunamenti_2025": {
    "publisher": "MET Group",
    "title": "Dunamenti battery energy storage facility enters operation",
    "url": "https://met.com/en/media/press-releases/met-group-inaugurates-hungary-s-largest-battery-energy-storage-facility/",
    "retrieved_at": "2026-11-01T08:02:14+00:00",
    "license": "No open data license asserted; factual metadata only, source terms apply.",
    "access_method": "web_page",
    "evidence_note": "New facility 40 MW /80 MWh enters operation in Szazhalombatta. Huawei equipment, Forest-Vill main contractor. Separate 2022 Tesla demonstrator 4 MW /8 MWh excluded from new-facility ratings.",
    "published_date": "2025-06-19"
  },
  "baltic_storage_platform": {
    "publisher": "Baltic Storage Platform",
    "title": "Kiisa and Arukula battery parks",
    "url": "https://balticstorageplatform.ee/",
    "retrieved_at": "2026-11-01T08:02:14+00:00",
    "license": "No open data license asserted; factual metadata only, source terms apply.",
    "access_method": "web_page",
    "evidence_note": "Two independent 100 MW /200 MWh parks. Kiisa operating for grid services Q4 2025. Arukula construction completed in 2026; both regulate grid frequency. No exact COD inferred. Joint venture Evecon, Corsica Sole and Mirova."
  },
  "aemo_nem_oct2026_bess": {
    "publisher": "Australian Energy Market Operator",
    "title": "NEM Generation Information, October 2026: battery unit inventory",
    "url": "https://www.aemo.com.au/-/media/files/electricity/nem/planning_and_forecasting/generation_information/2026/nem-generation-information-oct-2026.xlsx?rev=e4625386b864409786cd79986dd0ac04&sc_lang=en",
    "retrieved_at": "2026-11-01T08:49:20+00:00",
    "license": "Factual metadata transcription; source terms apply; no blanket redistribution license asserted",
    "access_method": "downloaded_workbook",
    "sha256": "ee0cb96a0f405f32bcdf75389fa9aa57472a8ede2e47f99e466f632765de86bb",
    "locator": "Generator Information, header row 4; Background Information definitions",
    "evidence_note": "Unit aggregate AC nameplates and nominal storage; In Service/In Commissioning subset. Market region NSW1 includes ACT. Site dispatch limit is not battery MW. NEM excludes Western Australia and Northern Territory.",
    "published_date": "2026-10-30"
  },
  "cne_oct2026_bess": {
    "publisher": "Comisión Nacional de Energía de Chile",
    "title": "Tablas de declaración en construcción, octubre 2026: BESS",
    "url": "https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx",
    "retrieved_at": "2026-11-01T08:49:20+00:00",
    "license": "Factual metadata transcription; source terms apply; no blanket redistribution license asserted",
    "access_method": "downloaded_workbook",
    "sha256": "6d6fb5adb0526ffbde3da4fdab4bef666d0ec24171cff43e9132163180455d06",
    "locator": "BESS sheet, header row 3; 76 declarations",
    "methodology_url": "https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf",
    "evidence_note": "Administrative construction declaration, not observed physical progress. Net MW, stored MWh, associated-plant MW and incremental grid injection are distinct. Workbook interconnection days are not asserted as precise CODs.",
    "published_date": "2026-10-30"
  },
  "cne_resolution_603_2026": {
    "publisher": "Comisión Nacional de Energía de Chile",
    "title": "Resolución Exenta 603/2026: actualización de instalaciones en construcción",
    "url": "https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf",
    "retrieved_at": "2026-11-01T08:49:20+00:00",
    "license": "Factual metadata transcription; source terms apply; no blanket redistribution license asserted",
    "access_method": "downloaded_pdf",
    "sha256": "65f08662f57a426e7fa6918bdb4bb305d38e19c8cd9603273badd03235ff3834",
    "locator": "Page 1, date and inventory scope; interpreted only as source metadata",
    "published_date": "2026-10-30"
  },
  "sec_mreh_project": {
    "publisher": "State Electricity Commission of Victoria",
    "title": "Melbourne Renewable Energy Hub",
    "url": "https://www.secvictoria.com.au/investments/melbourne-renewable-energy-hub",
    "retrieved_at": "2026-11-01T08:49:20+00:00",
    "license": "Factual metadata transcription; source terms apply; no blanket redistribution license asserted",
    "access_method": "opened_primary_page"
  },
  "edify_riverina_projects": {
    "publisher": "Edify Energy",
    "title": "Riverina and Darlington Point Energy Storage Systems",
    "url": "https://edifyenergy.com/project/riverina-darlington-point/",
    "retrieved_at": "2026-11-01T08:49:20+00:00",
    "license": "Factual metadata transcription; source terms apply; no blanket redistribution license asserted",
    "access_method": "indexed_primary_page",
    "evidence_note": "Three independent co-located projects, not an additional aggregate project. Owner ratings differ slightly from registry nameplates."
  },
  "engie_libelula_loros_2026": {
    "publisher": "ENGIE Chile",
    "title": "Entrada en operación de BESS Libélula y BESS Los Loros",
    "url": "https://www.engie.cl/impulsamos-la-transicion-energetica-con-la-entrada-en-operacion-de-dos-nuevos-parques-de-almacenamiento/",
    "retrieved_at": "2026-11-01T08:49:20+00:00",
    "license": "Factual metadata transcription; source terms apply; no blanket redistribution license asserted",
    "access_method": "opened_primary_page",
    "published_date": "2026-08-28"
  },
  "engie_tocopilla_cod_2026": {
    "publisher": "ENGIE Chile",
    "title": "Entrada en operación comercial de BESS Tocopilla",
    "url": "https://www.engie.cl/obtuvimos-la-entrada-en-operacion-comercial-de-bess-tocopilla/",
    "retrieved_at": "2026-11-01T08:49:20+00:00",
    "license": "Factual metadata transcription; source terms apply; no blanket redistribution license asserted",
    "access_method": "opened_primary_page",
    "published_date": "2026-03-04"
  },
  "engie_lile_cod_2026": {
    "publisher": "ENGIE Chile",
    "title": "Reconversión del Complejo Energético Mejillones: BESS Lile",
    "url": "https://www.engie.cl/concluimos-la-primera-etapa-de-la-reconversion-del-complejo-energetico-mejillones/",
    "retrieved_at": "2026-11-01T08:49:20+00:00",
    "license": "Factual metadata transcription; source terms apply; no blanket redistribution license asserted",
    "access_method": "opened_primary_page",
    "published_date": "2026-10-08"
  },
  "colbun_q3_2026_bess": {
    "publisher": "Colbún",
    "title": "Resultados del tercer trimestre de 2026: avance BESS",
    "url": "https://www.colbun.cl/corporativo/sala-de-prensa/noticias-y-comunicados/detalle/2026/10/28/colbun-informa-ebitda-de-us196-6-millones-durante-el-tercer-trimestre-de-2026",
    "retrieved_at": "2026-11-01T08:49:20+00:00",
    "license": "Factual metadata transcription; source terms apply; no blanket redistribution license asserted",
    "access_method": "opened_primary_page",
    "evidence_note": "Celda Solar 96% after performance/regulatory tests; DAS II 79% and cold commissioning. Neither described as commercially operating.",
    "published_date": "2026-10-28"
  },
  "colbun_celda_project": {
    "publisher": "Colbún",
    "title": "Proyecto Sistema de Baterías Celda Solar",
    "url": "https://www.colbun.cl/nuestras-energias/proyectos-de-energia-renovable/proyectos-de-almacenamiento/celda-solar",
    "retrieved_at": "2026-11-01T08:49:20+00:00",
    "license": "Factual metadata transcription; source terms apply; no blanket redistribution license asserted",
    "access_method": "opened_primary_page"
  },
  "colbun_das_ii_project": {
    "publisher": "Colbún",
    "title": "BESS Diego de Almagro Sur II",
    "url": "https://www.colbun.cl/nuestras-energias/proyectos-de-energia-renovable/proyectos-de-almacenamiento/bess-ii-das",
    "retrieved_at": "2026-11-01T08:49:20+00:00",
    "license": "Factual metadata transcription; source terms apply; no blanket redistribution license asserted",
    "access_method": "opened_primary_page",
    "evidence_note": "228 MW, Atacama, E-Storage equipment, 201 containers. Apparent unit errors in equipment-level text are not imported. Annual GWh are not stored energy."
  },
  "engie_vilvoorde_project": {
    "publisher": "ENGIE Belgium",
    "title": "BESS Battery Park Vilvoorde",
    "url": "https://corporate.engie.be/en/energy/batteries/bess-battery-park-vilvoorde",
    "retrieved_at": "2026-11-01T08:49:20+00:00",
    "license": "Factual metadata transcription; source terms apply; no blanket redistribution license asserted",
    "access_method": "opened_primary_page"
  },
  "engie_vilvoorde_cod_2025": {
    "publisher": "ENGIE Belgium",
    "title": "Batterijpark van ENGIE in Vilvoorde volledig operationeel",
    "url": "https://corporate.engie.be/nl/pers/batterijpark-van-engie-in-vilvoorde-volledig-operationeel",
    "retrieved_at": "2026-11-01T08:49:20+00:00",
    "license": "Factual metadata transcription; source terms apply; no blanket redistribution license asserted",
    "access_method": "indexed_primary_page",
    "evidence_note": "Direct open returned HTTP 403; indexed primary text explicitly states full commercial operation on 14 November 2025; possible third stage excluded.",
    "published_date": "2025-11-14"
  },
  "rwe_moerdijk_fid_2026": {
    "publisher": "RWE",
    "title": "Moerdijk 400 MW final investment decision",
    "url": "https://www.rwe.com/en/press/rwe-generation/2026-09-21-rwe-to-build-400-mw-battery-to-ease-grid-congestion-in-noord-brabant/",
    "published_date": "2026-09-21",
    "retrieved_at": "2026-11-01T09:49:48.832123+00:00",
    "access_method": "web_page",
    "license": "Copyright RWE; small factual transcriptions with attribution; no full document redistribution.",
    "evidence_note": "Opening project paragraph; construction scheduled, not observed; operating projects in closing portfolio paragraph."
  },
  "rwe_eemshaven_page": {
    "publisher": "RWE",
    "title": "Eemshaven battery storage",
    "url": "https://benelux.rwe.com/en/locations-and-projects/eemshaven-battery-storage/",
    "published_date": null,
    "retrieved_at": "2026-11-01T09:49:48.832123+00:00",
    "access_method": "web_page",
    "license": "Copyright RWE; small factual transcriptions with attribution; no full document redistribution.",
    "evidence_note": "The project; Development, schedule and permits. 110 racks, not containers."
  },
  "rwe_moerdijk_cod_2025": {
    "publisher": "RWE",
    "title": "Moerdijk inertia battery commercial operation",
    "url": "https://benelux.rwe.com/en/press/2025-06-16-rwes-innovative-battery-storage-in-moerdijk-achieves-commercial-operation/",
    "published_date": "2025-06-16",
    "retrieved_at": "2026-11-01T09:49:48.832123+00:00",
    "access_method": "web_page",
    "license": "Copyright RWE; small factual transcriptions with attribution; no full document redistribution.",
    "evidence_note": "Opening and technology paragraphs. Release confirms operation has started, not an exact COD day."
  },
  "rwe_hambach_2026": {
    "publisher": "RWE",
    "title": "Large-scale storage at Hambach mine",
    "url": "https://www.rwe.com/en/press/rwe-generation/2026-07-28-rwe-to-build-large-scale-storage-at-hambach-mine/",
    "published_date": "2026-07-28",
    "retrieved_at": "2026-11-01T09:49:48.832123+00:00",
    "access_method": "web_page",
    "license": "Copyright RWE; small factual transcriptions with attribution; no full document redistribution.",
    "evidence_note": "Opening project paragraphs; separate integrated battery and Manheimer Bucht in final project paragraphs."
  },
  "rwe_bvb_2026": {
    "publisher": "RWE",
    "title": "SIGNAL IDUNA PARK battery commissioned",
    "url": "https://www.rwe.com/en/press/rwe-ag/2026-10-26-rwe-and-bvb-have-commissioned-a-battery-storage-system-at-signal-iduna-park/",
    "published_date": "2026-10-26",
    "retrieved_at": "2026-11-01T09:49:48.832123+00:00",
    "access_method": "web_page",
    "license": "Copyright RWE; small factual transcriptions with attribution; no full document redistribution.",
    "evidence_note": "Opening paragraphs; PV >5 MWp and battery duration >1h are bounds, not exact energy."
  },
  "rwe_gundremmingen_2025": {
    "publisher": "RWE",
    "title": "Gundremmingen groundbreaking",
    "url": "https://www.rwe.com/en/press/rwe-generation/2025-10-29-rwe-is-constructing-germanys-largest-battery-storage-facility-in-gundremmingen/",
    "published_date": "2025-10-29",
    "retrieved_at": "2026-11-01T09:49:48.832123+00:00",
    "access_method": "web_page",
    "license": "Copyright RWE; small factual transcriptions with attribution; no full document redistribution.",
    "evidence_note": "Opening construction and rating paragraphs; approximate cost and container counts retained as bounds."
  },
  "rwe_lingen_werne_2023": {
    "publisher": "RWE",
    "title": "Lingen and Werne installation complete",
    "url": "https://www.rwe.com/en/press/rwe-generation/2023-01-09-rwe-completes-megabattery-in-lingen-and-werne/",
    "published_date": "2023-01-09",
    "retrieved_at": "2026-11-01T09:49:48.832123+00:00",
    "access_method": "web_page",
    "license": "Copyright RWE; small factual transcriptions with attribution; no full document redistribution.",
    "evidence_note": "Opening paragraph: Lingen 49 MWh and Werne 79 MWh. Trial run is not commercial operation."
  },
  "rwe_lingen_werne_page": {
    "publisher": "RWE",
    "title": "Megabatterie plus Wasserkraft",
    "url": "https://www.rwe.com/der-konzern/laender-und-standorte/megabatterie-plus-wasserkraft/",
    "published_date": null,
    "retrieved_at": "2026-11-01T09:49:48.832123+00:00",
    "access_method": "web_page",
    "license": "Copyright RWE; small factual transcriptions with attribution; no full document redistribution.",
    "evidence_note": "Opening section: operating 45 MW Lingen and 72 MW Werne. Shared 47 containers and EUR50m not allocated per site."
  },
  "rwe_lingen_dralon_2026": {
    "publisher": "RWE",
    "title": "Lingen 400 MW investment decision",
    "url": "https://www.rwe.com/en/investor-relations/financial-calendar-and-publications/news-and-ad-hoc-announcements/news/news-2026-01-29/",
    "published_date": "2026-01-29",
    "retrieved_at": "2026-11-01T09:49:48.832123+00:00",
    "access_method": "web_page",
    "license": "Copyright RWE; small factual transcriptions with attribution; no full document redistribution.",
    "evidence_note": "Permits obtained, site work planned for February 2; energy and duration are minimum bounds."
  },
  "rwe_hamm_neurath_page_2026": {
    "publisher": "RWE",
    "title": "Hamm and Neurath battery storage",
    "url": "https://www.rwe.com/en/the-group/countries-and-locations/220-mw-battery-storage-system-in-germany/",
    "published_date": null,
    "retrieved_at": "2026-11-01T09:49:48.832123+00:00",
    "access_method": "web_page",
    "license": "Copyright RWE; small factual transcriptions with attribution; no full document redistribution.",
    "evidence_note": "Opening and in-house integration paragraphs; lithium-ion applies to both sites; shared block count not assigned."
  },
  "afdb_eskom_appraisal_2021": {
    "publisher": "African Development Bank",
    "title": "Eskom Distributed Battery Energy Storage Project appraisal report",
    "url": "https://www.afdb.org/sites/default/files/documents/projects-and-operations/south_africa_-_eskom_distributed_battery_energy_storage_project_-_appraisal_report.pdf",
    "published_date": "2021-11-16",
    "retrieved_at": "2026-11-01T11:02:38.919195+00:00",
    "locator": "PDF page 17 (printed page 6), Table 2.3 Project components: individual site procurement ratings and municipalities.",
    "sha256": "65c62fd65c5af3cc2a952046dca5f3374bd2d221c24579e73bf149dae846a187",
    "license": "Copyright publisher; bounded factual research transcription with attribution, not an open-licensed bulk dataset. No source document redistributed.",
    "access_method": "downloaded_pdf_text",
    "evidence_note": "PDF page 17 (printed page 6), Table 2.3 Project components: individual site procurement ratings and municipalities."
  },
  "afdb_eskom_ipr_20260521": {
    "publisher": "African Development Bank",
    "title": "Eskom Distributed Battery Energy Storage Program IPR March 2026",
    "url": "https://www.afdb.org/sites/default/files/documents/projects-and-operations/p-za-fa0-006.doc.pdf",
    "published_date": "2026-05-21",
    "retrieved_at": "2026-11-01T11:02:38.919195+00:00",
    "locator": "PDF pages 1-3 performance status/risks and pages 4-6 outcome reporting; report dated 21 May, mission ended 4 March; published 28 May 2026.",
    "sha256": "1078082bd129308d3304738a70f19985a8bbaea5bb97b94e13450111c5edcc70",
    "license": "Copyright publisher; bounded factual research transcription with attribution, not an open-licensed bulk dataset. No source document redistributed.",
    "access_method": "downloaded_pdf_text",
    "evidence_note": "PDF pages 1-3 performance status/risks and pages 5-6 outcome reporting; report dated 21 May, mission ended 4 March; published 28 May 2026."
  },
  "wsp_eskom_portfolio": {
    "publisher": "WSP",
    "title": "Helping to shape South Africa’s energy transition",
    "url": "https://www.wsp.com/en-za/projects/battery-energy-storage-solutions-across-several-eskom-distribution-sites",
    "published_date": null,
    "retrieved_at": "2026-11-01T11:02:38.919195+00:00",
    "locator": "Opening owner/operator and technical-advisor paragraphs; Project status box (operational acceptance dates and construction/tender stages).",
    "sha256": "2e93d580ebe8e7f487f931fdee094fd272a2154ff789f31e69038326085d2af2",
    "license": "Copyright publisher; bounded factual research transcription with attribution, not an open-licensed bulk dataset. No source document redistributed.",
    "access_method": "downloaded_web_page",
    "evidence_note": "Opening owner/operator and technical-advisor paragraphs; Project status box (operational acceptance dates and construction/tender stages)."
  },
  "nampower_projects_2026": {
    "publisher": "NamPower",
    "title": "Generation projects: Omburu and Lithops BESS",
    "url": "https://www.nampower.com.na/Projects",
    "published_date": null,
    "retrieved_at": "2026-11-01T11:02:38.919195+00:00",
    "locator": "Generation Projects sections 4 and 5: status, ratings, connection, location, contractors, funding and expected COD. Undated live page; forecasts not converted into operating status.",
    "sha256": "de5ed6624f985d6760237795eb0c8f60faebc2343a5afe723dbf03023b7fa0d9",
    "license": "Copyright publisher; bounded factual research transcription with attribution, not an open-licensed bulk dataset. No source document redistributed.",
    "access_method": "downloaded_web_page",
    "evidence_note": "Generation Projects sections 4 and 5: status, ratings, connection, location, contractors, funding and expected COD. Undated live page; forecasts not converted into operating status."
  },
  "nampower_omburu_factsheet": {
    "publisher": "NamPower",
    "title": "Omburu BESS project fact sheet",
    "url": "https://www.nampower.com.na/Media/Document/979f6783-27cf-46af-bfe2-c476d8fd645d.pdf",
    "published_date": null,
    "retrieved_at": "2026-11-01T11:02:38.919195+00:00",
    "locator": "Printed page 3 introduction (54 MW/MWh) conflicts with page 5 Table 1 (51 MW/MWh); page 5 coordinates, LFP and cell supplier.",
    "sha256": "63c6d33d2ef18ceca42f46af8e4df33917e9e482eac53f7ae6dce3178cff1c58",
    "license": "Copyright publisher; bounded factual research transcription with attribution, not an open-licensed bulk dataset. No source document redistributed.",
    "access_method": "downloaded_pdf_text",
    "evidence_note": "Printed page 3 introduction (54 MW/MWh) conflicts with page 5 Table 1 (51 MW/MWh); page 5 coordinates, LFP and cell supplier."
  },
  "nampower_lithops_202609": {
    "publisher": "NamPower",
    "title": "Lithops BESS project fact sheet September 2026",
    "url": "https://www.nampower.com.na/Media/Document/41c24ee5-90fa-412c-a87f-aee748e0348f.pdf",
    "published_date": null,
    "retrieved_at": "2026-11-01T11:02:38.919195+00:00",
    "locator": "PDF pages 2-3 introduction/Table 1 and pages 5-6 structure/procurement. Revision September 2026; day unavailable.",
    "sha256": "7ad4cfb6a1636590ac052bf03a79bdc1bd273af038e0b0089190e179aacb099e",
    "license": "Copyright publisher; bounded factual research transcription with attribution, not an open-licensed bulk dataset. No source document redistributed.",
    "access_method": "downloaded_pdf_text",
    "evidence_note": "PDF pages 2-3 introduction/Table 1 and pages 5-6 structure/procurement. Revision September 2026; day unavailable.",
    "document_revision": "September 2026"
  },
  "axian_kolda_close_20260331": {
    "publisher": "AXIAN Energy",
    "title": "Closing financier de la centrale NEA Kolda au Sénégal",
    "url": "https://mediaroom.axian-group.com/presse/document/communique_de_presse_closing_inancier-nea-olda.pdf",
    "published_date": "2026-03-31",
    "retrieved_at": "2026-11-01T11:02:38.919195+00:00",
    "locator": "PDF page 1: construction since May 2025; 60 MWp solar plus 72 MWh BESS; financing and 25-year PPA. Whole-hybrid costs are not BESS-only capex.",
    "sha256": "d52f8652357e5b7932f90d991b89cf1dbb96539089f6cd4eb766dc11caccde6d",
    "license": "Copyright publisher; bounded factual research transcription with attribution, not an open-licensed bulk dataset. No source document redistributed.",
    "access_method": "downloaded_pdf_text",
    "evidence_note": "PDF page 1: construction since May 2025; 60 MWp solar plus 72 MWh BESS; financing and 25-year PPA. Whole-hybrid costs are not BESS-only capex."
  },
  "scatec_egypt": {
    "publisher": "Scatec",
    "title": "Egypt operating and backlog portfolio",
    "url": "https://www.scatec.com/en/project/egypt/",
    "published_date": null,
    "retrieved_at": "2026-11-01T11:05:16.512440+00:00",
    "locator": "Asset table: Solar MW and Battery storage MW/MWh are separate columns; Energy Valley row.",
    "sha256": "b5f888612b68bda5f2b5497e182e60b0513ea9df0099b630be27ccfe45f4301b",
    "license": "Copyright publisher; bounded factual research transcription with attribution, not an open-licensed bulk dataset. No source document redistributed.",
    "access_method": "downloaded_web_page",
    "evidence_note": "Asset table: Solar MW and Battery storage MW/MWh are separate columns; Energy Valley row."
  },
  "scatec_obelisk": {
    "publisher": "Scatec",
    "title": "Commercial operations reached for final phase of Obelisk",
    "url": "https://www.scatec.com/en/commercial-operations-reached-for-the-final-phase-of-the-obelisk-project-in-egypt/",
    "published_date": "2026-08-12",
    "retrieved_at": "2026-11-01T11:05:16.512440+00:00",
    "locator": "Opening two paragraphs; entire battery is in phase 1, phase 2 adds solar only; final paragraph shareholder and service roles.",
    "sha256": "1376931e71b5c24ea9e1ff98aef3370fd2a48482678abc505cacb2290d748e98",
    "license": "Copyright publisher; bounded factual research transcription with attribution, not an open-licensed bulk dataset. No source document redistributed.",
    "access_method": "downloaded_web_page",
    "evidence_note": "Opening two paragraphs; entire battery is in phase 1, phase 2 adds solar only; final paragraph shareholder and service roles."
  },
  "scatec_dandara": {
    "publisher": "Scatec",
    "title": "Financing secured for first phase of Dandara",
    "url": "https://www.scatec.com/en/scatec-secures-financing-for-the-first-phase-of-the-dandara-solar-and-bess-project-in-egypt/",
    "published_date": "2026-10-28",
    "retrieved_at": "2026-11-01T11:05:16.512440+00:00",
    "locator": "Opening phase 1, financing, equity and EPC/O&M paragraphs; phase 2 remains excluded.",
    "sha256": "bc4a87879e91aa33bd6e2ebea4bf3a327aca4a54ec69e57c16342e9b3d98cf80",
    "license": "Copyright publisher; bounded factual research transcription with attribution, not an open-licensed bulk dataset. No source document redistributed.",
    "access_method": "downloaded_web_page",
    "evidence_note": "Opening phase 1, financing, equity and EPC/O&M paragraphs; phase 2 remains excluded."
  },
  "scatec_valley": {
    "publisher": "Scatec",
    "title": "Shadwan construction and Energy Valley financing",
    "url": "https://www.scatec.com/en/scatec-starts-construction-of-the-900-mw-shadwan-wind-project-in-egypt/",
    "published_date": "2026-10-01",
    "retrieved_at": "2026-11-01T11:05:16.512440+00:00",
    "locator": "Energy Valley USD100m three-year equity bridge loan; final project paragraph: construction expected by year end, not started.",
    "sha256": "bff24a938d5dcc6aa105252afd2586a6ed4d76f5728b5fd7c4000932bd657b19",
    "license": "Copyright publisher; bounded factual research transcription with attribution, not an open-licensed bulk dataset. No source document redistributed.",
    "access_method": "downloaded_web_page",
    "evidence_note": "Energy Valley USD100m three-year equity bridge loan; final project paragraph: construction expected by year end, not started."
  },
  "ebrd_nefertiti": {
    "publisher": "European Bank for Reconstruction and Development",
    "title": "AMEA Nefertiti Battery Energy Storage, project 56522",
    "url": "https://www.ebrd.com/home/work-with-us/projects/psd/56522.html",
    "published_date": "2026-03-31",
    "retrieved_at": "2026-11-01T11:05:16.512440+00:00",
    "locator": "Project Description, Client Information, Finance Summary and Environmental and Social Summary. PSD last updated 31 March 2026; finance timeline status is separate from physical status.",
    "sha256": "1fefb2b81f6120c6b65589cb286cde2150b5e20ac478bc69ffe61d611417bf0a",
    "license": "Copyright publisher; bounded factual research transcription with attribution, not an open-licensed bulk dataset. No source document redistributed.",
    "access_method": "downloaded_web_page",
    "evidence_note": "Project Description, Client Information, Finance Summary and Environmental and Social Summary. PSD last updated 31 March 2026; finance timeline status is separate from physical status."
  },
  "ifc_abydos_finance": {
    "publisher": "International Finance Corporation",
    "title": "IFC and AMEA Power launch first Egyptian battery storage",
    "url": "https://www.ifc.org/en/pressroom/2025/ifc-and-amea-power-launch-egypt-s-first-battery-energy-storage-system-to-boost-ene",
    "published_date": "2025-06-15",
    "retrieved_at": "2026-11-01T11:05:16.512440+00:00",
    "locator": "Opening financing paragraph and About Egypt first BESS; USD72m debt package for battery integration, not capex.",
    "sha256": "4f0d0b4abf5feb29085c3e836ea1eca50baf2c5586d3fe2e42b304169bdfe083",
    "license": "Copyright publisher; bounded factual research transcription with attribution, not an open-licensed bulk dataset. No source document redistributed.",
    "access_method": "downloaded_web_page",
    "evidence_note": "Opening financing paragraph and About Egypt first BESS; USD72m debt package for battery integration, not capex."
  },
  "ebrd_valley": {
    "publisher": "European Bank for Reconstruction and Development",
    "title": "Energy Valley, project 57439",
    "url": "https://www.ebrd.com/home/work-with-us/projects/psd/57439.html",
    "published_date": "2026-09-25",
    "retrieved_at": "2026-11-01T11:05:16.512440+00:00",
    "locator": "Project description: solar 1.95 GW plus battery 3935 MWh; 25-year PPA. Approval date 18 November 2026 is future and not an approval already obtained.",
    "sha256": "ee163f2cac09d986c42b59bcb05dbe26697e6ee39ec2b4a0884dbc0f70d6b343",
    "license": "Copyright publisher; bounded factual research transcription with attribution, not an open-licensed bulk dataset. No source document redistributed.",
    "access_method": "downloaded_web_page",
    "evidence_note": "Project description: solar 1.95 GW plus battery 3935 MWh; 25-year PPA. Approval date 18 November 2026 is future and not an approval already obtained."
  },
  "eib_dandara": {
    "publisher": "European Investment Bank",
    "title": "Financing Dandara solar and battery project in Egypt",
    "url": "https://www.eib.org/de/press/all/2026-363-eib-provides-up-to-usd90-million-for-one-of-the-largest-solar-and-battery-projects-in-egypt-and-africa",
    "published_date": "2026-10-29",
    "retrieved_at": "2026-11-01T11:05:16.512440+00:00",
    "locator": "Phase 1 paragraph, Qena location and 569 MWp solar, 100 MWh battery.",
    "sha256": "d8f8738a099258a608574cc6594c7e77f36ebe4a7e673a891e817318213b6a00",
    "license": "Copyright publisher; bounded factual research transcription with attribution, not an open-licensed bulk dataset. No source document redistributed.",
    "access_method": "downloaded_web_page",
    "evidence_note": "Phase 1 paragraph, Qena location and 569 MWp solar, 100 MWh battery."
  },
  "ebrd_obelisk": {
    "publisher": "European Bank for Reconstruction and Development",
    "title": "Scatec Solar PV and Battery Energy Storage System, project 55308",
    "url": "https://www.ebrd.com/home/work-with-us/projects/psd/55308.html",
    "published_date": "2025-05-07",
    "retrieved_at": "2026-11-01T11:05:16.512440+00:00",
    "locator": "Project Description: Nagaa Hammadi location; historical financing description, not current ownership.",
    "sha256": "83652c6ba4f7852bb2b06bf2bb792cb68758528108c047e9a127ce1c0663a7af",
    "license": "Copyright publisher; bounded factual research transcription with attribution, not an open-licensed bulk dataset. No source document redistributed.",
    "access_method": "downloaded_web_page",
    "evidence_note": "Project Description: Nagaa Hammadi location; historical financing description, not current ownership.",
    "document_revision": "PSD last updated 8 May 2025"
  },
  "BOE-A-2026-2014": {
    "publisher": "Agencia Estatal Boletín Oficial del Estado",
    "title": "BOE-A-2026-2014 Resolución de 9 de mayo de 2025, de la Dirección General de Política Energética y Minas, por la que se otorga a Desarrollos Renovables FV Romeral, SL, la autorización administrativa previa y la autorización administrativa de construcción del módulo de almacenamiento por baterías «BESS Hibridación Romeral», de 27,46 MW de potencia instalada, y para su infraestructura de evacuación, para su hibridación con el parque solar fotovoltaico existente «FV Romeral», de 42 MW de potencia instalada, en Alarcón (Cuenca).",
    "url": "https://www.boe.es/diario_boe/txt.php?id=BOE-A-2026-2014",
    "published_date": "2026-01-27",
    "document_revision": "Resolution dated 2025-05-09",
    "retrieved_at": "2026-11-01T11:51:30.457734+00:00",
    "locator": "Original text: introductory project identity; Primero/Segundo, principal installation characteristics and evacuation details. October notices: heading and purpose paragraph only; wind scope excluded.",
    "sha256": "b48d34a48cd5b7bb09ca16e930e78fbe7645a53072ebf0fe63f9cfd3d025b70e",
    "license": "BOE general reuse terms effective 2024-06-28; https://www.boe.es/informacion/aviso_legal/. Basado en datos de la Agencia Estatal Boletín Oficial del Estado (https://www.boe.es). Adapted factual extraction; not official or endorsed.",
    "access_method": "downloaded_html"
  },
  "BOE-A-2026-2133": {
    "publisher": "Agencia Estatal Boletín Oficial del Estado",
    "title": "BOE-A-2026-2133 Resolución de 9 de mayo de 2025, de la Dirección General de Política Energética y Minas, por la que se otorga a Desarrollos Renovables FV Olmedilla, SL, la autorización administrativa previa y la autorización administrativa de construcción del módulo de almacenamiento por baterías «BESS Hibridación Olmedilla», de 27,46 MW de potencia instalada, y para su infraestructura de evacuación, para su hibridación con el parque solar fotovoltaico existente «FV Olmedilla», de 42 MW de potencia instalada, situado en Alarcón y Valverdejo (Cuenca).",
    "url": "https://www.boe.es/diario_boe/txt.php?id=BOE-A-2026-2133",
    "published_date": "2026-01-29",
    "document_revision": "Resolution dated 2025-05-09",
    "retrieved_at": "2026-11-01T11:51:30.457734+00:00",
    "locator": "Original text: introductory project identity; Primero/Segundo, principal installation characteristics and evacuation details. October notices: heading and purpose paragraph only; wind scope excluded.",
    "sha256": "964aec944b92ddbaa3fd12c6559f8b947249c976293a4ea48e9a124ee3a2bd5c",
    "license": "BOE general reuse terms effective 2024-06-28; https://www.boe.es/informacion/aviso_legal/. Basado en datos de la Agencia Estatal Boletín Oficial del Estado (https://www.boe.es). Adapted factual extraction; not official or endorsed.",
    "access_method": "downloaded_html"
  },
  "BOE-A-2025-18285": {
    "publisher": "Agencia Estatal Boletín Oficial del Estado",
    "title": "BOE-A-2025-18285 Resolución de 7 de agosto de 2025, de la Dirección General de Política Energética y Minas, por la que se otorga a Iberdrola Renovables Andalucía, SAU, la autorización administrativa previa y la autorización administrativa de construcción del módulo de almacenamiento por baterías «BESS Hibridación FV Andévalo», de 26,36 MW de potencia instalada, y para su infraestructura de evacuación, para su hibridación con el parque solar fotovoltaico existente «FV Andévalo», de 42,56 MW de potencia instalada, en Puebla de Guzmán (Huelva).",
    "url": "https://www.boe.es/diario_boe/txt.php?id=BOE-A-2025-18285",
    "published_date": "2025-09-15",
    "document_revision": "Resolution dated 2025-08-07",
    "retrieved_at": "2026-11-01T11:51:30.457734+00:00",
    "locator": "Original text: introductory project identity; Primero/Segundo, principal installation characteristics and evacuation details. October notices: heading and purpose paragraph only; wind scope excluded.",
    "sha256": "5fb0c4cc740ef5a8b864e9a44e4421603a40802ad5c61265189d028fc88b85d1",
    "license": "BOE general reuse terms effective 2024-06-28; https://www.boe.es/informacion/aviso_legal/. Basado en datos de la Agencia Estatal Boletín Oficial del Estado (https://www.boe.es). Adapted factual extraction; not official or endorsed.",
    "access_method": "downloaded_html"
  },
  "BOE-B-2026-35371": {
    "publisher": "Agencia Estatal Boletín Oficial del Estado",
    "title": "BOE-B-2026-35371 Anuncio de la Dependencia de Industria y Energía de la Subdelegación del Gobierno en Cuenca, por el que se somete al trámite de Información Pública la Solicitud de Autorización Administrativa Previa, Autorización Administrativa de Construcción, Declaración de Impacto Ambiental y declaración, en concreto, de Utilidad Pública del módulo de generación eólica Olmedilla, de 36 MW de potencia instalada, sito en los términos municipales de Alarcón, Pozorrubielos de la Mancha, Valhermoso de la Fuente, Motilla del Palancar, y Valverdejo en la provincia de Cuenca, para su hibridación con la planta fotovoltaica FV Olmedilla, de 42 MW de potencia instalada, y con el módulo de almacenamiento por baterías \"BESS Hibridación Olmedilla\", de 28,78 MW de potencia instalada, y su infraestructura de evacuación, conformando una instalación híbrida de 55 MW de potencia instalada.",
    "url": "https://www.boe.es/diario_boe/txt.php?id=BOE-B-2026-35371",
    "published_date": "2026-10-29",
    "document_revision": "Published 2026-10-29",
    "retrieved_at": "2026-11-01T11:51:30.457734+00:00",
    "locator": "Original text: introductory project identity; Primero/Segundo, principal installation characteristics and evacuation details. October notices: heading and purpose paragraph only; wind scope excluded.",
    "sha256": "963e2994881ab215ad14d8ca663a73c78b878e708bee2bf5b57c672f7d91aa67",
    "license": "BOE general reuse terms effective 2024-06-28; https://www.boe.es/informacion/aviso_legal/. Basado en datos de la Agencia Estatal Boletín Oficial del Estado (https://www.boe.es). Adapted factual extraction; not official or endorsed.",
    "access_method": "downloaded_html"
  },
  "BOE-B-2026-35372": {
    "publisher": "Agencia Estatal Boletín Oficial del Estado",
    "title": "BOE-B-2026-35372 Anuncio de la Dependencia de Industria y Energía de la Subdelegación del Gobierno en Cuenca, por el que se somete al trámite de Información Pública la Solicitud de Autorización Administrativa Previa, Autorización Administrativa de Construcción, Declaración de Impacto Ambiental y declaración, en concreto, de Utilidad Pública del módulo de generación eólica Romeral, de 36 MW de potencia instalada, sito en los términos municipales de Olmedilla de Alarcón y Barchín del Hoyo en la provincia de Cuenca, para su hibridación con la planta fotovoltaica FV Romeral, de 42 MW de potencia instalada, y con el módulo de almacenamiento por baterías \"BESS Romeral\", de 28,78 MW de potencia instalada, y su infraestructura de evacuación, conformando una instalación híbrida de 55 MW de potencia instalada.",
    "url": "https://www.boe.es/diario_boe/txt.php?id=BOE-B-2026-35372",
    "published_date": "2026-10-29",
    "document_revision": "Published 2026-10-29",
    "retrieved_at": "2026-11-01T11:51:30.457734+00:00",
    "locator": "Original text: introductory project identity; Primero/Segundo, principal installation characteristics and evacuation details. October notices: heading and purpose paragraph only; wind scope excluded.",
    "sha256": "adce59246dd4b0dd560b456a485f00272308561f123ae53944c5fdf5a05a7ad4",
    "license": "BOE general reuse terms effective 2024-06-28; https://www.boe.es/informacion/aviso_legal/. Basado en datos de la Agencia Estatal Boletín Oficial del Estado (https://www.boe.es). Adapted factual extraction; not official or endorsed.",
    "access_method": "downloaded_html"
  },
  "pib_india_bess_20260630": {
    "url": "https://www.pib.gov.in/PressReleasePage.aspx?PRID=2291650&lang=2&reg=48",
    "publisher": "Ministry of Power, Government of India / Press Information Bureau",
    "title": "Assessment of National Power Grid",
    "published_date": "2026-07-30",
    "document_revision": "PIB release 2291650; 2026-07-30",
    "retrieved_at": "2026-11-01T21:21:07.868437+00:00",
    "locator": "Table-II: State-wise details of installed BESS capacity; reporting date 2026-06-30; exact numbered row in each record",
    "sha256": "f938ba74db2d47fc08da53c29f5cdb3e21a7c45882c7834c455068504d0099e1",
    "license": "PIB Copyright Policy permits accurate reuse without prior approval with prominent attribution; excludes third-party content. https://www.pib.gov.in/ContentPage.aspx?lang=2&menuid=102&reg=48. Factual extraction attributed to Ministry of Power/MNRE, Government of India, via PIB; no photos, embedded tweets or third-party prose reused.",
    "access_method": "Direct HTTPS HTML download; table parsing and manual reconciliation",
    "evidence_note": "Status and ratings remain dated observations; mixed scopes and conflicting description/column values require review.",
    "latest_retrieved_at": "2026-11-04T06:57:26.577917+00:00",
    "latest_sha256": "fd25a8c62b4200d26fcbf08c119a3229c65ee425b497e38982fefa38945c6aa8"
  },
  "pib_kavaratti_20240104": {
    "url": "https://www.pib.gov.in/PressReleasePage.aspx?PRID=1993036&lang=2&reg=48",
    "publisher": "Ministry of New and Renewable Energy, Government of India / Press Information Bureau",
    "title": "Kavaratti first on-grid solar power plant with BESS",
    "published_date": "2024-01-04",
    "document_revision": "PIB release 1993036; 2024-01-04",
    "retrieved_at": "2026-11-01T21:21:07.868437+00:00",
    "locator": "Opening, diesel-reduction and EPC paragraphs",
    "sha256": "d1b391c269e90d181e756e7abedabb829640744ce705aee8dd5a79db5f365c04",
    "license": "PIB Copyright Policy permits accurate reuse without prior approval with prominent attribution; excludes third-party content. https://www.pib.gov.in/ContentPage.aspx?lang=2&menuid=102&reg=48. Factual extraction attributed to Ministry of Power/MNRE, Government of India, via PIB; no photos, embedded tweets or third-party prose reused.",
    "access_method": "Direct HTTPS HTML download; table parsing and manual reconciliation",
    "evidence_note": "Status and ratings remain dated observations; mixed scopes and conflicting description/column values require review."
  },
  "pib_nandyal_20251115": {
    "url": "https://www.pib.gov.in/PressReleasePage.aspx?PRID=2190326&lang=2&reg=48",
    "publisher": "Ministry of New and Renewable Energy, Government of India / Press Information Bureau",
    "title": "SECI and Andhra Pradesh finalise 1200 MWh BESS and 50 MW hybrid project",
    "published_date": "2025-11-15",
    "document_revision": "PIB release 2190326; 2025-11-15",
    "retrieved_at": "2026-11-01T21:21:07.868437+00:00",
    "locator": "Project Approval and Mandate; SECI to Develop Projects Under CAPEX Mode",
    "sha256": "80957dd7b4abe831b367c96adb81d9d68ecad480174febbdc4fa944ae724e887",
    "license": "PIB Copyright Policy permits accurate reuse without prior approval with prominent attribution; excludes third-party content. https://www.pib.gov.in/ContentPage.aspx?lang=2&menuid=102&reg=48. Factual extraction attributed to Ministry of Power/MNRE, Government of India, via PIB; no photos, embedded tweets or third-party prose reused.",
    "access_method": "Direct HTTPS HTML download; table parsing and manual reconciliation",
    "evidence_note": "Status and ratings remain dated observations; mixed scopes and conflicting description/column values require review."
  },
  "pib_rajnandgaon_20240224": {
    "url": "https://www.pib.gov.in/PressReleasePage.aspx?PRID=2008681&lang=2&reg=48",
    "publisher": "Ministry of New and Renewable Energy, Government of India / Press Information Bureau",
    "title": "SECI unveils solar-battery project in Chhattisgarh",
    "published_date": "2024-02-24",
    "document_revision": "PIB release 2008681; 2024-02-24",
    "retrieved_at": "2026-11-01T21:21:07.868437+00:00",
    "locator": "Land-use, transmission, PPA and financing paragraphs",
    "sha256": "9bd41d6ac6d2aec24e6f90d35dca743ac54a05d8dd65ba98c5228a29c4c2c10a",
    "license": "PIB Copyright Policy permits accurate reuse without prior approval with prominent attribution; excludes third-party content. https://www.pib.gov.in/ContentPage.aspx?lang=2&menuid=102&reg=48. Factual extraction attributed to Ministry of Power/MNRE, Government of India, via PIB; no photos, embedded tweets or third-party prose reused.",
    "access_method": "Direct HTTPS HTML download; table parsing and manual reconciliation",
    "evidence_note": "Status and ratings remain dated observations; mixed scopes and conflicting description/column values require review."
  },
  "pib_modhera_20230801": {
    "url": "https://www.pib.gov.in/PressReleseDetailm.aspx?PRID=1944691&lang=2&reg=48",
    "publisher": "Ministry of New and Renewable Energy, Government of India / Press Information Bureau",
    "title": "Modhera solar village and battery storage parliamentary reply",
    "published_date": "2023-08-01",
    "document_revision": "PIB release 1944691; 2023-08-01",
    "retrieved_at": "2026-11-01T21:21:07.868437+00:00",
    "locator": "Paragraph reporting 6 MW solar with 15 MWh BESS",
    "sha256": "574d130aca27b5a9720540e1ce622d08dee9450d2716dd1a9641639a813f4960",
    "license": "PIB Copyright Policy permits accurate reuse without prior approval with prominent attribution; excludes third-party content. https://www.pib.gov.in/ContentPage.aspx?lang=2&menuid=102&reg=48. Factual extraction attributed to Ministry of Power/MNRE, Government of India, via PIB; no photos, embedded tweets or third-party prose reused.",
    "access_method": "Direct HTTPS HTML download; table parsing and manual reconciliation",
    "evidence_note": "Status and ratings remain dated observations; mixed scopes and conflicting description/column values require review."
  },
  "pib_netra_20251111": {
    "url": "https://www.pib.gov.in/PressReleasePage.aspx?PRID=2188916&lang=2&reg=48",
    "publisher": "Ministry of Power, Government of India / Press Information Bureau",
    "title": "India first MWh-scale vanadium flow battery inaugurated at NTPC NETRA",
    "published_date": "2025-11-11",
    "document_revision": "PIB release 2188916; 2025-11-11",
    "retrieved_at": "2026-11-01T21:21:07.868437+00:00",
    "locator": "Opening paragraphs and separate microgrid paragraph",
    "sha256": "8e7aba59cb7d6f872c3e2352d028e0f8b0720ebe9f474f059d833e097e51c615",
    "license": "PIB Copyright Policy permits accurate reuse without prior approval with prominent attribution; excludes third-party content. https://www.pib.gov.in/ContentPage.aspx?lang=2&menuid=102&reg=48. Factual extraction attributed to Ministry of Power/MNRE, Government of India, via PIB; no photos, embedded tweets or third-party prose reused.",
    "access_method": "Direct HTTPS HTML download; table parsing and manual reconciliation",
    "evidence_note": "Status and ratings remain dated observations; mixed scopes and conflicting description/column values require review."
  },
  "ea_nz_fleet_20260702": {
    "url": "https://emidatasets.blob.core.windows.net/publicdata/Datasets/Wholesale/Generation/GenerationFleet/Existing/20260702_DispatchedGenerationPlant.csv",
    "publisher": "Electricity Authority, New Zealand",
    "title": "Dispatched generation plant, 2 July 2026",
    "published_date": "2026-07-02",
    "document_revision": "20260702",
    "retrieved_at": "2026-11-01T21:51:27.519457+00:00",
    "sha256": "0a1d0c2b64755bb6e87cfbcbacde6119a7df3e4e3d323eaaaa71ab874c3654ba",
    "locator": "CSV rows selected by TechnologyCode BAT; POC/UnitCode/EffectiveStartDate retained per record",
    "license": "CC BY 4.0 default, Electricity Authority attribution; exceptions reviewed at https://www.ea.govt.nz/copyright-disclaimer-transparency/ ; no imagery or third-party submissions reused.",
    "access_method": "Direct HTTPS CSV download",
    "evidence_note": "Historical dispatched plant inventory; effective dates are attribute intervals, not commissioning dates."
  },
  "genesis_fy27q1_20261022": {
    "url": "https://announcements.nzx.com/attachment/479717.pdf",
    "title": "Genesis FY27 Q1 performance report",
    "publisher": "Genesis Energy / NZX",
    "published_date": "2026-10-22",
    "document_revision": "FY27 Q1",
    "retrieved_at": "2026-11-01T22:51:47.802973+00:00",
    "sha256": "066871793cb7324fe958945d4b3d54c82da68758ea1e0c476234c519c645853f",
    "locator": "Slides 4–5; Huntly stages 1 and 2",
    "license": "Copyright retained; bounded factual extraction only, no source document redistribution or open bulk licence asserted.",
    "access_method": "Direct HTTPS; PDF text and table review"
  },
  "genesis_huntly_fid_20260420": {
    "url": "https://www.nzx.com/announcements/471153",
    "title": "Genesis reaches FID on Second Stage Huntly BESS",
    "publisher": "Genesis Energy / NZX",
    "published_date": "2026-04-20",
    "document_revision": "Announcement 471153",
    "retrieved_at": "2026-11-01T22:51:47.802973+00:00",
    "sha256": "72b7972964747a5976e09b5bcec37bd1ed7859f9b4d07281e4af8cde69d98994",
    "locator": "Key metrics, financing, supplier paragraph and cost disclaimer",
    "license": "Copyright retained; bounded factual extraction only, no source document redistribution or open bulk licence asserted.",
    "access_method": "Direct HTTPS; PDF text and table review"
  },
  "edc_annual2025": {
    "url": "https://www.energy.com.ph/wp-content/uploads/2026/04/2026-ASM-Annual-Report-2025.pdf",
    "title": "EDC 2025 Annual Report",
    "publisher": "Energy Development Corporation",
    "document_revision": "2025 reporting year;2026 ASM",
    "retrieved_at": "2026-11-01T23:56:52.887774+00:00",
    "locator": "Consolidated financial statements note21(h), printed page87: Ancillary services reserve market; New products/services section",
    "license": "Copyright retained; limited factual extraction; no document redistribution or open bulk-reuse licence asserted.",
    "access_method": "Primary PDF content retrieved through web search service; direct download returned403; no original byte checksum available.",
    "checksum_unavailable_reason": "Original bytes not obtained; no fabricated checksum. Indexed primary document revision explicitly retained."
  },
  "ngcp_as_202603": {
    "url": "https://www.ngcp.ph/Attachment-Uploads/Customer%20Bulletin%20Nos-2026-04-10-08-44-31.%202026-19.pdf",
    "title": "Existing ancillary services providers as of March2026",
    "publisher": "National Grid Corporation of the Philippines",
    "document_revision": "Customer Bulletin2026-19;2026-04-01",
    "retrieved_at": "2026-11-01T23:56:52.887774+00:00",
    "locator": "PDFpp1–3;21 reviewed battery service rows;service legend and firm-capacity footnote on p2",
    "license": "Copyright retained; limited factual extraction; no document redistribution or open bulk-reuse licence asserted.",
    "access_method": "Direct HTTPS PDF download and text review",
    "sha256": "c96c36034231ba775de67aa32affa667ef27b1586a8cc062cee6dbfcf58f1271",
    "terms_review_url": "https://www.ngcp.ph/privacy",
    "latest_retrieved_at": "2026-11-04T04:56:15.320852+00:00"
  },
  "saft_axpo_france_20261006": {
    "url": "https://saft.com/en/media-resources/press-release/saft-and-axpo-deliver-two-battery-energy-storage-projects-france",
    "title": "Saft and Axpo to deliver two battery energy storage projects in France",
    "publisher": "Saft",
    "document_revision": "2026-10-06",
    "retrieved_at": "2026-11-02T01:00:14.808796+00:00",
    "locator": "Opening paragraphs; individual project ratings; container-count and delivery paragraphs",
    "license": "Copyright retained; bounded factual review, not an open bulk-reuse licence. No full document redistributed.",
    "access_method": "Indexed primary publisher release retrieved via research service; direct website returned HTTP 503.",
    "checksum_unavailable_reason": "Original source bytes unavailable; no checksum fabricated."
  },
  "saft_huntly_20240919": {
    "url": "https://saft.com/en/media-resources/press-releases/saft-utility-scale-bess-will-power-huntly-portfolio-drive-new-zealand",
    "title": "Saft utility-scale BESS will power Huntly Portfolio to drive New Zealand’s green energy transition",
    "publisher": "Saft",
    "document_revision": "2024-09-19",
    "retrieved_at": "2026-11-02T01:00:14.808796+00:00",
    "locator": "Turnkey solution paragraph: Intensium Shift+, conversion and control systems",
    "license": "Copyright retained; bounded factual review, not an open bulk-reuse licence. No full document redistributed.",
    "access_method": "Indexed primary publisher release retrieved via research service; direct website returned HTTP 503.",
    "checksum_unavailable_reason": "Original source bytes unavailable; no checksum fabricated."
  },
  "saft_huntly_20260428": {
    "url": "https://saft.com/en/media-resources/press-release/saft-and-genesis-enter-next-phase-huntly-bess-200-mwh-extension",
    "title": "Saft and Genesis enter next phase of Huntly BESS with 200 MWh extension",
    "publisher": "Saft",
    "document_revision": "2026-04-28",
    "retrieved_at": "2026-11-02T01:00:14.808796+00:00",
    "locator": "Turnkey solution paragraph: Intensium Shift+, conversion and control systems",
    "license": "Copyright retained; bounded factual review, not an open bulk-reuse licence. No full document redistributed.",
    "access_method": "Indexed primary publisher release retrieved via research service; direct website returned HTTP 503.",
    "checksum_unavailable_reason": "Original source bytes unavailable; no checksum fabricated."
  },
  "neoen_akkula_20251230": {
    "url": "https://neoen.com/en/news/2025/neoen-launches-finlands-first-4-hour-battery-in-rauma-southwest-finland/",
    "title": "Neoen launches Finland’s first 4-hour battery in Rauma, Southwest Finland",
    "publisher": "Neoen",
    "document_revision": "2025-12-30",
    "retrieved_at": "2026-11-02T02:02:05.558693+00:00",
    "locator": "Opening bullets and paragraphs: individual Akkula ratings, ownership, Nidec contract, connection, services and expected schedule",
    "license": "Copyright retained; bounded factual review, not an open bulk-reuse licence. No source prose, figures or original documents redistributed.",
    "sha256": "a4113d9dc0d29d775764211a8e86b22f9ef4d5d063139140a86e9ba2921c6fb5",
    "access_method": "Primary publisher bytes downloaded; content and source scope reviewed."
  },
  "neoen_isbillen_site": {
    "url": "https://sweden.neoen.com/sv/projekt/isbillen-power-reserve/",
    "title": "Isbillen Power Reserve",
    "publisher": "Neoen",
    "document_revision": "Undated Swedish project page; accessed 2026-11-02",
    "retrieved_at": "2026-11-02T02:02:05.558693+00:00",
    "locator": "Project description: operation since spring 2025, Sollefteå, 36 LFP containers; displayed rounded 94 MW",
    "license": "Copyright retained; bounded factual review, not an open bulk-reuse licence. No source prose, figures or original documents redistributed.",
    "access_method": "Primary publisher text read via research service; direct request returned HTTP 503.",
    "checksum_unavailable_reason": "Original bytes not available; no checksum fabricated.",
    "terms_url": "https://sweden.neoen.com/sv/juridisk-information/",
    "reuse_assessment": "Legal notice protects site text, images and other content against reproduction. Only separately structured project facts retained; no prose or site content copied and no bulk site extraction. No open reuse licence inferred."
  },
  "neoen_isbillen_20240131": {
    "url": "https://neoen.com/en/news/2024/neoen-launches-construction-of-isbillen-power-reserve-the-largest-battery-in-sweden/",
    "title": "Neoen launches construction of Isbillen Power Reserve, the largest battery in Sweden",
    "publisher": "Neoen",
    "document_revision": "2024-01-31",
    "retrieved_at": "2026-11-02T02:02:05.558693+00:00",
    "locator": "Opening bullets and project paragraphs: precise individual ratings, EPC, ownership and 130 kV connection",
    "license": "Copyright retained; bounded factual review, not an open bulk-reuse licence. No source prose, figures or original documents redistributed.",
    "sha256": "3e875a321b639659fad18d734fe1e9492ea46454a097bd8623c5f03091bd8164",
    "access_method": "Primary publisher bytes downloaded; content and source scope reviewed."
  },
  "ignitis_battery_portfolio_20261102": {
    "url": "https://ignitisrenewables.com/flexibility-technologies/",
    "title": "Battery energy storage system portfolio",
    "publisher": "Ignitis Renewables",
    "document_revision": "Undated live portfolio; accessed 2026-11-02",
    "retrieved_at": "2026-11-02T02:02:05.558693+00:00",
    "locator": "Projects section: separate Tume, Kelmė and Mažeikiai BESS entries; wind/solar capacities excluded",
    "license": "Copyright retained; bounded factual review, not an open bulk-reuse licence. No source prose, figures or original documents redistributed.",
    "sha256": "3719bd67e6e7cdc53a95eacf3ac27522030186589ae1141c5532adde736caae8",
    "access_method": "Primary publisher bytes downloaded; content and source scope reviewed."
  },
  "ignitis_renewables_annual_2025": {
    "url": "https://ignitisrenewables.com/wp-content/uploads/2026/04/Annual-report_Ignitis-renewables_2025_ENG-2.pdf",
    "title": "Ignitis Renewables Annual Report 2025",
    "publisher": "Ignitis Renewables",
    "document_revision": "Year ended2025-12-31; responsibility statement dated2026-04-16",
    "retrieved_at": "2026-11-02T02:02:05.558693+00:00",
    "locator": "Printed page 5: Nord Wind Park acquisition; pages 26–27: Kelmė/Mažeikiai project investment table and footnote 3; glossary page 164 legal entities",
    "license": "Copyright retained; bounded factual review, not an open bulk-reuse licence. No source prose, figures or original documents redistributed.",
    "sha256": "0dcfac0d8502750519f81d13ec7557dc185a38441d427f1ea6338863fb851172",
    "access_method": "Primary publisher bytes downloaded; content and source scope reviewed."
  },
  "ignitis_tume_20260721": {
    "url": "https://ignitisrenewables.com/ignitis-renewables-to-develop-107-mw-tume-battery-energy-storage-system-in-latvia/",
    "title": "Ignitis Renewables to develop 107 MW Tume battery energy storage system in Latvia",
    "publisher": "Ignitis Renewables",
    "document_revision": "2026-07-21; HTML datePublished",
    "retrieved_at": "2026-11-02T02:02:05.558693+00:00",
    "locator": "Project ratings, shared solar connection, estimated commercial-operation year and approximately EUR35m investment paragraphs",
    "license": "Copyright retained; bounded factual review, not an open bulk-reuse licence. No source prose, figures or original documents redistributed.",
    "sha256": "0695caefc4105b9a102ed3b63dcb7162a45b302865202d3d784d481aa86b27a8",
    "access_method": "Primary publisher bytes downloaded; content and source scope reviewed."
  },
  "ignitis_kruonis_20260513": {
    "url": "https://ignitisgamyba.lt/apie-mus/naujienos/kruonio-teritorijoje-energija-kaups-ne-tik-baseinas-bet-ir-kaupikliai/4858",
    "title": "Kruonio teritorijoje energiją kaups ne tik baseinas, bet ir kaupikliai",
    "publisher": "Ignitis Gamyba",
    "document_revision": "2026-05-13",
    "retrieved_at": "2026-11-02T02:02:05.558693+00:00",
    "locator": "Opening BESS paragraphs through grid connection; exclude following pumped-hydro fifth-unit section",
    "license": "Copyright retained; bounded factual review, not an open bulk-reuse licence. No source prose, figures or original documents redistributed.",
    "sha256": "4215aa51845c213b31856e5df3ff7a1d0a5e6715f82c0cfff19824c7c7a710cb",
    "access_method": "Primary publisher bytes downloaded; content and source scope reviewed."
  },
  "ignitis_bess_construction_2025": {
    "url": "https://ignitisrenewables.com/https-ignitisrenewables-com-ignitis-group-starts-building-battery-energy-storage-parks-in-lithuania/",
    "title": "Ignitis Group starts building battery energy storage parks in Lithuania",
    "publisher": "Ignitis Renewables",
    "document_revision": "2025-07-01",
    "retrieved_at": "2026-11-02T02:02:05.558693+00:00",
    "locator": "Three-site BESS description; Rolls-Royce equipment and integration paragraph; aggregate capacities not copied to individual sites",
    "license": "Copyright retained; bounded factual review, not an open bulk-reuse licence. No source prose, figures or original documents redistributed.",
    "sha256": "103e43368be71434ef1c6187d369acda9647cf9e049ac48c5960071da0c275c5",
    "access_method": "Primary publisher bytes downloaded; content and source scope reviewed.",
    "published_at": "2025-07-01T05:51:28+00:00"
  },
  "neoen_storen_site": {
    "url": "https://sweden.neoen.com/sv/projekt/storen-power-reserve/",
    "title": "Storen Power Reserve",
    "publisher": "Neoen",
    "document_revision": "Undated page; accessed2026-11-02",
    "retrieved_at": "2026-11-02T02:02:05.558693+00:00",
    "locator": "Project description: container count and services",
    "license": "Copyright retained; bounded factual review, not an open bulk-reuse licence. No source prose, figures or original documents redistributed.",
    "access_method": "Primary publisher text read via research service; direct request returned HTTP 503.",
    "checksum_unavailable_reason": "Original bytes not available; no checksum fabricated.",
    "terms_url": "https://sweden.neoen.com/sv/juridisk-information/",
    "reuse_assessment": "Legal notice protects site text, images and other content against reproduction. Only separately structured project facts retained; no prose or site content copied and no bulk site extraction. No open reuse licence inferred."
  },
  "ast_bess_opening_20251023": {
    "url": "https://ast.lv/en/events/ast-battery-energy-storage-systems-rezekne-and-tume-will-start-providing-balancing-reserves",
    "title": "AST Battery Energy Storage Systems in Rēzekne and Tume will start providing balancing reserves",
    "publisher": "AS Augstsprieguma tīkls (AST)",
    "document_revision": "2025-10-23",
    "retrieved_at": "2026-11-02T02:04:59.211815+00:00",
    "locator": "Individual project ratings, qualified services, funding and control-system paragraphs",
    "license": "Copyright retained; bounded factual review with attribution, no open bulk-reuse licence asserted. Full source content is not redistributed.",
    "access_method": "Downloaded primary publisher bytes; source scope checked.",
    "sha256": "7e8cc48d434eb51348f24d765135ac0e043c5481b215de5674e0c9d951395d13"
  },
  "ast_electricity_review_2025": {
    "url": "https://ast.lv/en/electricity-market-review?month=13&year=2025",
    "title": "Latvian electricity market review, year 2025",
    "publisher": "AS Augstsprieguma tīkls (AST)",
    "document_revision": "Reporting period ended2025-12-31",
    "retrieved_at": "2026-11-02T02:04:59.211815+00:00",
    "locator": "Year2025 developments bullet: both Rēzekne and Tume entered balancing-capacity market on29October",
    "license": "Copyright retained; bounded factual review with attribution, no open bulk-reuse licence asserted. Full source content is not redistributed.",
    "access_method": "Downloaded primary publisher bytes; source scope checked.",
    "sha256": "f8f98c3cab9f502cca0bea378ad5b695337ba634c5620721f608f7652e7d716c"
  },
  "ast_battery_portfolio": {
    "url": "https://ast.lv/en/projects/batteries",
    "title": "Batteries — AST synchronisation projects",
    "publisher": "AS Augstsprieguma tīkls (AST)",
    "document_revision": "Undated; accessed2026-11-02",
    "retrieved_at": "2026-11-02T02:04:59.211815+00:00",
    "locator": "Site substations, construction partners and funding paragraphs; lifecycle forecast is stale and not used",
    "license": "Copyright retained; bounded factual review with attribution, no open bulk-reuse licence asserted. Full source content is not redistributed.",
    "access_method": "Downloaded primary publisher bytes; source scope checked.",
    "sha256": "78c058777a79b39e2bd5298ee4a61d2b6d9527783760185a2ab9083a66529238"
  },
  "neoen_storen_ntp_20230110": {
    "url": "https://neoen.com/app/uploads/2023/01/2023-01-10_MR_Neoen_Startofconstruction_StorenPowerReserve.pdf",
    "title": "Neoen launches construction of Storen Power Reserve",
    "publisher": "Neoen",
    "document_revision": "2023-01-10",
    "retrieved_at": "2026-11-02T02:04:59.211815+00:00",
    "locator": "Page1: Nidec NTP, ownership, 130kV E.ON connection and FCR services; historical40MW design rating not used",
    "license": "Copyright retained; bounded factual review with attribution, no open bulk-reuse licence asserted. Full source content is not redistributed.",
    "access_method": "Downloaded primary publisher bytes; source scope checked.",
    "sha256": "7145873bf4081419f653dc2acf35599b06d25d9a3037fdac2552215a73d6e6c8"
  },
  "ignitis_kelme_nts_2026": {
    "url": "https://ignitisrenewables.com/wp-content/uploads/2024/02/EN-Kelme_BESS_NTS_report.pdf",
    "title": "Kelmė Battery Energy Storage System non-technical summary",
    "publisher": "Ignitis Renewables",
    "document_revision": "Document details date 2026-08-19; URL directory is not publication date",
    "locator": "Printed pages 2–5: document details, location and project components",
    "retrieved_at": "2026-11-02T02:50:11.905886+00:00",
    "sha256": "221559724e553dccba44f8b24f1e4e5d7244d5de09210bbc632a25dc45d61934",
    "license": "Copyright retained; bounded independently structured factual review only. No open bulk licence asserted; no document prose, tables, images or binaries redistributed.",
    "access_method": "Direct public publisher PDF download; original bytes retained outside Git; source layout inspected."
  },
  "ignitis_mazeikiai_nts_2026": {
    "url": "https://ignitisrenewables.com/wp-content/uploads/2024/01/EN-Mazeikiai_BESS_NTS_report.pdf",
    "title": "Mažeikiai Battery Energy Storage System non-technical summary",
    "publisher": "Ignitis Renewables",
    "document_revision": "Document details date 2026-09-11; URL directory is not publication date",
    "locator": "Printed pages 2–5: document details, location and project components",
    "retrieved_at": "2026-11-02T02:50:11.905886+00:00",
    "sha256": "69f689024e04f9573bb9a39ae109795cf4f47c4569670d5cba41682e52487935",
    "license": "Copyright retained; bounded independently structured factual review only. No open bulk licence asserted; no document prose, tables, images or binaries redistributed.",
    "access_method": "Direct public publisher PDF download; original bytes retained outside Git; source layout inspected."
  },
  "juniper_fdre_portfolio_20261016": {
    "url": "https://www.junipergreenenergy.com/fdre/",
    "title": "FDRE and BESS project portfolio",
    "publisher": "Juniper Green Energy Limited",
    "document_revision": "Individual project assessments 2026-10-16; retrieved 2026-11-02",
    "retrieved_at": "2026-11-02T03:55:43.501266+00:00",
    "locator": "Project popups 22/23, 24, 25/28, 26, 40; BESS-specific commissioning footnotes override hybrid tab status",
    "sha256": "555c442e84afd59de3d2cc72d90c479179a9814866063d34baebee656a47f8e4",
    "license": "Copyright retained. Bounded independently structured factual metadata review, not an open bulk-reuse licence. No original documents, prose or layouts redistributed.",
    "access_method": "Public publisher download; exact model columns, footnotes and document scope reviewed.",
    "reuse_assessment": "Public project portfolio, not the separately gated RHP/abridged prospectus. No residence declaration made, offer document opened or bulk licence assumed. Bounded factual review of six unique named project scopes; duplicate popup cards consolidated."
  },
  "scatec_south_africa_20261102": {
    "url": "https://www.scatec.com/en/project/south-africa/",
    "publisher": "Scatec ASA",
    "title": "South Africa",
    "published_date": null,
    "document_revision": null,
    "retrieved_at": "2026-11-02T05:01:38+00:00",
    "locator": "Assets table: Kenhardt operational 225 MW/1140 MWh; Mogobe construction 103/412; Haru backlog 123/492.",
    "license": "Copyright publisher. Bounded factual research transcription with attribution; no open bulk-reuse licence claimed and no source document redistributed.",
    "access_method": "web_primary_page_text",
    "sha256": null,
    "access_note": "Primary page read through web retrieval; no source bytes downloaded for this URL. Direct Mogobe and quarterly announcement download attempts returned403; remaining primary pages were read through web retrieval. No byte checksum asserted."
  },
  "scatec_philippines_20261102": {
    "url": "https://www.scatec.com/en/project/philippines/",
    "publisher": "Scatec ASA",
    "title": "Philippines",
    "published_date": null,
    "document_revision": null,
    "retrieved_at": "2026-11-02T05:01:38+00:00",
    "locator": "Assets table: Magat operational 40 MW/40 MWh; Binga, Binga 2 and Ambuklao construction each 40/40; exclude hydro and solar rows.",
    "license": "Copyright publisher. Bounded factual research transcription with attribution; no open bulk-reuse licence claimed and no source document redistributed.",
    "access_method": "web_primary_page_text",
    "sha256": null,
    "access_note": "Primary page read through web retrieval; no source bytes downloaded for this URL. Direct Mogobe and quarterly announcement download attempts returned403; remaining primary pages were read through web retrieval. No byte checksum asserted."
  },
  "scatec_kenhardt_cod_20231211": {
    "url": "https://www.scatec.com/en/energising-tomorrow-scatec-ignites-one-of-the-worlds-largest-hybrid-solar-and-battery-project-in-south-africa/",
    "publisher": "Scatec ASA",
    "title": "Energising tomorrow: Scatec ignites one of the world’s largest hybrid solar and battery project in South Africa",
    "published_date": "2023-12-11",
    "document_revision": null,
    "retrieved_at": "2026-11-02T05:01:38+00:00",
    "locator": "Opening paragraphs, equity paragraph and notes to editors: three-plant aggregate, 225 MW/1140 MWh, 456 battery units, 20-year PPA and hybrid capex.",
    "license": "Copyright publisher. Bounded factual research transcription with attribution; no open bulk-reuse licence claimed and no source document redistributed.",
    "access_method": "web_primary_page_text",
    "sha256": null,
    "access_note": "Primary page read through web retrieval; no source bytes downloaded for this URL. Direct Mogobe and quarterly announcement download attempts returned403; remaining primary pages were read through web retrieval. No byte checksum asserted."
  },
  "scatec_mogobe_close_20241018": {
    "url": "https://www.scatec.com/en/scatec-reaches-financial-close-and-prepares-for-construction-start-for-battery-energy-storage-project-in-south-africa/",
    "publisher": "Scatec ASA",
    "title": "Scatec reaches financial close and prepares for construction start for battery energy storage project in South Africa",
    "published_date": "2024-10-18",
    "document_revision": null,
    "retrieved_at": "2026-11-02T05:01:38+00:00",
    "locator": "Opening, PPA, capex/debt, equity, service-role and Kathu-location paragraphs.",
    "license": "Copyright publisher. Bounded factual research transcription with attribution; no open bulk-reuse licence claimed and no source document redistributed.",
    "access_method": "web_primary_page_text",
    "sha256": null,
    "access_note": "Primary page read through web retrieval; no source bytes downloaded for this URL. Direct Mogobe and quarterly announcement download attempts returned403; remaining primary pages were read through web retrieval. No byte checksum asserted."
  },
  "scatec_haru_award_20250530": {
    "url": "https://www.scatec.com/en/scatec-wins-battery-storage-project-in-south-africa/",
    "publisher": "Scatec ASA",
    "title": "Scatec wins battery storage project in South Africa",
    "published_date": "2025-05-30",
    "document_revision": null,
    "retrieved_at": "2026-11-02T05:01:38+00:00",
    "locator": "Opening award/capacity, 15-year contract, estimated capex, intended equity and Free State paragraphs.",
    "license": "Copyright publisher. Bounded factual research transcription with attribution; no open bulk-reuse licence claimed and no source document redistributed.",
    "access_method": "web_primary_page_text",
    "sha256": null,
    "access_note": "Primary page read through web retrieval; no source bytes downloaded for this URL. Direct Mogobe and quarterly announcement download attempts returned403; remaining primary pages were read through web retrieval. No byte checksum asserted."
  },
  "scatec_philippines_close_20260203": {
    "url": "https://www.scatec.com/en/scatec-jv-reaches-financial-close-for-80-mw-bess-in-the-philippines-and-prepares-for-construction-start/",
    "publisher": "Scatec ASA",
    "title": "Scatec JV reaches financial close for 80 MW BESS in the Philippines and prepares for construction start",
    "published_date": "2026-02-03",
    "document_revision": null,
    "retrieved_at": "2026-11-02T05:01:38+00:00",
    "locator": "Opening three paragraphs and ownership/financing paragraph; Binga phases remain distinct.",
    "license": "Copyright publisher. Bounded factual research transcription with attribution; no open bulk-reuse licence claimed and no source document redistributed.",
    "access_method": "web_primary_page_text",
    "sha256": null,
    "access_note": "Primary page read through web retrieval; no source bytes downloaded for this URL. Direct Mogobe and quarterly announcement download attempts returned403; remaining primary pages were read through web retrieval. No byte checksum asserted."
  },
  "scatec_magat2_cod_20260515": {
    "url": "https://www.scatec.com/en/scatec-jv-starts-commercial-operation-of-battery-system-in-the-philippines/",
    "publisher": "Scatec ASA",
    "title": "Scatec JV starts commercial operation of battery system in the Philippines",
    "published_date": "2026-05-15",
    "document_revision": null,
    "retrieved_at": "2026-11-02T05:01:38+00:00",
    "locator": "Opening two paragraphs, 40 MWh operating total and 50/50 JV/debt paragraphs. Phase1 24 MW; phase2 16 MW.",
    "license": "Copyright publisher. Bounded factual research transcription with attribution; no open bulk-reuse licence claimed and no source document redistributed.",
    "access_method": "web_primary_page_text",
    "sha256": null,
    "access_note": "Primary page read through web retrieval; no source bytes downloaded for this URL. Direct Mogobe and quarterly announcement download attempts returned403; remaining primary pages were read through web retrieval. No byte checksum asserted."
  },
  "scatec_obelisk_close_20250615": {
    "url": "https://www.scatec.com/en/scatec-reaches-financial-close-for-the-1-1gw-solar-100mw-200mwh-bess-obelisk-project/",
    "publisher": "Scatec ASA",
    "title": "Scatec reaches financial close for the 1.1GW solar + 100MW/200MWh BESS Obelisk project",
    "published_date": "2025-06-15",
    "document_revision": null,
    "retrieved_at": "2026-11-02T05:01:38+00:00",
    "locator": "Financing paragraphs: whole hybrid USD590m estimated capex, USD479.1m project financing, USD120m equity bridge; sovereign PPA guarantee.",
    "license": "Copyright publisher. Bounded factual research transcription with attribution; no open bulk-reuse licence claimed and no source document redistributed.",
    "access_method": "web_primary_page_text",
    "sha256": null,
    "access_note": "Primary page read through web retrieval; no source bytes downloaded for this URL. Direct Mogobe and quarterly announcement download attempts returned403; remaining primary pages were read through web retrieval. No byte checksum asserted."
  },
  "giga_portfolio_20261102": {
    "url": "https://giga-storage.com/en/projects/",
    "publisher": "GIGA Storage",
    "title": "GIGA Storage portfolio",
    "retrieved_at": "2026-11-02T05:53:33+00:00",
    "published_date": null,
    "document_revision": null,
    "locator": "PROJECTS cards: eight listed assets, Hippo in project navigation. Capacity summary differences retained.",
    "sha256": "172edb89749ea38aa108584788b3edb211b03b030b0c46590e8d23fc7e6923ff",
    "access_method": "downloaded_primary_document",
    "license": "Publisher copyright retained. Bounded factual technical research with attribution; no open bulk reuse licence asserted. Original documents and images not redistributed.",
    "access_terms_url": "https://giga-storage.com/en/privacy-declaration/",
    "terms_assessment": "Public page and linked privacy/legal notice inspected; not an open data licence. Selected factual metadata only."
  },
  "giga_albatross_20261102": {
    "url": "https://giga-storage.com/en/projects/albatross/",
    "publisher": "GIGA Storage",
    "title": "GIGA Storage albatross",
    "retrieved_at": "2026-11-02T05:53:33+00:00",
    "published_date": null,
    "document_revision": null,
    "locator": "Project introduction, technical table, site description, partners and planning sections; see record extensions for exact sub-section.",
    "sha256": "05f8706e586e4d4dbe067680f51fb19432f9229c19b882e20a6a58c9fe40afd9",
    "access_method": "downloaded_primary_document",
    "license": "Publisher copyright retained. Bounded factual technical research with attribution; no open bulk reuse licence asserted. Original documents and images not redistributed.",
    "access_terms_url": "https://giga-storage.com/en/privacy-declaration/",
    "terms_assessment": "Public page and linked privacy/legal notice inspected; not an open data licence. Selected factual metadata only."
  },
  "giga_blue_marlin_20261102": {
    "url": "https://giga-storage.com/en/projects/blue-marlin/",
    "publisher": "GIGA Storage",
    "title": "GIGA Storage blue marlin",
    "retrieved_at": "2026-11-02T05:53:33+00:00",
    "published_date": null,
    "document_revision": null,
    "locator": "Project introduction, technical table, site description, partners and planning sections; see record extensions for exact sub-section.",
    "sha256": "3847cc8a18cfd60920bb3499ef7219c0a63762f5c88bfa0446467a05b1f6103b",
    "access_method": "downloaded_primary_document",
    "license": "Publisher copyright retained. Bounded factual technical research with attribution; no open bulk reuse licence asserted. Original documents and images not redistributed.",
    "access_terms_url": "https://giga-storage.com/en/privacy-declaration/",
    "terms_assessment": "Public page and linked privacy/legal notice inspected; not an open data licence. Selected factual metadata only."
  },
  "giga_buffalo_20261102": {
    "url": "https://giga-storage.com/en/projects/buffalo/",
    "publisher": "GIGA Storage",
    "title": "GIGA Storage buffalo",
    "retrieved_at": "2026-11-02T05:53:33+00:00",
    "published_date": null,
    "document_revision": null,
    "locator": "Project introduction, technical table, site description, partners and planning sections; see record extensions for exact sub-section.",
    "sha256": "6018e3bf733b6382b9a1349aba3ca01160ca18f8052bafedc5f583a5d5ae8eeb",
    "access_method": "downloaded_primary_document",
    "license": "Publisher copyright retained. Bounded factual technical research with attribution; no open bulk reuse licence asserted. Original documents and images not redistributed.",
    "access_terms_url": "https://giga-storage.com/en/privacy-declaration/",
    "terms_assessment": "Public page and linked privacy/legal notice inspected; not an open data licence. Selected factual metadata only."
  },
  "giga_giraffe_20261102": {
    "url": "https://giga-storage.com/en/projects/giraffe/",
    "publisher": "GIGA Storage",
    "title": "GIGA Storage giraffe",
    "retrieved_at": "2026-11-02T05:53:33+00:00",
    "published_date": null,
    "document_revision": null,
    "locator": "Project introduction, technical table, site description, partners and planning sections; see record extensions for exact sub-section.",
    "sha256": "35180612cd9a50ae9770874e17a4097d4a9aac57e7130b46c46300520f503b2e",
    "access_method": "downloaded_primary_document",
    "license": "Publisher copyright retained. Bounded factual technical research with attribution; no open bulk reuse licence asserted. Original documents and images not redistributed.",
    "access_terms_url": "https://giga-storage.com/en/privacy-declaration/",
    "terms_assessment": "Public page and linked privacy/legal notice inspected; not an open data licence. Selected factual metadata only."
  },
  "giga_green_turtle_20261102": {
    "url": "https://giga-storage.com/en/projects/green-turtle/",
    "publisher": "GIGA Storage",
    "title": "GIGA Storage green turtle",
    "retrieved_at": "2026-11-02T05:53:33+00:00",
    "published_date": null,
    "document_revision": null,
    "locator": "Project introduction, technical table, site description, partners and planning sections; see record extensions for exact sub-section.",
    "sha256": "6ecfe9c4413b551c6f748c621a222f12ed233fe755f33e3768a7e79ad201a121",
    "access_method": "downloaded_primary_document",
    "license": "Publisher copyright retained. Bounded factual technical research with attribution; no open bulk reuse licence asserted. Original documents and images not redistributed.",
    "access_terms_url": "https://giga-storage.com/en/privacy-declaration/",
    "terms_assessment": "Public page and linked privacy/legal notice inspected; not an open data licence. Selected factual metadata only."
  },
  "giga_hippo_nl_20261102": {
    "url": "https://giga-storage.com/en/projects/hippo-nl/",
    "publisher": "GIGA Storage",
    "title": "GIGA Storage hippo nl",
    "retrieved_at": "2026-11-02T05:53:33+00:00",
    "published_date": null,
    "document_revision": null,
    "locator": "Project introduction, technical table, site description, partners and planning sections; see record extensions for exact sub-section.",
    "sha256": "7b25c70b94abd0c10d4a77b1bd8db51f1776450f3e750efbce498576f0899d04",
    "access_method": "downloaded_primary_document",
    "license": "Publisher copyright retained. Bounded factual technical research with attribution; no open bulk reuse licence asserted. Original documents and images not redistributed.",
    "access_terms_url": "https://giga-storage.com/en/privacy-declaration/",
    "terms_assessment": "Public page and linked privacy/legal notice inspected; not an open data licence. Selected factual metadata only."
  },
  "giga_leo_20261102": {
    "url": "https://giga-storage.com/en/projects/leo/",
    "publisher": "GIGA Storage",
    "title": "GIGA Storage leo",
    "retrieved_at": "2026-11-02T05:53:33+00:00",
    "published_date": null,
    "document_revision": null,
    "locator": "Project introduction, technical table, site description, partners and planning sections; see record extensions for exact sub-section.",
    "sha256": "14b943d49d5542c0397b4a0b1ea426432e50deb6395633d97811387a0be1694e",
    "access_method": "downloaded_primary_document",
    "license": "Publisher copyright retained. Bounded factual technical research with attribution; no open bulk reuse licence asserted. Original documents and images not redistributed.",
    "access_terms_url": "https://giga-storage.com/en/privacy-declaration/",
    "terms_assessment": "Public page and linked privacy/legal notice inspected; not an open data licence. Selected factual metadata only."
  },
  "giga_leopard_20261102": {
    "url": "https://giga-storage.com/en/projects/leopard/",
    "publisher": "GIGA Storage",
    "title": "GIGA Storage leopard",
    "retrieved_at": "2026-11-02T05:53:33+00:00",
    "published_date": null,
    "document_revision": null,
    "locator": "Project introduction, technical table, site description, partners and planning sections; see record extensions for exact sub-section.",
    "sha256": "5ced95a3ba49d60b0e617f385201817edb2332d24080a5307edc1d793a54bf9f",
    "access_method": "downloaded_primary_document",
    "license": "Publisher copyright retained. Bounded factual technical research with attribution; no open bulk reuse licence asserted. Original documents and images not redistributed.",
    "access_terms_url": "https://giga-storage.com/en/privacy-declaration/",
    "terms_assessment": "Public page and linked privacy/legal notice inspected; not an open data licence. Selected factual metadata only."
  },
  "giga_rhino_20261102": {
    "url": "https://giga-storage.com/en/projects/rhino/",
    "publisher": "GIGA Storage",
    "title": "GIGA Storage rhino",
    "retrieved_at": "2026-11-02T05:53:33+00:00",
    "published_date": null,
    "document_revision": null,
    "locator": "Project introduction, technical table, site description, partners and planning sections; see record extensions for exact sub-section.",
    "sha256": "ca3747d146b427d2459ff79092be81326c92691a56bef11567c51c577fd406ce",
    "access_method": "downloaded_primary_document",
    "license": "Publisher copyright retained. Bounded factual technical research with attribution; no open bulk reuse licence asserted. Original documents and images not redistributed.",
    "access_terms_url": "https://giga-storage.com/en/privacy-declaration/",
    "terms_assessment": "Public page and linked privacy/legal notice inspected; not an open data licence. Selected factual metadata only."
  },
  "giga_lion_nl_20261102": {
    "url": "https://giga-storage.com/projecten/lion/",
    "publisher": "GIGA Storage",
    "title": "GIGA Storage lion nl",
    "retrieved_at": "2026-11-02T05:53:33+00:00",
    "published_date": null,
    "document_revision": null,
    "locator": "Project introduction, technical table, site description, partners and planning sections; see record extensions for exact sub-section.",
    "sha256": "bd05c5a6d995b84100ff580227582d9dff05fd43b2d40ca5f6676185c6f95e82",
    "access_method": "downloaded_primary_document",
    "license": "Publisher copyright retained. Bounded factual technical research with attribution; no open bulk reuse licence asserted. Original documents and images not redistributed.",
    "access_terms_url": "https://giga-storage.com/en/privacy-declaration/",
    "terms_assessment": "Public page and linked privacy/legal notice inspected; not an open data licence. Selected factual metadata only."
  },
  "giga_lion_start_20261102": {
    "url": "https://giga-storage.com/eerste-paal-geslagen-voor-giga-lion-in-amsterdam/",
    "publisher": "GIGA Storage",
    "title": "GIGA Storage lion start",
    "retrieved_at": "2026-11-02T05:53:33+00:00",
    "published_date": "2026-04-24",
    "document_revision": null,
    "locator": "PROJECT GIGA LION; construction date, 10 MW/43 MWh, IJpolder 10 kV and contractor roles.",
    "sha256": "e86e2f437ad8694eee0db95593ff5922d11c3197ca799e847d63e9c5aa9c7ad7",
    "access_method": "downloaded_primary_document",
    "license": "Publisher copyright retained. Bounded factual technical research with attribution; no open bulk reuse licence asserted. Original documents and images not redistributed.",
    "access_terms_url": "https://giga-storage.com/en/privacy-declaration/",
    "terms_assessment": "Public page and linked privacy/legal notice inspected; not an open data licence. Selected factual metadata only."
  },
  "giga_albatross_close_20261102": {
    "url": "https://giga-storage.com/en/giga-storage-bereikt-financial-close-voor-energieopslagproject-albatross-in-duitsland-en-bouwt-nu-aan-14-gw-in-drie-landen/",
    "publisher": "GIGA Storage",
    "title": "GIGA Storage albatross close",
    "retrieved_at": "2026-11-02T05:53:33+00:00",
    "published_date": "2026-10-26",
    "document_revision": null,
    "locator": "Opening paragraphs, financing, grid agreement, CATL role and schedule; portfolio aggregate wording excluded.",
    "sha256": "34dea058a298ddd6b027a447eba44457a503ee8058a7dee974c653753c1e8bf7",
    "access_method": "downloaded_primary_document",
    "license": "Publisher copyright retained. Bounded factual technical research with attribution; no open bulk reuse licence asserted. Original documents and images not redistributed.",
    "access_terms_url": "https://giga-storage.com/en/privacy-declaration/",
    "terms_assessment": "Public page and linked privacy/legal notice inspected; not an open data licence. Selected factual metadata only."
  },
  "giga_rhino_contract_20261102": {
    "url": "https://giga-storage.com/en/repowered-ondertekenen/",
    "publisher": "GIGA Storage",
    "title": "GIGA Storage rhino contract",
    "retrieved_at": "2026-11-02T05:53:33+00:00",
    "published_date": "2026-02-12",
    "document_revision": null,
    "locator": "Opening paragraphs: 12 MW/7.5 MWh, 2020 commissioning and prospective two-year Repowered contract.",
    "sha256": "b30208c5b7b9da01be05b36a53aad29c871465e7e6c7b130b74c544051256a62",
    "access_method": "downloaded_primary_document",
    "license": "Publisher copyright retained. Bounded factual technical research with attribution; no open bulk reuse licence asserted. Original documents and images not redistributed.",
    "access_terms_url": "https://giga-storage.com/en/privacy-declaration/",
    "terms_assessment": "Public page and linked privacy/legal notice inspected; not an open data licence. Selected factual metadata only."
  },
  "giga_leopard_close_20261102": {
    "url": "https://giga-storage.com/en/giga-storage-completes-%E2%82%AC300-million-financing-and-starts-construction-of-300mw-1200mwh-battery-storage-project-in-delfzijl/",
    "publisher": "GIGA Storage",
    "title": "GIGA Storage leopard close",
    "retrieved_at": "2026-11-02T05:53:33+00:00",
    "published_date": "2025-06-02",
    "document_revision": null,
    "locator": "Opening paragraphs: June 2025 construction, 300 MW/1200 MWh, financing and expected H2 2027 operation.",
    "sha256": "79fb41ee8c64bb3dbb6088e73d2c5476f4a2e2a9cbea1f28177378124097b2d5",
    "access_method": "downloaded_primary_document",
    "license": "Publisher copyright retained. Bounded factual technical research with attribution; no open bulk reuse licence asserted. Original documents and images not redistributed.",
    "access_terms_url": "https://giga-storage.com/en/privacy-declaration/",
    "terms_assessment": "Public page and linked privacy/legal notice inspected; not an open data licence. Selected factual metadata only."
  },
  "sembcorp_stacking_20251027": {
    "url": "https://www.sembcorp.com/sg/news-and-insights/news/2025/sembcorp-unveils-landmark-clean-energy-initiatives-on-jurong-island/",
    "publisher": "Sembcorp Industries",
    "title": "Sembcorp Unveils Landmark Clean Energy Initiatives on Jurong Island",
    "published_date": "2025-10-27",
    "retrieved_at": "2026-11-02T06:51:00+00:00",
    "locator": "Scaling up Singapore’s largest utility-scale energy storage system, paragraphs1–3",
    "access_method": "primary_web_retrieval",
    "sha256": null,
    "license": "Copyright owner retained; bounded factual research only, no source prose redistributed or open bulk licence asserted.",
    "access_note": "Original PDF returned403; primary HTML read through web retrieval. No original-byte checksum asserted."
  },
  "sembcorp_assets_20260630": {
    "url": "https://www.sembcorp.com/media/rwwnawta/2q2026-energy-and-water-assets.pdf",
    "publisher": "Sembcorp Industries",
    "title": "Energy and Water Assets as at June 30, 2026",
    "retrieved_at": "2026-11-02T08:18:00+00:00",
    "locator": "Page 1 named company rows; page 2 scope footnotes",
    "source_type": "primary",
    "license": "Publisher copyright retained; bounded factual research, no source prose or documents redistributed. No open bulk-reuse licence asserted.",
    "access_method": "downloaded_source",
    "sha256": "ce7015b70bab7f00a27ae850fb09e37936de80a64511e9b74059f13ab23570ca",
    "publication_date": "2026-06-30"
  },
  "sembcorp_nusantara_20250120": {
    "url": "https://www.sembcorp.com/id/en/news-and-insights/news/2025/sembcorp-and-pln-nusantara-power-launches-first-utility-scale-integrated-solar-and-energy-storage-project-in-indonesia/",
    "publisher": "Sembcorp Industries",
    "title": "Nusantara Sembcorp Solar Energi launch",
    "retrieved_at": "2026-11-02T08:18:00+00:00",
    "locator": "First two paragraphs; JV entities and battery/solar capacities",
    "source_type": "primary",
    "license": "Publisher copyright retained; bounded factual research, no source prose or documents redistributed. No open bulk-reuse licence asserted.",
    "access_method": "downloaded_html_and_primary_indexed_text",
    "sha256": "54dc4a0d4c3530c93306c1e462c14651e626905d43f171abc365a3d8c64d3bf3",
    "publication_date": "2025-01-20",
    "access_note": "Checksum identifies downloaded HTML bytes; indexed publisher text used where client-rendered content is absent from HTML."
  },
  "sembcorp_indonesia_portfolio_20261102": {
    "url": "https://www.sembcorp.com/id/en/our-solutions-in-indonesia/renewable-energy/utility-scale/",
    "publisher": "Sembcorp Industries",
    "title": "Indonesia utility-scale projects",
    "retrieved_at": "2026-11-02T08:18:00+00:00",
    "locator": "Nusantara and Morowali sections; PPA and development scope",
    "source_type": "primary",
    "license": "Publisher copyright retained; bounded factual research, no source prose or documents redistributed. No open bulk-reuse licence asserted.",
    "access_method": "downloaded_html_and_primary_indexed_text",
    "sha256": "5e905fa3862b4f73a7b4525a6f34f56799f5c6382ffb217e6499c7f8c983cb18",
    "access_note": "Checksum identifies downloaded HTML bytes; indexed publisher text used where client-rendered content is absent from HTML."
  },
  "pln_nusantara_flagship_20261102": {
    "url": "https://www.plnnusantarapower.co.id/about-us/achievements/green-flagship-projects",
    "publisher": "PLN Nusantara Power",
    "title": "Green flagship projects: IKN Nusantara SPP",
    "retrieved_at": "2026-11-02T08:18:00+00:00",
    "locator": "IKN Nusantara SPP capacity, location, connection and status bullets",
    "source_type": "primary",
    "license": "Publisher copyright retained; bounded factual research, no source prose or documents redistributed. No open bulk-reuse licence asserted.",
    "access_method": "primary_web_retrieval",
    "sha256": null,
    "access_note": "Direct download unsuccessful: curl: (22) The requested URL returned error: 503. Primary indexed text reviewed; checksum unavailable."
  },
  "sesna_morowali_20260406": {
    "url": "https://sesna.id/media/news/detail/sesmo-commences-262-mwp-solar-construction-with-bni-financing",
    "publisher": "SESNA",
    "title": "SESMO commences solar construction with BNI financing",
    "retrieved_at": "2026-11-02T08:18:00+00:00",
    "locator": "Opening paragraphs, project scope, capex and syndicated lender",
    "source_type": "primary",
    "license": "Publisher copyright retained; bounded factual research, no source prose or documents redistributed. No open bulk-reuse licence asserted.",
    "access_method": "downloaded_html_and_primary_indexed_text",
    "sha256": "0e3e18908a40bbbb0948e9e24465a0de4d2a3461a006eb99dfa9d38fe109ee40",
    "publication_date": "2026-04-06",
    "access_note": "Checksum identifies downloaded HTML bytes; indexed publisher text used where client-rendered content is absent from HTML."
  },
  "sesna_morowali_20260211": {
    "url": "https://sesna.id/media/news/detail/sesmo-secures-financial-close-for-262-mwp-captive-solar-pv-project-in-morowali-with-pt-smi-as-strategic-financier",
    "publisher": "SESNA",
    "title": "SESMO secures financial close",
    "retrieved_at": "2026-11-02T08:18:00+00:00",
    "locator": "Financial-close date, sponsors, PT SMI and early-2027 target",
    "source_type": "primary",
    "license": "Publisher copyright retained; bounded factual research, no source prose or documents redistributed. No open bulk-reuse licence asserted.",
    "access_method": "downloaded_html_and_primary_indexed_text",
    "sha256": "25357530198971131c978602e3d09f72abed0cc22393d31e4a8dec9f509a1bb5",
    "publication_date": "2026-02-11",
    "access_note": "Checksum identifies downloaded HTML bytes; indexed publisher text used where client-rendered content is absent from HTML."
  },
  "china_power_wuling_20230714": {
    "url": "https://www.chinapower.hk/sc/media/news-p230714.php",
    "publisher": "China Power International Development",
    "title": "Wuling projects connected and put into production in first half",
    "retrieved_at": "2026-11-02T08:18:00+00:00",
    "locator": "Storage paragraph naming Shujiatang and Qidong Baidishi; 100 MW / 200 MWh each",
    "source_type": "primary",
    "license": "Publisher copyright retained; bounded factual research, no source prose or documents redistributed. No open bulk-reuse licence asserted.",
    "access_method": "downloaded_source",
    "sha256": "8f14ddab34b1529a0872ee3221de2a6ff2dbbd72dc87aec4c4577d0f772fb889"
  },
  "sembcorp_china_storage_20261102": {
    "url": "https://www.sembcorp.com/cn/our-solutions-in-china/renewables/energy-storage-systems/",
    "publisher": "Sembcorp Industries",
    "title": "China energy storage systems",
    "retrieved_at": "2026-11-02T08:18:00+00:00",
    "locator": "Qidong June 2023 commissioning and Nanjing 0.4 MW / 0.4 MWh immersion-cooled demonstration",
    "source_type": "primary",
    "license": "Publisher copyright retained; bounded factual research, no source prose or documents redistributed. No open bulk-reuse licence asserted.",
    "access_method": "downloaded_html_and_primary_indexed_text",
    "sha256": "dc2f51ca2a4d7a60cb5d918cd3699273fac122e3404746f03947b78b15bfcf6b",
    "access_note": "Checksum identifies downloaded HTML bytes; indexed publisher text used where client-rendered content is absent from HTML."
  },
  "sembcorp_seci_award_20241218": {
    "url": "https://links.sgx.com/1.0.0/corporate-announcements/WSZ9V90R6M77WRIL/828228_SEMBCORP%20AWARDED%20SECI%20SOLAR-BESS%20PROJECT.pdf",
    "publisher": "Sembcorp Industries",
    "title": "First solar-energy storage hybrid project award in India",
    "retrieved_at": "2026-11-02T08:18:00+00:00",
    "locator": "Page 1 paragraphs 1-2; battery scope and conditional PPA",
    "source_type": "primary",
    "license": "Publisher copyright retained; bounded factual research, no source prose or documents redistributed. No open bulk-reuse licence asserted.",
    "access_method": "downloaded_source",
    "sha256": "fd402a19e24c5f659be45181c6e2ed4caa42caabad6d6956aa6f1b305ab95dc6",
    "publication_date": "2024-12-18"
  },
  "sembcorp_sjvn_award_20250529": {
    "url": "https://www.sembcorpindia.com/public/admin/upload/announcements_pdf/290525.pdf",
    "publisher": "Sembcorp Industries",
    "title": "Second solar-energy storage hybrid project award in India",
    "retrieved_at": "2026-11-02T08:18:00+00:00",
    "locator": "Page 1 paragraphs 1-2; battery scope and conditional PPA",
    "source_type": "primary",
    "license": "Publisher copyright retained; bounded factual research, no source prose or documents redistributed. No open bulk-reuse licence asserted.",
    "access_method": "downloaded_source",
    "sha256": "794b6d1f8d78c9af9e767883d38260ff7d0c8695b9a8289094e5cd5b853809c0",
    "publication_date": "2025-05-29"
  },
  "alinta_wagerup_operating_20261027": {
    "url": "https://www.alintaenergy.com.au/about-us/news-hub/wagerup-battery-now-operational",
    "publisher": "Alinta Energy",
    "title": "Wagerup Battery is now operational",
    "retrieved_at": "2026-11-02T08:18:00+00:00",
    "locator": "Opening paragraphs; 100 MW / 200 MWh and September commercial operation",
    "source_type": "primary",
    "license": "Publisher copyright retained; bounded factual research, no source prose or documents redistributed. No open bulk-reuse licence asserted.",
    "access_method": "downloaded_source",
    "sha256": "1a88760415f0100b143060dffc8b9e5ef43174690b97a4d7094c278381e3cb0c",
    "publication_date": "2026-10-27"
  },
  "alinta_reeves_delivery_20260915": {
    "url": "https://www.alintaenergy.com.au/about-us/news-hub/reeves-plains-first-battery-delivery",
    "publisher": "Alinta Energy",
    "title": "First batteries arrive at Reeves Plains",
    "retrieved_at": "2026-11-02T08:18:00+00:00",
    "locator": "Opening and delivery paragraphs; battery and inverter suppliers/counts",
    "source_type": "primary",
    "license": "Publisher copyright retained; bounded factual research, no source prose or documents redistributed. No open bulk-reuse licence asserted.",
    "access_method": "downloaded_source",
    "sha256": "6e34d89d858888b48f36adcfbbf019b5d8899c389c2defe476d8345e4f496104",
    "publication_date": "2026-09-15"
  },
  "alinta_reeves_phases_20261102": {
    "url": "https://www.reevesplainsenergyhub.com.au/project",
    "publisher": "Alinta Energy",
    "title": "Reeves Plains project status",
    "retrieved_at": "2026-11-02T08:18:00+00:00",
    "locator": "Current status section: stage 1 construction, stage 2 feasibility",
    "source_type": "primary",
    "license": "Publisher copyright retained; bounded factual research, no source prose or documents redistributed. No open bulk-reuse licence asserted.",
    "access_method": "downloaded_html_and_primary_indexed_text",
    "sha256": "d958d19ba59365d9520229c24d8519d7f792aa7c0fd60f9d0e583035298e0e8f",
    "access_note": "Checksum identifies downloaded HTML bytes; indexed publisher text used where client-rendered content is absent from HTML."
  },
  "wartsila_zenobe_20261102": {
    "url": "https://www.wartsila.com/energy/learn-more/references/ipps/zenobe",
    "title": "Zenobē reference portfolio",
    "publisher": "Wärtsilä",
    "retrieved_at": "2026-11-02T09:02:15.770663+00:00",
    "document_revision": "Undated live case study",
    "locator": "Overview, site-size table, Kilmarnock and Capenhurst paragraphs",
    "source_type": "primary",
    "sha256": "9ff3065d88e9f173dab0d16dc1a661ee192c75790f74c8747f52cf0d077a6ed6",
    "access_method": "downloaded_source",
    "license": "Wärtsilä copyright retained; no open bulk-reuse licence identified. Bounded factual case-study metadata only; original HTML and prose not redistributed."
  },
  "statkraft_20261102": {
    "url": "https://www.statkraft.ie/what-we-do/Grid-Services-and-Batteries/",
    "title": "Grid Services and Batteries",
    "publisher": "Statkraft",
    "retrieved_at": "2026-11-02T09:56:47.826966+00:00",
    "document_revision": "Undated live portfolio",
    "published_date": null,
    "locator": "Batteries paragraph and Battery projects in Ireland: Kilathmoy, Kelwin-2, Cushaling",
    "source_type": "primary",
    "sha256": "4b7ced50b0dc2d96cbbce3319592f854a8d3fbc5357f2796f0026b8e7e6426ee",
    "access_method": "downloaded_source",
    "license": "Terms https://www.statkraft.ie/terms-of-use/ permit referenced information in publications and require attribution; no bulk reuse licence asserted. Stored webpage material prohibited: downloaded HTML/text removed after terms review; only factual observations, URLs and checksums retained.",
    "checksum_note": "SHA256 covers downloaded bytes.",
    "raw_retention": "No raw page retained; source terms prohibit storage."
  },
  "kelwin_20261102": {
    "url": "https://www.statkraft.com/newsroom/news-and-stories/2021/statkraft-completes-second-irish-energy-storage-project/",
    "title": "Statkraft completes second Irish energy storage project",
    "publisher": "Statkraft",
    "retrieved_at": "2026-11-02T09:56:47.826966+00:00",
    "document_revision": "2021-04-06",
    "published_date": "2021-04-06",
    "locator": "Opening paragraph, EirGrid reserves paragraph, hybrid grid-connection paragraph",
    "source_type": "primary",
    "sha256": "617853590058084f6046f89d9cad191fdd8dc3f009df04bc37b0f5c610fec63c",
    "access_method": "downloaded_source",
    "license": "Terms https://www.statkraft.ie/terms-of-use/ permit referenced information in publications and require attribution; no bulk reuse licence asserted. Stored webpage material prohibited: downloaded HTML/text removed after terms review; only factual observations, URLs and checksums retained.",
    "checksum_note": "SHA256 covers downloaded bytes.",
    "raw_retention": "No raw page retained; source terms prohibit storage."
  },
  "cushaling_20261102": {
    "url": "https://www.statkraft.ie/news/2026/statkraft-officially-opens-irelands-first-4hour-duration-battery-energy-storage-system-at-cushaling-co.-offaly",
    "title": "Statkraft officially opens Ireland’s first 4-hour duration BESS at Cushaling",
    "publisher": "Statkraft",
    "retrieved_at": "2026-11-02T09:56:47.826966+00:00",
    "document_revision": "2026-02-17",
    "published_date": "2026-02-17",
    "locator": "Opening paragraph, co-location and three operating Irish BESS projects paragraph",
    "source_type": "primary",
    "sha256": "cb1b35fc505ba8fb165eab3a0769155a1cffb09420969ff67bf5a17a6b4b02b1",
    "access_method": "downloaded_source",
    "license": "Terms https://www.statkraft.ie/terms-of-use/ permit referenced information in publications and require attribution; no bulk reuse licence asserted. Stored webpage material prohibited: downloaded HTML/text removed after terms review; only factual observations, URLs and checksums retained.",
    "checksum_note": "SHA256 covers downloaded bytes.",
    "raw_retention": "No raw page retained; source terms prohibit storage."
  },
  "statkraft_kilathmoy_20261102": {
    "url": "https://www.statkraft.com/newsroom/news-and-stories/2020/statkraft-unveils-irelands-first-battery-project/",
    "title": "Statkraft unveils Ireland’s first battery project",
    "publisher": "Statkraft",
    "retrieved_at": "2026-11-02T09:56:47.826966+00:00",
    "document_revision": "2020-01-08",
    "published_date": "2020-01-08",
    "locator": "Location paragraph and Fluence / LG Chem delivery paragraph",
    "source_type": "primary",
    "sha256": null,
    "access_method": "search_indexed_primary_document",
    "license": "Terms https://www.statkraft.ie/terms-of-use/ permit referenced information in publications and require attribution; no bulk reuse licence asserted. Stored webpage material prohibited: downloaded HTML/text removed after terms review; only factual observations, URLs and checksums retained.",
    "checksum_note": "Original bytes unavailable to the local downloader (403) or source consulted through primary-page search rendering only; checksum deliberately null, not a text hash.",
    "raw_retention": "No raw page retained; source terms prohibit storage."
  },
  "statkraft_response_20261102": {
    "url": "https://www.statkraft.co.uk/newsroom/2021/statkraft-batteries-step-up-to-stabilise-the-grid-when-needed-the-most/",
    "title": "Statkraft batteries step up to stabilise the grid when needed the most",
    "publisher": "Statkraft",
    "retrieved_at": "2026-11-02T09:56:47.826966+00:00",
    "document_revision": "2021-05-04 as displayed",
    "published_date": "2021-05-04",
    "locator": "Kelwin-2 rated power / 49.8 Hz / 180 ms response and 1 April go-live paragraphs",
    "source_type": "primary",
    "sha256": null,
    "access_method": "search_indexed_primary_document",
    "license": "Terms https://www.statkraft.ie/terms-of-use/ permit referenced information in publications and require attribution; no bulk reuse licence asserted. Stored webpage material prohibited: downloaded HTML/text removed after terms review; only factual observations, URLs and checksums retained.",
    "checksum_note": "Original bytes unavailable to the local downloader (403) or source consulted through primary-page search rendering only; checksum deliberately null, not a text hash.",
    "raw_retention": "No raw page retained; source terms prohibit storage."
  },
  "powercomm_20261102": {
    "url": "https://www.powercomm.ie/projects/cushaling-bess",
    "title": "Cushaling BESS",
    "publisher": "Powercomm Group",
    "retrieved_at": "2026-11-02T09:56:47.826966+00:00",
    "document_revision": "Undated live case study",
    "published_date": null,
    "locator": "Project information, project timeline, 33 kV / 30-year project design, MV cable connection from 110 kV IPP substation",
    "source_type": "primary",
    "sha256": "5770082cbba927c5afb39764fb068fa145e87b0ba88438adbce794f93c144636",
    "access_method": "downloaded_source",
    "license": "Copyright retained; no open bulk-reuse licence found. Bounded factual review with attribution; no copyrighted page, table layout or document redistribution.",
    "checksum_note": "SHA256 covers downloaded bytes."
  },
  "kirby_20261102": {
    "url": "https://www.kirbygroup.com/project/poolbeg-bess-ireland/",
    "title": "Poolbeg BESS, Ireland",
    "publisher": "Kirby Group",
    "retrieved_at": "2026-11-02T09:56:47.826966+00:00",
    "document_revision": "Undated live case study",
    "published_date": null,
    "locator": "Project description and scope: electrical design/build, EirGrid 220 kV system, Poolbeg 220 kV substation",
    "source_type": "primary",
    "sha256": null,
    "access_method": "search_indexed_primary_document",
    "license": "Copyright retained; no open bulk-reuse licence found. Bounded factual review with attribution; no copyrighted page, table layout or document redistribution.",
    "checksum_note": "Original bytes unavailable to the local downloader (403) or source consulted through primary-page search rendering only; checksum deliberately null, not a text hash."
  },
  "collins_20261102_1052": {
    "url": "https://collinsbce.ie/kelwin-tarbert-substation/",
    "publisher": "Collins Building & Civil Engineering Ltd",
    "title": "Kelwin Tarbert Substation",
    "retrieved_at": "2026-11-02T10:51:40.900572+00:00",
    "published_date": null,
    "document_revision": null,
    "locator": "Heading and Scope of Works: 26 MW / 26.6 MWh; civil works; adjacency to 110 kV substation",
    "sha256": "694c1b35bfb7c5c1a628f1471af27bbe5038fc2c5af2a91e5453921e99ca30d3",
    "source_type": "primary",
    "access_method": "downloaded_original_bytes",
    "license": "Copyright retained. Footer and linked privacy policy inspected; no open bulk-reuse licence found. Selected factual specifications/observations only with attribution; no document, artwork, table layout or webpage redistribution.",
    "checksum_note": "SHA256 of original downloaded bytes; retained outside Git."
  },
  "gsc_acq_20261102_1052": {
    "url": "https://www.gorestreetcap.com/blog/gs-eu-completes-first-acquisition/",
    "publisher": "Gore Street Capital",
    "title": "Two Initial Acquisitions in the Republic of Ireland for Fund III: GS EU",
    "retrieved_at": "2026-11-02T10:51:48.502077+00:00",
    "published_date": "2026-08-24",
    "document_revision": null,
    "locator": "Transaction Information: capacities, ownership, readiness, grid/land/planning and forecast quarters",
    "sha256": "d3111b2435e1443fe77db847c99a5a789ad45adf6a4213c8659c73be4936ab08",
    "source_type": "primary",
    "access_method": "downloaded_original_bytes",
    "license": "Copyright retained. Footer and linked privacy policy inspected; no open bulk-reuse licence found. Selected factual specifications/observations only with attribution; no document, artwork, table layout or webpage redistribution.",
    "checksum_note": "SHA256 of original downloaded bytes; retained outside Git."
  },
  "gsc_japan_20261102_1052": {
    "url": "https://www.gorestreetcap.com/blog/initial-acquisition-for-japans-first-energy-storage-fund/",
    "publisher": "Gore Street Capital",
    "title": "Initial Acquisition for Japan’s First Energy Storage Fund",
    "retrieved_at": "2026-11-02T10:51:55.887013+00:00",
    "published_date": "2025-06-26",
    "document_revision": null,
    "locator": "Opening location/capacity/subsidy paragraphs and CIO quotation on auction participation",
    "sha256": "6edd6078cd759407ddcb5b34a3d1f969d1bb4f8b25089a0573b9374180dc7d30",
    "source_type": "primary",
    "access_method": "downloaded_original_bytes",
    "license": "Copyright retained. Footer and linked privacy policy inspected; no open bulk-reuse licence found. Selected factual specifications/observations only with attribution; no document, artwork, table layout or webpage redistribution.",
    "checksum_note": "SHA256 of original downloaded bytes; retained outside Git."
  },
  "itochu_20261102_1150": {
    "url": "https://www.itochu-bluestorage.com/common/file/20260403.pdf",
    "publisher": "IBeeT",
    "title": "IBeeT participation in six-site 174 MW battery consortium",
    "retrieved_at": "2026-11-02T11:51:30.855053+00:00",
    "published_date": "2026-04-03",
    "document_revision": null,
    "locator": "PDF page 2, exact model/project columns and shared rows; page 1 context; visually checked",
    "sha256": "d5f57d368b2f3074d9505490edbdaec305a248ca1426a90a3217f9ab16298927",
    "source_type": "primary",
    "access_method": "downloaded_original_bytes",
    "license": "Copyright retained. Site footer and linked privacy policy inspected; no open bulk-reuse licence asserted. Bounded factual extraction from selected public technical/news releases; no original pages, artwork or layout redistributed."
  },
  "shiroishi_20261102_1150": {
    "url": "https://www.itochu-bluestorage.com/common/file/20260828.pdf",
    "publisher": "IBeeT",
    "title": "Miyagi Shiroishi battery storage with Tokyu Land",
    "retrieved_at": "2026-11-02T11:52:13.306537+00:00",
    "published_date": "2026-08-28",
    "document_revision": null,
    "locator": "PDF page 2, exact model/project columns and shared rows; page 1 context; visually checked",
    "sha256": "8b8f7aa736ff9518d029310c68123f764534193df414dbc48c2739dfa7c7e8eb",
    "source_type": "primary",
    "access_method": "downloaded_original_bytes",
    "license": "Copyright retained. Site footer and linked privacy policy inspected; no open bulk-reuse licence asserted. Bounded factual extraction from selected public technical/news releases; no original pages, artwork or layout redistributed."
  },
  "chikuzen_20261102_1150": {
    "url": "https://www.itochu-bluestorage.com/common/file/20260601.pdf",
    "publisher": "ITOCHU Corporation",
    "title": "Joint battery storage business in Chikuzen",
    "retrieved_at": "2026-11-02T11:52:16.830890+00:00",
    "published_date": "2026-06-01",
    "document_revision": null,
    "locator": "PDF page 2, exact model/project columns and shared rows; page 1 context; visually checked",
    "sha256": "310d6edbb6d826794f27ce10a1aa74ee0ac0d48ed580d0df09ac334d13122d0e",
    "source_type": "primary",
    "access_method": "downloaded_original_bytes",
    "license": "Copyright retained. Site footer and linked privacy policy inspected; no open bulk-reuse licence asserted. Bounded factual extraction from selected public technical/news releases; no original pages, artwork or layout redistributed."
  },
  "renewvia_20261102_1300": {
    "url": "https://www.renewvia.com/minigrid-sites",
    "publisher": "Renewvia Energy Corporation",
    "title": "Operating mini-grid portfolio",
    "published_date": null,
    "document_revision": null,
    "retrieved_at": "2026-11-02T12:49:58.416388+00:00",
    "locator": "Named site headings and site paragraphs: Oloibiri, Akipelai, Ndeda, Kalobeyei Town and Settlement",
    "sha256": "9ae3edc704dcba735b24b2d2d9082bb7d1149bcca8322c6fe192fb04a6c8b4f8",
    "source_type": "primary",
    "access_method": "downloaded_original_bytes",
    "license": "Copyright retained; no open bulk-reuse licence identified. Bounded factual extraction only; no original document text, artwork or layout redistributed. OEM download index and June 2025 trade terms / owner page footer / UNITAR copyright notice inspected as applicable."
  },
  "allon_20261102_1300": {
    "url": "https://www.renewvia.com/post/renewvia-receives-1-2-million-commitment-from-all-on-to-electrify-communities-in-the-niger-delta",
    "publisher": "Renewvia Energy Corporation",
    "title": "All On commitment and operating Akipelai/Oloibiri mini-grids",
    "published_date": "2020-06-02",
    "document_revision": "2020-06-02",
    "retrieved_at": "2026-11-02T12:55:32.039024+00:00",
    "locator": "Release body dated June 2 2020; CMS date April 22 2021; first two systems and lithium-ion paragraph",
    "sha256": "2bd629d30c2e0ee134aaab984de6ec3d4fdaf405ef1903f73d4c50a6847325c8",
    "source_type": "primary",
    "access_method": "downloaded_original_bytes",
    "license": "Copyright retained; no open bulk-reuse licence identified. Bounded factual extraction only; no original document text, artwork or layout redistributed. OEM download index and June 2025 trade terms / owner page footer / UNITAR copyright notice inspected as applicable."
  },
  "reads_20261102_1300": {
    "url": "https://www.humanitarianenergy.org/assets/resources/Compressed_READS_Kenya.pdf",
    "publisher": "UNITAR",
    "title": "A Roadmap for Energy Access in Displacement Settings: Kenya",
    "published_date": "2023-08",
    "document_revision": "2023-08",
    "retrieved_at": "2026-11-02T12:55:26.773557+00:00",
    "locator": "Printed pages 89–91: Renewvia Kalobeyei project deep-dive; publication/copyright page 2",
    "sha256": "831ccba3bb96d8c11fe13a79bb9932259a9974ab9ac90c64551dbdd2744db4c9",
    "source_type": "primary",
    "access_method": "downloaded_original_bytes",
    "license": "Copyright retained; no open bulk-reuse licence identified. Bounded factual extraction only; no original document text, artwork or layout redistributed. OEM download index and June 2025 trade terms / owner page footer / UNITAR copyright notice inspected as applicable."
  },
  "africa_20261102_1300": {
    "url": "https://www.renewviaenergyafrica.com/",
    "publisher": "Renewvia Solar Africa",
    "title": "Renewvia Solar Africa: technical excellence",
    "published_date": null,
    "document_revision": null,
    "retrieved_at": "2026-11-02T12:56:14.951647+00:00",
    "locator": "Technical Excellence paragraph: Kalobeyei Settlement 541 kWp and 1.1 MWh",
    "sha256": "ffd0070f63deb3adf37d9e0eac849ac111fbc4d4d88810c88b9c2b637b3ab75e",
    "source_type": "primary",
    "access_method": "downloaded_original_bytes",
    "license": "Copyright retained; no open bulk-reuse licence identified. Bounded factual extraction only; no original document text, artwork or layout redistributed. OEM download index and June 2025 trade terms / owner page footer / UNITAR copyright notice inspected as applicable."
  },
  "1463636_20261102_1500": {
    "url": "https://nemsa.gov.ng/admin-request-for-inspection-rea-solar-mini-grid/entry/1463636/",
    "publisher": "Nigerian Electricity Management Services Agency (applicant declaration)",
    "title": "NEMSA inspection application: Fadama Bauna North (entry 1463636)",
    "published_date": null,
    "document_revision": null,
    "retrieved_at": "2026-11-02T14:52:14.129319+00:00",
    "locator": "Community/site, total storage, storage technology, owner and date rows; battery manufacturer/model and Total C10 capacity tables",
    "sha256": "68c5df49748e3f13302539d0631df5bff0d13a79f3e7a3cf2b8072b232c8e1dd",
    "source_type": "primary",
    "access_method": "downloaded_original_bytes",
    "license": "Copyright retained; no open bulk-reuse licence identified. Bounded factual extraction only; no full documents, artwork or page layout redistributed. Public OEM index/trade terms and NEMSA copyright footer inspected; not an open bulk licence.",
    "evidence_qualification": "Publicly indexed applicant inspection request, not regulator certification or commercial-operation evidence; personal contact and tax fields excluded.",
    "application_date": "2023-01-23"
  },
  "1479030_20261102_1500": {
    "url": "https://nemsa.gov.ng/admin-request-for-inspection-rea-solar-mini-grid/entry/1479030/",
    "publisher": "Nigerian Electricity Management Services Agency (applicant declaration)",
    "title": "NEMSA inspection application: Kalong (entry 1479030)",
    "published_date": null,
    "document_revision": null,
    "retrieved_at": "2026-11-02T14:52:22.830528+00:00",
    "locator": "Community/site, total storage, storage technology, owner and date rows; battery manufacturer/model and Total C10 capacity tables",
    "sha256": "1492728556db25369684e86d2b206fbf614343d31da3acdb25863c16704002d2",
    "source_type": "primary",
    "access_method": "downloaded_original_bytes",
    "license": "Copyright retained; no open bulk-reuse licence identified. Bounded factual extraction only; no full documents, artwork or page layout redistributed. Public OEM index/trade terms and NEMSA copyright footer inspected; not an open bulk licence.",
    "evidence_qualification": "Publicly indexed applicant inspection request, not regulator certification or commercial-operation evidence; personal contact and tax fields excluded.",
    "application_date": "2023-09-04"
  },
  "1511981_20261102_1500": {
    "url": "https://nemsa.gov.ng/admin-request-for-inspection-rea-solar-mini-grid/entry/1511981/",
    "publisher": "Nigerian Electricity Management Services Agency (applicant declaration)",
    "title": "NEMSA inspection application: Ibaragun (entry 1511981)",
    "published_date": null,
    "document_revision": null,
    "retrieved_at": "2026-11-02T14:52:33.433230+00:00",
    "locator": "Community/site, total storage, storage technology, owner and date rows; battery manufacturer/model and Total C10 capacity tables",
    "sha256": "be27244a75faa6458303942b5566da20d45df6c71dd687f750c9ae398565924f",
    "source_type": "primary",
    "access_method": "downloaded_original_bytes",
    "license": "Copyright retained; no open bulk-reuse licence identified. Bounded factual extraction only; no full documents, artwork or page layout redistributed. Public OEM index/trade terms and NEMSA copyright footer inspected; not an open bulk licence.",
    "evidence_qualification": "Publicly indexed applicant inspection request, not regulator certification or commercial-operation evidence; personal contact and tax fields excluded.",
    "application_date": "2024-10-18"
  },
  "1446317_20261102_1500": {
    "url": "https://nemsa.gov.ng/admin-request-for-inspection-rea-solar-mini-grid/entry/1446317/",
    "publisher": "Nigerian Electricity Management Services Agency (applicant declaration)",
    "title": "NEMSA inspection application: Mebiowa Okposi (entry 1446317)",
    "published_date": null,
    "document_revision": null,
    "retrieved_at": "2026-11-02T14:52:40.785423+00:00",
    "locator": "Community/site, total storage, storage technology, owner and date rows; battery manufacturer/model and Total C10 capacity tables",
    "sha256": "f38b1e7b8bdee994f477bb5f59a58ad01cd75a991e7f61c8e1c24ff089b34606",
    "source_type": "primary",
    "access_method": "downloaded_original_bytes",
    "license": "Copyright retained; no open bulk-reuse licence identified. Bounded factual extraction only; no full documents, artwork or page layout redistributed. Public OEM index/trade terms and NEMSA copyright footer inspected; not an open bulk licence.",
    "evidence_qualification": "Publicly indexed applicant inspection request, not regulator certification or commercial-operation evidence; personal contact and tax fields excluded.",
    "application_date": "2022-10-20"
  },
  "1442720_20261102_1500": {
    "url": "https://nemsa.gov.ng/admin-request-for-inspection-rea-solar-mini-grid/entry/1442720/",
    "publisher": "Nigerian Electricity Management Services Agency (applicant declaration)",
    "title": "NEMSA inspection application: Mebiowa Okposi (earlier entry 1442720)",
    "published_date": null,
    "document_revision": null,
    "retrieved_at": "2026-11-02T14:52:52.141410+00:00",
    "locator": "Community/coordinates/owner identifying same site; malformed total storage field",
    "sha256": "c5bf7ec4375e4ab6587e5aa6d68f3c006d65a5d3b90c189a9ff200aa4eda6ea7",
    "source_type": "primary",
    "access_method": "downloaded_original_bytes",
    "license": "Copyright retained; no open bulk-reuse licence identified. Bounded factual extraction only; no full documents, artwork or page layout redistributed. Public OEM index/trade terms and NEMSA copyright footer inspected; not an open bulk licence.",
    "evidence_qualification": "Publicly indexed applicant inspection request, not regulator certification or commercial-operation evidence; personal contact and tax fields excluded.",
    "application_date": "2022-08-11"
  },
  "1462965_20261102_1500": {
    "url": "https://nemsa.gov.ng/admin-request-for-inspection-rea-solar-mini-grid/entry/1462965/",
    "publisher": "Nigerian Electricity Management Services Agency (applicant declaration)",
    "title": "NEMSA inspection application: Eriwe (entry 1462965)",
    "published_date": null,
    "document_revision": null,
    "retrieved_at": "2026-11-02T14:52:58.875708+00:00",
    "locator": "Community/site, total storage, storage technology, owner and date rows; battery manufacturer/model and Total C10 capacity tables",
    "sha256": "73f8e7b7e3480c1bd418bb7197bceea0d460f61482ba7e917798887b57d3f5c9",
    "source_type": "primary",
    "access_method": "downloaded_original_bytes",
    "license": "Copyright retained; no open bulk-reuse licence identified. Bounded factual extraction only; no full documents, artwork or page layout redistributed. Public OEM index/trade terms and NEMSA copyright footer inspected; not an open bulk licence.",
    "evidence_qualification": "Publicly indexed applicant inspection request, not regulator certification or commercial-operation evidence; personal contact and tax fields excluded.",
    "application_date": "2023-01-12"
  },
  "1466822_20261102_1500": {
    "url": "https://nemsa.gov.ng/admin-request-for-inspection-rea-solar-mini-grid/entry/1466822/",
    "publisher": "Nigerian Electricity Management Services Agency (applicant declaration)",
    "title": "NEMSA inspection application: Fagbo (entry 1466822)",
    "published_date": null,
    "document_revision": null,
    "retrieved_at": "2026-11-02T14:53:09.298759+00:00",
    "locator": "Community/site, total storage, storage technology, owner and date rows; battery manufacturer/model and Total C10 capacity tables",
    "sha256": "11c2c6e015942d746712beafc12e4736b24f6d142ae23a42cd4df212b2c78c5a",
    "source_type": "primary",
    "access_method": "downloaded_original_bytes",
    "license": "Copyright retained; no open bulk-reuse licence identified. Bounded factual extraction only; no full documents, artwork or page layout redistributed. Public OEM index/trade terms and NEMSA copyright footer inspected; not an open bulk licence.",
    "evidence_qualification": "Publicly indexed applicant inspection request, not regulator certification or commercial-operation evidence; personal contact and tax fields excluded.",
    "application_date": "2023-03-20"
  },
  "1462943_20261102_1500": {
    "url": "https://nemsa.gov.ng/admin-request-for-inspection-rea-solar-mini-grid/entry/1462943/",
    "publisher": "Nigerian Electricity Management Services Agency (applicant declaration)",
    "title": "NEMSA inspection application: Gurin (entry 1462943)",
    "published_date": null,
    "document_revision": null,
    "retrieved_at": "2026-11-02T14:53:19.893139+00:00",
    "locator": "Community/site, total storage, storage technology, owner and date rows; battery manufacturer/model and Total C10 capacity tables",
    "sha256": "3632cb0059aabf43baff8268cdb3551fbda8d0c5d4c830a857f690d7d1b694da",
    "source_type": "primary",
    "access_method": "downloaded_original_bytes",
    "license": "Copyright retained; no open bulk-reuse licence identified. Bounded factual extraction only; no full documents, artwork or page layout redistributed. Public OEM index/trade terms and NEMSA copyright footer inspected; not an open bulk licence.",
    "evidence_qualification": "Publicly indexed applicant inspection request, not regulator certification or commercial-operation evidence; personal contact and tax fields excluded.",
    "application_date": "2023-01-12"
  },
  "1445190_20261102_1500": {
    "url": "https://nemsa.gov.ng/admin-request-for-inspection-rea-solar-mini-grid/entry/1445190/",
    "publisher": "Nigerian Electricity Management Services Agency (applicant declaration)",
    "title": "NEMSA inspection application: Emereoke (entry 1445190)",
    "published_date": null,
    "document_revision": null,
    "retrieved_at": "2026-11-02T14:53:33.201593+00:00",
    "locator": "Community/site, total storage, storage technology, owner and date rows; battery manufacturer/model and Total C10 capacity tables",
    "sha256": "47fd61ce839d0f4a9684e2ad5ff11e24029ed01fd0d24d59889eca71c8da5ad4",
    "source_type": "primary",
    "access_method": "downloaded_original_bytes",
    "license": "Copyright retained; no open bulk-reuse licence identified. Bounded factual extraction only; no full documents, artwork or page layout redistributed. Public OEM index/trade terms and NEMSA copyright footer inspected; not an open bulk licence.",
    "evidence_qualification": "Publicly indexed applicant inspection request, not regulator certification or commercial-operation evidence; personal contact and tax fields excluded.",
    "application_date": "2022-09-25"
  },
  "1542697_20261102_1500": {
    "url": "https://nemsa.gov.ng/admin-request-for-inspection-rea-solar-mini-grid/entry/1542697/",
    "publisher": "Nigerian Electricity Management Services Agency (applicant declaration)",
    "title": "NEMSA inspection application: Gamakai (entry 1542697)",
    "published_date": null,
    "document_revision": null,
    "retrieved_at": "2026-11-02T14:53:40.640362+00:00",
    "locator": "Community/site, total storage, storage technology, owner and date rows; battery manufacturer/model and Total C10 capacity tables",
    "sha256": "b77da98e846db0068b88a6fe741b09d4bce079ed10f4a206a37165210b50df33",
    "source_type": "primary",
    "access_method": "downloaded_original_bytes",
    "license": "Copyright retained; no open bulk-reuse licence identified. Bounded factual extraction only; no full documents, artwork or page layout redistributed. Public OEM index/trade terms and NEMSA copyright footer inspected; not an open bulk licence.",
    "evidence_qualification": "Publicly indexed applicant inspection request, not regulator certification or commercial-operation evidence; personal contact and tax fields excluded.",
    "application_date": "2025-11-28"
  },
  "uyo_20261102_1600": {
    "url": "https://nemsa.gov.ng/admin-request-for-inspection-rea-solar-mini-grid/entry/1542032/",
    "publisher": "Nigerian Electricity Management Services Agency (applicant declaration)",
    "title": "NEMSA inspection application: University of Uyo, entry 1542032",
    "published_date": null,
    "document_revision": null,
    "retrieved_at": "2026-11-02T15:58:04.195822+00:00",
    "locator": "Site identity, owner, storage/PV summary and battery manufacturer/model/voltage tables; application 2025-11-14",
    "sha256": "11c9a879e42bbf15e29bc16665756fddd121914259186cc8b789930d911320f9",
    "source_type": "primary",
    "access_method": "downloaded_original_bytes",
    "license": "Copyright retained; no open bulk-reuse licence identified. Bounded factual extraction only; original documents, artwork and table layout not redistributed.",
    "evidence_qualification": "Applicant inspection request, not certification or proof of commercial operation"
  },
  "toto_20261102_1600": {
    "url": "https://nemsa.gov.ng/admin-request-for-inspection-rea-solar-mini-grid/entry/1467329/",
    "publisher": "Nigerian Electricity Management Services Agency (applicant declaration)",
    "title": "NEMSA inspection application: Toto, entry 1467329",
    "published_date": null,
    "document_revision": null,
    "retrieved_at": "2026-11-02T15:58:14.701251+00:00",
    "locator": "Site identity, owner, storage/PV summary and five battery-bank rows; application 2023-03-27",
    "sha256": "809176afc9e192383b870d4f6f88d31530ebde3b9ed83eec534e6f6d37e3842e",
    "source_type": "primary",
    "access_method": "downloaded_original_bytes",
    "license": "Copyright retained; no open bulk-reuse licence identified. Bounded factual extraction only; original documents, artwork and table layout not redistributed.",
    "evidence_qualification": "Applicant inspection request, not certification or proof of commercial operation"
  },
  "totoowner_20261102_1600": {
    "url": "https://powergen-renewable-energy.com/press-release-nigerias-first-interconnected-hybrid-solar-mini-grid-plant-commissioned-in-toto-community-nasarawa-state/",
    "publisher": "PowerGen Renewable Energy",
    "title": "Toto interconnected solar hybrid mini-grid commissioned",
    "published_date": "2025-07-12",
    "document_revision": null,
    "retrieved_at": "2026-11-02T16:01:56.552670+00:00",
    "locator": "Title and opening three paragraphs; website labels post July 12 2025, not accepted as exact commissioning date",
    "sha256": null,
    "source_type": "primary",
    "access_method": "primary_document_text_via_search_service",
    "license": "Copyright retained; no open bulk-reuse licence identified. Bounded factual extraction only; original documents, artwork and table layout not redistributed.",
    "evidence_qualification": "Owner announcement of completed commissioning; publication date is not commissioning date",
    "download_limitation": "Direct download returned 406; search-service primary text reviewed. No bypass; checksum unavailable."
  },
  "1463636_20261102_1600": {
    "url": "https://nemsa.gov.ng/admin-request-for-inspection-rea-solar-mini-grid/entry/1463636/",
    "publisher": "Nigerian Electricity Management Services Agency (applicant declaration)",
    "title": "NEMSA battery electrical table: Fadama Bauna North",
    "published_date": null,
    "document_revision": null,
    "retrieved_at": "2026-11-02T16:02:04.684558+00:00",
    "locator": "Battery table: cell voltage, battery voltage, charge voltage, Series | Parallel; application identity unchanged",
    "sha256": "d24b5f57f25e8687662a9226563ac0b2973baff6218ed1673d62da5d20f3852d",
    "source_type": "primary",
    "access_method": "downloaded_original_bytes",
    "license": "Copyright retained; no open bulk-reuse licence identified. Bounded factual extraction only; original documents, artwork and table layout not redistributed.",
    "evidence_qualification": "Applicant inspection request, not certification or proof of commercial operation"
  },
  "1462965_20261102_1600": {
    "url": "https://nemsa.gov.ng/admin-request-for-inspection-rea-solar-mini-grid/entry/1462965/",
    "publisher": "Nigerian Electricity Management Services Agency (applicant declaration)",
    "title": "NEMSA battery electrical table: Eriwe",
    "published_date": null,
    "document_revision": null,
    "retrieved_at": "2026-11-02T16:02:11.932764+00:00",
    "locator": "Battery table: cell voltage, battery voltage, charge voltage, Series | Parallel; application identity unchanged",
    "sha256": "3c27dcecc4d8fdd610d27ec08c6c91b8b1bb54fa233e373f2572d873efa74c45",
    "source_type": "primary",
    "access_method": "downloaded_original_bytes",
    "license": "Copyright retained; no open bulk-reuse licence identified. Bounded factual extraction only; original documents, artwork and table layout not redistributed.",
    "evidence_qualification": "Applicant inspection request, not certification or proof of commercial operation"
  },
  "1511981_20261102_1600": {
    "url": "https://nemsa.gov.ng/admin-request-for-inspection-rea-solar-mini-grid/entry/1511981/",
    "publisher": "Nigerian Electricity Management Services Agency (applicant declaration)",
    "title": "NEMSA battery electrical table: Ibaragun",
    "published_date": null,
    "document_revision": null,
    "retrieved_at": "2026-11-02T16:02:20.287746+00:00",
    "locator": "Battery table: cell voltage, battery voltage, charge voltage, Series | Parallel; application identity unchanged",
    "sha256": "e3ba93550bcde5d32b24fc0b66dd0a4b2e3a93432170de991001c1d0ecf10d2e",
    "source_type": "primary",
    "access_method": "downloaded_original_bytes",
    "license": "Copyright retained; no open bulk-reuse licence identified. Bounded factual extraction only; original documents, artwork and table layout not redistributed.",
    "evidence_qualification": "Applicant inspection request, not certification or proof of commercial operation"
  },
  "cei2025_20261102_1600": {
    "url": "https://cei-africa.com/news/cei-africa-provides-usd-4-475-million-to-renewvia-to-expand-solar-power-for-refugees-and-host-communities-in-kakuma-and-kalobeyei/",
    "publisher": "CEI Africa",
    "title": "Renewvia Kakuma/Kalobeyei expansion financing: cei2025",
    "published_date": "2025-03-21",
    "document_revision": null,
    "retrieved_at": "2026-11-02T16:12:49.829115+00:00",
    "sha256": "cc055d2607429c796106dbf5b12c89658490abfddf706ca393d2e18b393e33e9",
    "source_type": "primary",
    "access_method": "downloaded_original_bytes",
    "locator": "Opening financing and existing-plant/expansion paragraphs",
    "license": "Copyright retained; bounded factual extraction only. CEI disclaimer and owner footer inspected; no open bulk-reuse licence.",
    "terms_url": "https://cei-africa.com/disclaimer/"
  },
  "cei2023_20261102_1600": {
    "url": "https://www.renewvia.com/post/cei-africa-awards-a-total-of-usd-7-3m-in-rbf-grants-to-3-kenyan-gmg-developers",
    "publisher": "Renewvia Energy (CEI Africa announcement)",
    "title": "Renewvia Kakuma/Kalobeyei expansion financing: cei2023",
    "published_date": "2023-05-31",
    "document_revision": null,
    "retrieved_at": "2026-11-02T16:12:54.401381+00:00",
    "sha256": "14c53a8b2edaabcfacf56871fc38f858f0224d7a6fc676c2d84f94c5f56f4b43",
    "source_type": "primary",
    "access_method": "downloaded_original_bytes",
    "locator": "Renewvia grant and planned 2.4 MW / 6 MWh paragraphs; release date May 31, site posting July 12",
    "license": "Copyright retained; bounded factual extraction only. CEI disclaimer and owner footer inspected; no open bulk-reuse licence.",
    "terms_url": "https://www.renewvia.com/pressreleases"
  },
  "gopa_lithops_20261102": {
    "access_method": "downloaded_html",
    "document_version": "Undated page; retrieved 2026-11-02",
    "license": "Copyright retained; bounded factual observations and attribution only; no open licence asserted.",
    "locator": "Challenge, project facts and impact-in-numbers sections",
    "publisher": "GOPA",
    "retrieved_at": "2026-11-02T16:54:05.842764+00:00",
    "sha256": "6355711f4f5b2ee8bc38c50a2dfe4c2d76458f3c7c9722c320829bfeebd58925",
    "source_type": "primary",
    "title": "Lithops battery: owner engineer technical requirements",
    "url": "https://www.gopa.eu/en/projects/flagship/namibia-lithops-battery-storage/"
  },
  "odre_battery_ge1mw_0_20260831": {
    "access_method": "downloaded_json",
    "document_version": "2026-08-31; metadata modified 2026-10-13; data processed 2026-10-20",
    "license": "Licence Ouverte v2.0 (Etalab). Attribution: RTE, Enedis, EDF SEI, ELD; register at 2026-08-31, retrieved 2026-11-02. https://www.etalab.gouv.fr/licence-ouverte-open-licence",
    "locator": "API results; exact row EIC identified in each record external_ids_json and review ledger",
    "publisher": "RTE, Enedis, EDF SEI, ELD",
    "retrieved_at": "2026-11-02T16:57:42.442850+00:00",
    "sha256": "daad0c57f835e1a36d22394ae113589b4378cf8a5e6dc31e4440f71c481519fb",
    "source_type": "primary",
    "title": "National electricity installation register: odre_battery_ge1mw_0",
    "url": "https://odre.opendatasoft.com/api/explore/v2.1/catalog/datasets/registre-national-installation-production-stockage-electricite-agrege/records?where=filiere%3D%27Stockage+non+hydraulique%27+and+technologie%3D%27Batterie%27+and+typestockage%3D%27BATTE%27+and+puismaxinstallee%3E%3D1000&order_by=codeeicresourceobject&limit=100&offset=0"
  },
  "odre_battery_ge1mw_1_20260831": {
    "access_method": "downloaded_json",
    "document_version": "2026-08-31; metadata modified 2026-10-13; data processed 2026-10-20",
    "license": "Licence Ouverte v2.0 (Etalab). Attribution: RTE, Enedis, EDF SEI, ELD; register at 2026-08-31, retrieved 2026-11-02. https://www.etalab.gouv.fr/licence-ouverte-open-licence",
    "locator": "API results; exact row EIC identified in each record external_ids_json and review ledger",
    "publisher": "RTE, Enedis, EDF SEI, ELD",
    "retrieved_at": "2026-11-02T16:57:48.655634+00:00",
    "sha256": "2934179cadc60f6c7ca23d57479ff72aac36e720aa86ed9e9d8596cb221caa40",
    "source_type": "primary",
    "title": "National electricity installation register: odre_battery_ge1mw_1",
    "url": "https://odre.opendatasoft.com/api/explore/v2.1/catalog/datasets/registre-national-installation-production-stockage-electricite-agrege/records?where=filiere%3D%27Stockage+non+hydraulique%27+and+technologie%3D%27Batterie%27+and+typestockage%3D%27BATTE%27+and+puismaxinstallee%3E%3D1000&order_by=codeeicresourceobject&limit=100&offset=100"
  },
  "odre_eic_renaming_202601": {
    "access_method": "downloaded_document",
    "document_version": "January 2026; v2 attachment",
    "license": "Licence Ouverte v2.0 (Etalab); attribution RTE / ODRÉ. Linked attachment to the openly licensed national register.",
    "locator": "Page 1: BARBAS01, previous EIC 17W000001600745Y, 2026 EIC 17W000001637626Q",
    "publisher": "RTE / ODRÉ",
    "retrieved_at": "2026-11-02T17:09:31.720935+00:00",
    "sha256": "9010abd65fdad62f9d9607ab47a8a17d231c7ef48f97f406b4e8aea15655ab99",
    "source_type": "primary",
    "title": "Modification de 79 codes EIC en W dans le registre national des installations de production et de stockage",
    "url": "https://odre.opendatasoft.com/api/explore/v2.1/catalog/datasets/registre-national-installation-production-stockage-electricite-agrege/attachments/note_d_information_concernant_les_modifications_de_79_codes_eic_v2_pdf"
  },
  "odre_glossary_20261102": {
    "access_method": "downloaded_document",
    "document_version": null,
    "license": "Licence Ouverte v2.0 (Etalab). Attribution: RTE, Enedis, EDF SEI, ELD; register at 2026-08-31, retrieved 2026-11-02. https://www.etalab.gouv.fr/licence-ouverte-open-licence",
    "locator": "Field definitions: EIC, location, commissioning, power, stored and annual energy; aggregate policy",
    "publisher": "RTE / ODRÉ",
    "retrieved_at": "2026-11-02T17:03:49.439266+00:00",
    "sha256": "e73caf2ea0be886efb7dda2734b0e4ce4112c1577b9c0558ccec9d7a967d9f0e",
    "source_type": "primary",
    "title": "National register field glossary",
    "url": "https://odre.opendatasoft.com/api/explore/v2.1/catalog/datasets/registre-national-installation-production-stockage-electricite-agrege/attachments/11_glossaire_gpc_registre_des_installations_vrte_docx"
  },
  "odre_rte_20260831": {
    "access_method": "downloaded_json",
    "document_version": "2026-08-31; metadata modified 2026-10-13; data processed 2026-10-20",
    "license": "Licence Ouverte v2.0 (Etalab). Attribution: RTE, Enedis, EDF SEI, ELD; register at 2026-08-31, retrieved 2026-11-02. https://www.etalab.gouv.fr/licence-ouverte-open-licence",
    "locator": "API results; exact row EIC identified in each record external_ids_json and review ledger",
    "publisher": "RTE, Enedis, EDF SEI, ELD",
    "retrieved_at": "2026-11-02T16:58:38.152944+00:00",
    "sha256": "01f61b90ae310ee022acc9d973fa07c261c9d6a37fb0e607a1fabbe21a3ca15f",
    "source_type": "primary",
    "title": "National electricity installation register: odre_rte",
    "url": "https://odre.opendatasoft.com/api/explore/v2.1/catalog/datasets/registre-national-installation-production-stockage-electricite-agrege/records?where=filiere%3D%27Stockage+non+hydraulique%27+and+technologie%3D%27Batterie%27+and+typestockage%3D%27BATTE%27+and+gestionnaire%3D%27RTE%27&order_by=codeeicresourceobject&limit=100"
  },
  "odre_partition_2_20261102": {
    "url": "https://odre.opendatasoft.com/api/explore/v2.1/catalog/datasets/registre-national-installation-production-stockage-electricite-agrege/records?where=filiere%3D%27Stockage+non+hydraulique%27+and+technologie%3D%27Batterie%27+and+typestockage%3D%27BATTE%27+and+puismaxinstallee%3E%3D1000&order_by=codeeicresourceobject&limit=100&offset=200",
    "sha256": "853f52eda60b0cf0120acfcdb54d5cefd238c964b6850002db98f5ea603c00a8",
    "retrieved_at": "2026-11-02T17:54:02.275718+00:00",
    "title": "National battery installation register, offset 200",
    "publisher": "RTE, Enedis, EDF SEI, ELD",
    "source_type": "primary",
    "access_method": "downloaded_json",
    "locator": "API results; exact EIC and source row in review ledger",
    "license": "Etalab Open Licence v2.0; attribution RTE, Enedis, EDF SEI, ELD",
    "document_version": "Reporting 2026-08-31; processed 2026-10-20"
  },
  "odre_partition_3_20261102": {
    "url": "https://odre.opendatasoft.com/api/explore/v2.1/catalog/datasets/registre-national-installation-production-stockage-electricite-agrege/records?where=filiere%3D%27Stockage+non+hydraulique%27+and+technologie%3D%27Batterie%27+and+typestockage%3D%27BATTE%27+and+puismaxinstallee%3E%3D1000&order_by=codeeicresourceobject&limit=100&offset=300",
    "sha256": "2dbfc34884bbbe0f85aa7158fd3e5772eee9873f8ba43b00a7e9f8e967154e93",
    "retrieved_at": "2026-11-02T17:54:06.166082+00:00",
    "title": "National battery installation register, offset 300",
    "publisher": "RTE, Enedis, EDF SEI, ELD",
    "source_type": "primary",
    "access_method": "downloaded_json",
    "locator": "API results; exact EIC and source row in review ledger",
    "license": "Etalab Open Licence v2.0; attribution RTE, Enedis, EDF SEI, ELD",
    "document_version": "Reporting 2026-08-31; processed 2026-10-20"
  },
  "rte_bellac_project_20261102": {
    "url": "https://www.rte-france.com/projets/nos-projets/stocker-lelectricite-renouvelable-lexperimentation-ringo-bellac-haute-vienne",
    "sha256": "cf7d7fa67c85678339187de7188ec5b21e68c20bbe613b8e42500be6f25c920d",
    "retrieved_at": "2026-11-02T17:58:11.166999+00:00",
    "publisher": "RTE",
    "title": "Stocker l’électricité renouvelable : expérimentation Ringo à Bellac",
    "source_type": "primary",
    "access_method": "downloaded_html",
    "locator": "Bellac: territoire favorable; expérimentation industrielle; 12 containers and Saft assembly in Bordeaux",
    "license": "Copyright retained; bounded factual review only, no open bulk licence asserted",
    "document_version": "Undated project page; December 2020 installation caption"
  },
  "odre_partition_4_20261102": {
    "url": "https://odre.opendatasoft.com/api/explore/v2.1/catalog/datasets/registre-national-installation-production-stockage-electricite-agrege/records?where=filiere%3D%27Stockage+non+hydraulique%27+and+technologie%3D%27Batterie%27+and+typestockage%3D%27BATTE%27+and+puismaxinstallee%3E%3D1000&order_by=codeeicresourceobject&limit=100&offset=400",
    "sha256": "ff72cb71ea1364777e38a03a97f21c6da1bf09be12b082e9cd20204356c58d5b",
    "retrieved_at": "2026-11-02T18:56:18.517500+00:00",
    "title": "National battery installation register, offset 400",
    "publisher": "RTE, Enedis, EDF SEI, ELD",
    "source_type": "primary",
    "access_method": "downloaded_json",
    "locator": "API results; exact EIC and source row in review ledger",
    "license": "Etalab Open Licence v2.0; attribution RTE, Enedis, EDF SEI, ELD",
    "document_version": "Reporting 2026-08-31; processed 2026-10-20"
  },
  "odre_partition_5_20261102": {
    "url": "https://odre.opendatasoft.com/api/explore/v2.1/catalog/datasets/registre-national-installation-production-stockage-electricite-agrege/records?where=filiere%3D%27Stockage+non+hydraulique%27+and+technologie%3D%27Batterie%27+and+typestockage%3D%27BATTE%27+and+puismaxinstallee%3E%3D1000&order_by=codeeicresourceobject&limit=100&offset=500",
    "sha256": "120f173110ca8b23467b74d31a8df9c07c21651f7d86868b86a91d16864d1821",
    "retrieved_at": "2026-11-02T18:56:23.493942+00:00",
    "title": "National battery installation register, offset 500",
    "publisher": "RTE, Enedis, EDF SEI, ELD",
    "source_type": "primary",
    "access_method": "downloaded_json",
    "locator": "API results; exact EIC and source row in review ledger",
    "license": "Etalab Open Licence v2.0; attribution RTE, Enedis, EDF SEI, ELD",
    "document_version": "Reporting 2026-08-31; processed 2026-10-20"
  },
  "rte_ventavon_project_20261102": {
    "url": "https://www.rte-france.com/projets/nos-projets/stocker-lelectricite-lexperimentation-ringo-ventavon",
    "sha256": "d3fd255e252867d8e0ed7e01216695617f0d210c53b563002f00e9fc87a29e3b",
    "retrieved_at": "2026-11-02T19:50:41.406910+00:00",
    "publisher": "RTE",
    "title": "Stocker l’électricité : expérimentation RINGO à Ventavon",
    "source_type": "primary",
    "access_method": "downloaded_html",
    "locator": "Industrial suppliers paragraph and Ventavon strategic junction paragraph",
    "license": "Copyright retained; bounded factual review only",
    "document_version": "Undated historical project page"
  },
  "odre_partition_6_20261102": {
    "url": "https://odre.opendatasoft.com/api/explore/v2.1/catalog/datasets/registre-national-installation-production-stockage-electricite-agrege/records?where=filiere%3D%27Stockage+non+hydraulique%27+and+technologie%3D%27Batterie%27+and+typestockage%3D%27BATTE%27+and+puismaxinstallee%3E%3D1000&order_by=codeeicresourceobject&limit=100&offset=600",
    "sha256": "a606938e5ba3d6b491ef0a10ea470b4d99be583fa2d3c44f6b2725542b4c8213",
    "retrieved_at": "2026-11-02T19:51:08.530643+00:00",
    "title": "National battery installation register, offset 600",
    "publisher": "RTE, Enedis, EDF SEI, ELD",
    "source_type": "primary",
    "access_method": "downloaded_json",
    "locator": "API results; exact EIC and source row in review ledger",
    "license": "Etalab Open Licence v2.0; attribution RTE, Enedis, EDF SEI, ELD",
    "document_version": "Reporting 2026-08-31; processed 2026-10-20"
  },
  "odre_partition_7_20261102": {
    "url": "https://odre.opendatasoft.com/api/explore/v2.1/catalog/datasets/registre-national-installation-production-stockage-electricite-agrege/records?where=filiere%3D%27Stockage+non+hydraulique%27+and+technologie%3D%27Batterie%27+and+typestockage%3D%27BATTE%27+and+puismaxinstallee%3E%3D1000&order_by=codeeicresourceobject&limit=100&offset=700",
    "sha256": "6f2c68e18f2ac1411687d9d29a4678380ab47118cdae085bd1e8de5a265bd89b",
    "retrieved_at": "2026-11-02T19:51:13.542255+00:00",
    "title": "National battery installation register, offset 700",
    "publisher": "RTE, Enedis, EDF SEI, ELD",
    "source_type": "primary",
    "access_method": "downloaded_json",
    "locator": "API results; exact EIC and source row in review ledger",
    "license": "Etalab Open Licence v2.0; attribution RTE, Enedis, EDF SEI, ELD",
    "document_version": "Reporting 2026-08-31; processed 2026-10-20"
  },
  "eskom_ir2024_wb_20261102": {
    "url": "https://documents1.worldbank.org/curated/en/099042925105519733/pdf/P122329-78739271-286e-4b2a-b89b-02d26966a43a.pdf",
    "sha256": "675003b367f89908f9713786e0acfb85f9b46776b53e66fd7b39e603cf05606a",
    "retrieved_at": "2026-11-02T21:00:39.189825+00:00",
    "publisher": "Eskom; public disclosure hosted by World Bank",
    "title": "Eskom Integrated Report 2024",
    "source_type": "primary",
    "document_version": "2024 integrated report; World Bank disclosure April 2025",
    "access_method": "downloaded_pdf_text",
    "locator": "PDF page 83 / printed page 81, Other projects: BESS, package 2 and package 3 rows",
    "license": "Third-party report copyright retained; selected factual milestones only, no open licence or redistribution of full report claimed. Public World Bank disclosure, not Eskom website collection."
  },
  "bms_iati_iati_20261102": {
    "url": "https://www.adb.org/iati/iati-activities-uz.xml",
    "sha256": "34410bad5c2dd8c4ce96c60900618b1eeee6909887355c6a1fbc03b532954c43",
    "publisher": "Asian Development Bank",
    "title": "ADB Uzbekistan IATI activities",
    "retrieved_at": "2026-11-02T22:51:30+00:00",
    "source_type": "primary",
    "access_method": "downloaded_xml",
    "document_version": "IATI 2.03, generated 2026-10-21",
    "locator": "Activity IDs 57212-001-LN4380, 58338-001-LN4611, 58094-001-LN4661, 54056-003-GRNT4678; title, description, implementing entity, status/date fields",
    "license": "ADB Project Data terms: https://www.adb.org/terms-use ; reuse/adaptation allowed with attribution and downstream acknowledgment requirement. No ADB endorsement. Third-party exclusions apply."
  },
  "adb_india_20261102": {
    "url": "https://www.adb.org/iati/iati-activities-in.xml",
    "title": "ADB India IATI activities",
    "publisher": "Asian Development Bank",
    "locator": "XM-DAC-46004-57330-001-LN4655: description, title and implementing organisation",
    "license": "ADB Project Data terms https://www.adb.org/terms-use allow reuse/adaptation with attribution and downstream acknowledgment; no endorsement.",
    "document_version": "IATI 2.03 generated 2026-10-21",
    "source_type": "primary",
    "access_method": "downloaded_xml",
    "sha256": "8e4a1a772896905f9d04121517f235e22bf0d2a045189279c2d216c9e879be32",
    "retrieved_at": "2026-11-02T23:55:17.912364+00:00"
  },
  "akuo_tonga_opening_20221025": {
    "url": "https://www.akuoenergy.com/en/press/official-completion-ceremony-tongas-1st-ever-large-scale-battery-energy-storage-systems",
    "publisher": "Akuo",
    "title": "Tonga BESS completion ceremony",
    "retrieved_at": "2026-11-03T01:51:14.081343+00:00",
    "access_method": "downloaded_html",
    "sha256": "4b5d4c4c4da78e5ce8f837acda38483d16e346fade9dcd5c8d38fb350dc2c5b9",
    "license": "No open bulk licence established; selected independently reviewed factual project observations only, no text or images redistributed.",
    "locator": "Opening paragraphs and named sites",
    "publication_date": "2022-10-25"
  },
  "akuo_tonga_portfolio_20261103": {
    "url": "https://www.akuoenergy.com/en/akuo-in-the-world/all-our-projects/tonga",
    "publisher": "Akuo",
    "title": "Tonga renewable energy storage project",
    "retrieved_at": "2026-11-03T01:51:14.081343+00:00",
    "access_method": "downloaded_html",
    "sha256": "e02be3e54e8cf38ac2ebe8c06f153c03e6d1eef3971364e8e2d9db663273cea4",
    "license": "No open bulk licence established; selected independently reviewed factual project observations only, no text or images redistributed.",
    "locator": "Two storage facilities and operation paragraphs",
    "publication_date": null
  },
  "tonga_ndc_review_2025": {
    "url": "https://www.unfccc.int/sites/default/files/2025-09/Tongas%20Second%20Nationally%20Determined%20Contribution%20Review%20Report.pdf",
    "publisher": "Government of Tonga",
    "title": "Tonga Second Nationally Determined Contributions Review Report",
    "retrieved_at": "2026-11-03T01:51:14.081343+00:00",
    "access_method": "web_reader_pdf",
    "sha256": null,
    "document_version": "2025",
    "locator": "Printed page 16 / PDF page 24, battery storage paragraph",
    "license": "Government of Tonga copyright 2025. Selected factual observations only; no bulk licence asserted or report redistribution. Original bytes unavailable: ordinary download returned HTML challenge, web reader available."
  },
  "tonga_pmo_eua_202303": {
    "url": "https://pmo.gov.to/kingdom-of-tonga-celebrates-major-milestone-towards-renewable-energy-target-with-commissioning-of-eua-island-350kw-solar-system-and-bess-tonga-renewable-energy-project/",
    "publisher": "Government of Tonga, Prime Minister office",
    "title": "Eua solar and battery commissioning",
    "publication_date": "2023-03-06",
    "retrieved_at": "2026-11-03T02:54:38.716990+00:00",
    "sha256": null,
    "access_method": "search_index_full_article",
    "locator": "Dated opening paragraph, system description and contractor paragraph",
    "license": "No open bulk licence asserted. Individually reviewed factual observations only; article not redistributed. Direct page returns 403; original bytes unavailable, primary indexed article inspected."
  },
  "tonga_pmo_vavau_202303": {
    "url": "https://pmo.gov.to/kingdom-of-tonga-celebrates-major-milestone-towards-renewable-energy-target-with-commissioning-of-vavau-island-300kw-solar-system-and-bess-tonga-renewable-energy-project/",
    "publisher": "Government of Tonga, Prime Minister office",
    "title": "Vavau solar and battery commissioning",
    "publication_date": "2023-03-14",
    "retrieved_at": "2026-11-03T02:54:38.716990+00:00",
    "sha256": null,
    "access_method": "search_index_full_article",
    "locator": "Dated opening paragraph, system description and contractor paragraph",
    "license": "No open bulk licence asserted. Individually reviewed factual observations only; article not redistributed. Direct page returns 403; original bytes unavailable, primary indexed article inspected."
  },
  "tpl_trep03_lot1_status_20261103": {
    "url": "https://tongapower.to/node/218",
    "publisher": "Tonga Power Limited",
    "title": "TREP-03 Lot 1 Eua and Vavau solar and storage systems contract status",
    "retrieved_at": "2026-11-03T02:56:58.620567+00:00",
    "sha256": null,
    "access_method": "primary_page_search_index",
    "locator": "Contract summary: completion certificate October 2024; current status plant in operation",
    "license": "Selected factual status observation only; no bulk licence established or original prose redistributed. Direct TPL timeout; indexed primary table available."
  },
  "dfat_tonga_completion_202402": {
    "url": "https://www.dfat.gov.au/sites/default/files/tonga-outer-islands-renewable-energy-project.pdf",
    "publisher": "Australian Department of Foreign Affairs and Trade",
    "title": "Independent Completion Review: Australia contribution to the multi-donor Tonga Outer Islands Renewable Energy Project",
    "publication_date": "2024-02",
    "retrieved_at": "2026-11-03T03:54:34.176310+00:00",
    "sha256": null,
    "access_method": "web_pdf_reader",
    "locator": "Table One, printed pages 11-12, PDF pages 20-21; surrounding text printed page 13",
    "license": "DFAT website CC BY 4.0 except noted third-party material: https://www.dfat.gov.au/about-us/about-this-website/copyright . Selected factual rows only; no images or original PDF redistributed. Attribution: Department of Foreign Affairs and Trade website – www.dfat.gov.au. Direct PDF returned 503 twice; original checksum unavailable."
  },
  "sprep_tonga_bess_case_table": {
    "url": "https://library.sprep.org/sites/default/files/2022-09/hybrid-battery-energy-storage-systems.pdf",
    "publisher": "SPREP library (ADB technical publication mirror)",
    "title": "Hybrid and Battery Energy Storage Systems: Tonga case-study table",
    "retrieved_at": "2026-11-03T03:54:34.176310+00:00",
    "sha256": null,
    "access_method": "search_index_table",
    "locator": "Table 3.2 continued, printed page 19; financed project infrastructure",
    "license": "Selected conflicting factual observations only; no bulk licence asserted. Direct web reader 403; original bytes unavailable. Not used to infer operating status."
  },
  "ppa_grid_case_studies_202009": {
    "url": "https://www.ppa.org.fj/wp-content/uploads/2020/10/Case-Studies-Guideline-September-2020.pdf",
    "title": "Case Studies from Integrating Renewables into the Grid",
    "publisher": "Pacific Power Association / SEIAPI (GSES with TAU, EPC and TPL)",
    "locator": "Table 3 pp10-11; Samoa section 3.1.6 p23; Tonga Table 15 p37",
    "document_version": "September 2020; copyright 2020",
    "retrieved_at": "2026-11-03T04:51:18.767190+00:00",
    "sha256": "16a5b1150fbeacd793a670052185d7859f57ce4b8caf8d382c88b3ea2ed8851f",
    "access_method": "downloaded_pdf",
    "license": "Copyright retained; selected individually reviewed factual observations only. No open bulk reuse licence established; no source document redistributed. Original source bytes checksummed outside Git."
  },
  "infratec_cook_four_portfolio": {
    "url": "https://infratec.co.nz/projects/southern-group-cook-islands-renewable-microgrids/",
    "publisher": "Infratec",
    "title": "Southern Group Cook Islands Renewable Microgrids",
    "retrieved_at": "2026-11-03T04:51:57.352401+00:00",
    "sha256": null,
    "access_method": "web_reader",
    "locator": "Four island names and combined installed capacity paragraph",
    "license": "Copyright retained; selected facts only; no open bulk licence established; direct download 403, bytes unavailable."
  },
  "ingrid_eight_20240213": {
    "url": "https://www.ingridcapacity.com/press-releases/ingrid-capacity-and-bw-ess-continue-large-scale-expansion-of-energy-storage-in-sweden-e90ec3b6",
    "publisher": "Ingrid Capacity",
    "title": "Ingrid Capacity and BW ESS continue large-scale expansion of energy storage in Sweden",
    "retrieved_at": "2026-11-03T06:01:34.915517+00:00",
    "publication_date": "2024-02-13",
    "locator": "Named eight-site MW list; grid services paragraphs",
    "sha256": "f01424a0597edc4f401bab9168d02090ea0c6e192f8de2caeaa151d7adaf97c0",
    "access_method": "downloaded_original",
    "license": "Copyright retained. Bounded, individually reviewed factual observations; no open bulk licence established. Source documents not redistributed."
  },
  "ingrid_operating_20241010": {
    "url": "https://www.ingridcapacity.com/press-releases/swedens-minister-for-climate-and-the-environment-inaugurates-the-largest-battery-storage-portfolio-in-the-nordics-939df843",
    "publisher": "Ingrid Capacity",
    "title": "Swedish battery portfolio inauguration",
    "retrieved_at": "2026-11-03T06:01:34.915517+00:00",
    "publication_date": "2024-10-10",
    "locator": "14-site portfolio; grid-connected status and joint ownership",
    "sha256": "c30f9ef805578e55a3e4fc2d02f60e2ebf556fdd47345f8fa8f5711b1de3f07c",
    "access_method": "downloaded_original",
    "license": "Copyright retained. Bounded, individually reviewed factual observations; no open bulk licence established. Source documents not redistributed."
  },
  "bw_nordics_portfolio_20261103": {
    "url": "https://bw-ess.com/projects/nordics",
    "publisher": "BW ESS",
    "title": "Nordics operating portfolio",
    "retrieved_at": "2026-11-03T06:01:34.915517+00:00",
    "publication_date": null,
    "locator": "Named 14-site list and In operation label",
    "sha256": "3c4c66a8328b4c28c161d573d2bce78459a3b41a9e57700090e1c4ed382100ea",
    "access_method": "downloaded_original",
    "license": "Copyright retained. Bounded, individually reviewed factual observations; no open bulk licence established. Source documents not redistributed."
  },
  "ingrid_mirova_20260923": {
    "url": "https://www.ingridcapacity.com/news/ingrid-capacity-and-global-investor-mirova-enter-strategic-partnership-for-a-large-scale-bess-portfolio-in-the-nordics",
    "publisher": "Ingrid Capacity",
    "title": "Ingrid Capacity and Mirova Nordic partnership",
    "retrieved_at": "2026-11-03T06:01:34.915517+00:00",
    "publication_date": "2026-09-23",
    "locator": "Pedersöre and Vaggeryd paragraphs; portfolio investment",
    "sha256": "981d4043a0db30bcfa0de1bcafb05ad7cc078e2cd6d50ea7f7a4225c08bae8ac",
    "access_method": "downloaded_original",
    "license": "Copyright retained. Bounded, individually reviewed factual observations; no open bulk licence established. Source documents not redistributed."
  },
  "ingrid_alpiq_20261027": {
    "url": "https://www.ingridcapacity.com/news/ingrid-capacity-and-alpiq-partner-to-accelerate-battery-storage-deployment-in-the-nordics",
    "publisher": "Ingrid Capacity",
    "title": "Ingrid Capacity and Alpiq offtake partnership",
    "retrieved_at": "2026-11-03T06:01:34.915517+00:00",
    "publication_date": "2026-10-27",
    "locator": "Pedersöre executed agreement paragraph",
    "sha256": "7f3bfc32941fa0dba0c3ee4a1bd0a9c36f72fbec0361f433245224c36bfec462",
    "access_method": "downloaded_original",
    "license": "Copyright retained. Bounded, individually reviewed factual observations; no open bulk licence established. Source documents not redistributed."
  },
  "nepower_haapajarvi_20251112": {
    "url": "https://nepower.fi/news/haapajarvi-september-26-2025-nepower-and-alpiq-have-expanded-their-cooperation-to-build-finlands-largest-125-mw-250-mwh-energy-storage-project",
    "publisher": "Nordic Electro Power Oy",
    "title": "NEPower and Alpiq expand Haapajärvi cooperation",
    "retrieved_at": "2026-11-03T06:01:34.915517+00:00",
    "publication_date": "2025-11-12",
    "locator": "EPC scope, 110/33 kV connection, construction and forecast paragraphs",
    "sha256": "3ba4b5271107fe8d30b3e4eaf3893c1a627dc0440b7c8552a260df3931840963",
    "access_method": "downloaded_original",
    "license": "Copyright retained. Bounded, individually reviewed factual observations; no open bulk licence established. Source documents not redistributed."
  },
  "merus_valkeakoski_20251030": {
    "url": "https://www.sttinfo.fi/tiedote/71567312/important-launch-from-merus-power-new-energy-storage-technology-in-the-nordics?lang=en",
    "publisher": "Merus Power Oyj via STT Info",
    "title": "Important launch from Merus Power: grid-forming storage",
    "retrieved_at": "2026-11-03T06:01:34.915517+00:00",
    "publication_date": "2025-10-30",
    "locator": "Opening paragraph and EPC responsibility paragraph",
    "sha256": "e790c83793ebda91995eda36f392b801696d1cb8911c1fbf6eaace50a671c5ac",
    "access_method": "downloaded_original",
    "license": "Copyright retained. Bounded, individually reviewed factual observations; no open bulk licence established. Source documents not redistributed."
  },
  "merus_mertaniemi_20250516": {
    "url": "https://www.sttinfo.fi/tiedote/71171076/one-of-finlands-largest-energy-storage-facilities-commissioned-in-lappeenranta-merus-powers-eur-15-million-delivery-completed?lang=en&publisherId=69821243",
    "publisher": "Merus Power Oyj via STT Info",
    "title": "Lappeenranta storage commissioned; EUR15 million delivery",
    "retrieved_at": "2026-11-03T06:01:34.915517+00:00",
    "publication_date": "2025-05-16",
    "locator": "Opening, capacity and Mertaniemi paragraphs",
    "sha256": "46590896e66155e69dd0ca0daed5f3467e3b9b3bfc22aa67d61b95084014f8fb",
    "access_method": "downloaded_original",
    "license": "Copyright retained. Bounded, individually reviewed factual observations; no open bulk licence established. Source documents not redistributed."
  },
  "destia_ypr2_20260304": {
    "url": "https://destia.fi/en/article/the-largest-battery-storage-in-the-nordics-was-built-with-precise-teamwork/",
    "publisher": "Destia",
    "title": "Yllikkälä battery construction and electrical delivery",
    "retrieved_at": "2026-11-03T06:01:34.915517+00:00",
    "publication_date": "2026-03-04",
    "locator": "Infrastructure and electrical work; final equipment paragraph",
    "sha256": "66d55104f13e2053f145081253838e9658f9bf039ba0eaf47e3354ed0d2bfc0c",
    "access_method": "downloaded_original",
    "license": "Copyright retained. Bounded, individually reviewed factual observations; no open bulk licence established. Source documents not redistributed."
  },
  "epc_fiaga_tender_20261026": {
    "url": "https://www.epc.ws/wp-content/uploads/2026/10/SAMEPC202026TENDERNOTICEFINALCLEANVERSION261026-1.pdf",
    "publisher": "Electric Power Corporation Samoa",
    "title": "SAMEPC12/2026 Fiaga solar and battery tender notice",
    "retrieved_at": "2026-11-03T06:01:34.915517+00:00",
    "publication_date": "2026-10-26",
    "locator": "Public notice pages 1-2; excludes NDA-controlled bid documents",
    "sha256": "0c99dc182409b9ed275e953c7d649f804bc92a3f046814fb74db9e0d18863f5e",
    "access_method": "downloaded_original",
    "license": "Copyright retained. Bounded, individually reviewed factual observations; no open bulk licence established. Source documents not redistributed."
  },
  "ingrid_ai4energy_portfolio_20241111": {
    "url": "https://energiforsk.se/media/33870/9-sara-frimodig-ingrid-capacity.pdf",
    "publisher": "Ingrid Capacity / Energiforsk",
    "title": "AI-driven stokastisk optimering för batterilagringssystem",
    "document_revision": "AI4Energy Stockholm; cover date 2024-11-11",
    "publication_date": "2024-11-11",
    "retrieved_at": "2026-11-03T06:03:37.452157+00:00",
    "sha256": "1eab045424ce7eff62ebad050d8d5def2a5d03c01b142ca8a0426b7f5efeba44",
    "locator": "PDF page 5, printed slide 6: named 2024 portfolio map",
    "access_method": "downloaded_pdf_visually_reviewed",
    "license": "Copyright retained; selected factual site observations only. No open bulk licence established; presentation not redistributed.",
    "date_caveat": "Cover prints 2024-11-11; later slides refer to December 2024 analysis. Revision/publication timing may differ from cover; no exact COD inferred."
  },
  "mulilo_bw2_20241224": {
    "url": "https://www.mulilo.com/news/2024/mulilo-secures-preferred-bidder-status-in-round-2-of-south-africa-s-besipppp-and-bw7/",
    "publisher": "Mulilo",
    "title": "BESIPPPP Round 2 awards",
    "retrieved_at": "2026-11-03T06:57:58.630774+00:00",
    "publication_date": "2024-12-24",
    "locator": "Five named BESS bullets; lead-member responsibilities; excludes Middlepunt solar",
    "sha256": null,
    "access_method": "web_reader",
    "license": "Copyright retained; bounded individually reviewed factual observations only. No open bulk licence established. Source documents, prose and artwork not redistributed.",
    "raw_bytes_availability": "Original bytes unavailable; direct access returned 403 or reader used. No original-byte checksum claimed."
  },
  "mulilo_bw3_20250530": {
    "url": "https://www.mulilo.com/news/2025/mulilo-secures-preferred-bidder-status-in-south-africa-s-besipppp-round-3/",
    "publisher": "Mulilo",
    "title": "BESIPPPP Round 3 awards",
    "retrieved_at": "2026-11-03T06:57:58.630774+00:00",
    "publication_date": "2025-05-30",
    "locator": "Four named BESS bullets; contract paragraph",
    "sha256": null,
    "access_method": "web_reader",
    "license": "Copyright retained; bounded individually reviewed factual observations only. No open bulk licence established. Source documents, prose and artwork not redistributed.",
    "raw_bytes_availability": "Original bytes unavailable; direct access returned 403 or reader used. No original-byte checksum claimed."
  },
  "mulilo_hartebeesfontein_20260611": {
    "url": "https://www.mulilo.com/news/2026/mulilo-makes-further-inroads-with-hartebeesfontein-bess-financial-close/",
    "publisher": "Mulilo",
    "title": "Hartebeesfontein financial close",
    "retrieved_at": "2026-11-03T06:57:58.630774+00:00",
    "publication_date": "2026-06-11",
    "locator": "Capacity, locality, PPA and lenders paragraphs",
    "sha256": null,
    "access_method": "web_reader",
    "license": "Copyright retained; bounded individually reviewed factual observations only. No open bulk licence established. Source documents, prose and artwork not redistributed.",
    "raw_bytes_availability": "Original bytes unavailable; direct access returned 403 or reader used. No original-byte checksum claimed."
  },
  "mulilo_vanilla_application": {
    "url": "https://www.mulilo.com/media/wntkyjd1/registration-application-form-for-electricity-gen-license_vanilla_redacted.pdf",
    "publisher": "Mulilo / Vanilla Energy Facility (RF) (Pty) Ltd",
    "title": "Vanilla BESS redacted NERSA application",
    "retrieved_at": "2026-11-03T06:57:58.630774+00:00",
    "publication_date": null,
    "locator": "Sections C2-C7 pp7-9; D pp12; F2 p14; not an issued licence",
    "sha256": null,
    "access_method": "web_reader",
    "license": "Copyright retained; bounded individually reviewed factual observations only. No open bulk licence established. Source documents, prose and artwork not redistributed.",
    "raw_bytes_availability": "Original bytes unavailable; direct access returned 403 or reader used. No original-byte checksum claimed."
  },
  "mulilo_bloemhoek_application": {
    "url": "https://www.mulilo.com/media/ljibzk0x/annexure-c-licence-application-form-with-redacted-confidential-information_final.pdf",
    "publisher": "Mulilo / Bloemhoek BESS (Pty) Ltd",
    "title": "Bloemhoek BESS redacted NERSA application",
    "retrieved_at": "2026-11-03T06:57:58.630774+00:00",
    "publication_date": null,
    "locator": "Sections A1/A7 pp2-3; C2-C7 pp7-9; D p12; F2 p14",
    "sha256": null,
    "access_method": "web_reader",
    "license": "Copyright retained; bounded individually reviewed factual observations only. No open bulk licence established. Source documents, prose and artwork not redistributed.",
    "raw_bytes_availability": "Original bytes unavailable; direct access returned 403 or reader used. No original-byte checksum claimed."
  },
  "edf_oasis_portfolio_20261103": {
    "url": "https://southafrica.edf-powersolutions.com/construction/oasis-1/",
    "publisher": "EDF power solutions",
    "title": "Oasis 1 construction portfolio",
    "retrieved_at": "2026-11-03T06:50:44.750748+00:00",
    "publication_date": null,
    "locator": "Three named site capacity bullets; developers, debt and PPA paragraphs",
    "sha256": "abdcea01f5ff15af64964a5b3e5022377bde7a73b13dc75f0ea0f240c343448a",
    "access_method": "downloaded_original",
    "license": "Copyright retained; bounded individually reviewed factual observations only. No open bulk licence established. Source documents, prose and artwork not redistributed.",
    "bytes": 158632
  },
  "edf_umoyilanga_portfolio_20261103": {
    "url": "https://southafrica.edf-powersolutions.com/construction/umoyilanga/",
    "publisher": "EDF power solutions",
    "title": "Umoyilanga project portfolio",
    "retrieved_at": "2026-11-03T06:54:43.682620+00:00",
    "publication_date": null,
    "locator": "Individual Avondale/Dassiesridge battery MW; technology-specific contractor list",
    "sha256": "e3013aff004cb51ea4dcdbd37b4915065ef70debd0fc5875741d506126a85694",
    "access_method": "downloaded_original",
    "license": "Copyright retained; bounded individually reviewed factual observations only. No open bulk licence established. Source documents, prose and artwork not redistributed.",
    "bytes": 179886
  },
  "edf_umoyilanga_provisional_20251212": {
    "url": "https://southafrica.edf-powersolutions.com/https-southafrica-edf-powersolutions-com-umoyilanga-hybrid-project-reaches-provisional-cod-with-dassiesridge-plant/",
    "publisher": "EDF power solutions",
    "title": "Umoyilanga provisional COD at Dassiesridge",
    "retrieved_at": "2026-11-03T06:55:31.798310+00:00",
    "publication_date": "2025-12-12",
    "locator": "Opening milestone, 55 MW hybrid NDC, Avondale outstanding work and financial-close paragraphs",
    "sha256": "9407afc882b7ce592437c0b8f1bd4a1233f40198887901b0a115861e7d1ce130",
    "access_method": "downloaded_original",
    "license": "Copyright retained; bounded individually reviewed factual observations only. No open bulk licence established. Source documents, prose and artwork not redistributed.",
    "bytes": 158044
  },
  "exilion_portfolio_20261103": {
    "url": "https://exilion.fi/omistukset/exilion-tuuli-ky/",
    "publisher": "Exilion",
    "title": "Exilion Tuuli Ky portfolio",
    "retrieved_at": "2026-11-03T06:50:37.811868+00:00",
    "publication_date": null,
    "locator": "SÄHKÖVARASTOT; Viinamäki, Mäntyharju, Tjusterby, Palanutkangas sections",
    "sha256": "6810030ba5508677888a833379d667d9af6a88f3e74b0cbe86a90daf0365543f",
    "access_method": "downloaded_original",
    "license": "Copyright retained; bounded individually reviewed factual observations only. No open bulk licence established. Source documents, prose and artwork not redistributed.",
    "bytes": 91900
  },
  "exilion_mantyharju_20251101": {
    "url": "https://exilion.fi/exilion-tilaa-merus-powerilta-sahkovaraston/",
    "publisher": "Exilion",
    "title": "Exilion orders Mäntyharju storage",
    "retrieved_at": "2026-11-03T06:54:36.616249+00:00",
    "publication_date": "2025-11-01",
    "locator": "Opening capacity, Kuortti locality, EUR17m value and developer paragraph",
    "sha256": "d271d7676a11f84e41dbb9ecc88244d4d685e656907eda84efbf2fa59e2b7c36",
    "access_method": "downloaded_original",
    "license": "Copyright retained; bounded individually reviewed factual observations only. No open bulk licence established. Source documents, prose and artwork not redistributed.",
    "bytes": 54741
  },
  "merus_mantyharju_trade_20261027": {
    "url": "https://www.sttinfo.fi/tiedote/72444702/exilion-starts-using-merus-powers-trading-service-at-its-mantyharju-battery-energy-storage?lang=en&publisherId=69821243",
    "publisher": "Merus Power Oyj",
    "title": "Mäntyharju trading and lifecycle service agreement",
    "retrieved_at": "2026-11-03T06:54:50.692884+00:00",
    "publication_date": "2026-10-27",
    "locator": "Opening agreement and markets paragraphs",
    "sha256": "90b4510f6dd82477debfe623f5fd7b0dd11689e8b4cbd1e365435ce98ce11807",
    "access_method": "downloaded_original",
    "license": "Copyright retained; bounded individually reviewed factual observations only. No open bulk licence established. Source documents, prose and artwork not redistributed.",
    "bytes": 142852
  },
  "scatec_kenhardt_close_20220719": {
    "url": "https://www.scatec.com/en/scatec-is-starting-construction-of-solar-and-battery-project-in-south-africa-after-reaching-financial-close/",
    "publisher": "Scatec ASA",
    "title": "Kenhardt construction and financial close",
    "retrieved_at": "2026-11-03T06:57:58.630774+00:00",
    "publication_date": "2022-07-19",
    "locator": "Financial-close, funding and EPC/O&M paragraphs",
    "sha256": null,
    "access_method": "web_reader",
    "license": "Copyright retained; bounded individually reviewed factual observations only. No open bulk licence established. Source documents, prose and artwork not redistributed.",
    "raw_bytes_availability": "Original bytes unavailable; direct access returned 403 or reader used. No original-byte checksum claimed."
  },
  "exilion_sustainability_2025": {
    "url": "https://exilion.fi/wp-content/uploads/2026/04/Exilion-Tuuli-Ky-Vastuullisuusraportti-2025-Final-1.pdf",
    "publisher": "Exilion",
    "title": "Exilion Tuuli Ky sustainability report 2025",
    "publication_date": null,
    "retrieved_at": "2026-11-03T07:06:19.606432+00:00",
    "locator": "Page 3: planning list entries 2 and 5 explicitly say aurinko- ja akkuhanke; construction list Mäntyharju",
    "sha256": "d2b61368f501a78506274afd669f705171b59c91865ba45375c580bea9692cb2",
    "access_method": "downloaded_original",
    "license": "Copyright retained; bounded individually reviewed factual observations only. No open bulk licence established. No source prose, artwork or complete documents redistributed.",
    "terms_review": "Same owner website copyright assessment as portfolio; exact project facts only; no full-table bulk import.",
    "bytes": 4299163,
    "document_revision": "Reporting year 2025; exact publication date not stated"
  },
  "exilion_varevaara_20260701": {
    "url": "https://exilion.fi/en/exilion-signs-over-8-million-euro-battery-energy-storage-deal-with-merus-power/",
    "publisher": "Exilion",
    "title": "Exilion signs over 8 million euro battery energy storage deal with Merus Power",
    "publication_date": "2026-07-01",
    "retrieved_at": "2026-11-03T07:06:37.066557+00:00",
    "locator": "Opening three paragraphs: named site, 20 MW / 41 MWh, turnkey order value and autumn 2027 delivery",
    "sha256": "893a61c077e9f0379122eebb82d51442183a35ed1927642f5ef8227a67b40198",
    "access_method": "downloaded_original",
    "license": "Copyright retained; bounded individually reviewed factual observations only. No open bulk licence established. No source prose, artwork or complete documents redistributed.",
    "terms_review": "Same owner website copyright assessment as portfolio; exact project facts only; no full-table bulk import.",
    "bytes": 55147
  },
  "ingrid_west_20251204": {
    "url": "https://www.ingridcapacity.com/press-releases/ingrid-in-partnership-with-the-seb-nordic-energy-fund-through-locus-energy-is-strengthening-grid-flexibility-in-western-sweden-contributing-to-a-doubling-of-effekthandel-vast-992c11c5",
    "title": "Western Sweden six named battery sites",
    "publisher": "Ingrid Capacity",
    "locator": "Battery storage that relieves the grid; growing presence section",
    "publication_date": "2025-12-04",
    "retrieved_at": "2026-11-03T07:56:12.862381+00:00",
    "sha256": "1905acacc896cf76141ec0196b42d117d5dcd4edf0142f9c97769e99f51efe6a",
    "license": "Copyright retained; individually reviewed factual observations only. No open bulk reuse licence established. Source documents and prose not redistributed.",
    "access_method": "downloaded_original",
    "bytes": 69046
  },
  "ingrid_rattvik_20250925": {
    "url": "https://www.ingridcapacity.com/news/ingrid-capacity-and-the-seb-nordic-energy-fund-through-locus-energy-inaugurate-a-new-battery-storage-facility-in-rattvik-to-strengthen-grid-flexibility",
    "title": "Rättvik inauguration and operation",
    "publisher": "Ingrid Capacity",
    "locator": "Opening capacity; project developer explicitly confirms fully operational facility",
    "publication_date": "2025-09-25",
    "retrieved_at": "2026-11-03T07:56:15.682053+00:00",
    "sha256": "fb73eafaa283c79cc32a218cac14618d6b4671bf08c9d35b99e1d278fb8ae43b",
    "license": "Copyright retained; individually reviewed factual observations only. No open bulk reuse licence established. Source documents and prose not redistributed.",
    "access_method": "downloaded_original",
    "bytes": 80881
  },
  "ingrid_nivala_20250527": {
    "url": "https://www.ingridcapacity.com/press-releases/ingrid-capacity-in-collaboration-with-seb-nordic-energys-portfolio-company-locus-energy-break-ground-on-one-of-finlands-largest-battery-energy-storage-system-e73e89b7",
    "title": "Nivala groundbreaking",
    "publisher": "Ingrid Capacity",
    "locator": "Opening project capacity, location, construction and optimization sections",
    "publication_date": "2025-05-27",
    "retrieved_at": "2026-11-03T07:56:21.034299+00:00",
    "sha256": "7e2b00ad81df022de50a1e95ee8729a29dbc307b6b89919ac62a714836a5fab3",
    "license": "Copyright retained; individually reviewed factual observations only. No open bulk reuse licence established. Source documents and prose not redistributed.",
    "access_method": "downloaded_original",
    "bytes": 68507
  },
  "ingrid_varberg_20251218": {
    "url": "https://www.ingridcapacity.com/press-releases/ingrid-launches-peak-shaving-products-to-strengthen-local-power-grids-f24eba32",
    "title": "Varberg peak shaving service",
    "publisher": "Ingrid Capacity",
    "locator": "Opening 20 MW / 20 MWh and co-owners; Varbergortens Elnät collaboration",
    "publication_date": "2025-12-18",
    "retrieved_at": "2026-11-03T07:56:25.817468+00:00",
    "sha256": "fd530e6bf92e411f08b63a29e9fed638732dac0dbf8ab45946baf6f1a435b08a",
    "license": "Copyright retained; individually reviewed factual observations only. No open bulk reuse licence established. Source documents and prose not redistributed.",
    "access_method": "downloaded_original",
    "bytes": 67845
  },
  "ingrid_south_20260417": {
    "url": "https://www.ingridcapacity.com/press-releases/ingrid-doubles-the-size-of-its-battery-storage-portfolio-with-groundbreaking-projects-in-southern-sweden-surpassing-1-gwh-in-capacity-384cb2c0",
    "title": "Vaggeryd and Horsaryd development",
    "publisher": "Ingrid Capacity",
    "locator": "Individual ratings; legally effective permits and planned dates paragraph",
    "publication_date": "2026-04-17",
    "retrieved_at": "2026-11-03T07:56:28.210305+00:00",
    "sha256": "befa26ba7c0892a6f4bdbfa5715b22d85d65e97c7bf5998089842794fd4da00f",
    "license": "Copyright retained; individually reviewed factual observations only. No open bulk reuse licence established. Source documents and prose not redistributed.",
    "access_method": "downloaded_original",
    "bytes": 66367
  },
  "nz_pipeline_20261103": {
    "url": "https://www.emi.ea.govt.nz/Wholesale/Datasets/Generation/GenerationFleet/Proposed/20240912%20Generation%20investment%20pipeline.csv",
    "sha256": "8f2149286103160d6e5b1751df6e3b261d942d9ae0f9e17365443f34f6afecfa",
    "bytes": 16865,
    "retrieved_at": "2026-11-03T08:57:41.626917+00:00",
    "title": "Generation investment pipeline, September 2024",
    "publisher": "Electricity Authority New Zealand",
    "locator": "CSV rows 18, 48 and 116; explicit chemical battery classification; historical planning observations only",
    "publication_date": "2024-09-12",
    "access_method": "downloaded_original",
    "license": "CC BY 4.0; Electricity Authority on behalf of the Crown; normalized factual fields with attribution; no endorsement",
    "license_url": "https://www.ea.govt.nz/copyright-disclaimer-transparency/"
  },
  "nz_services_20261103": {
    "url": "https://www.ea.govt.nz/news/eye-on-electricity/eye-on-electricity-battery-performance-in-new-zealand/",
    "sha256": "95e18047eb1bcffa736cb953d654bc878b81dbc5c145ee66053da0d7d9c8248f",
    "bytes": 203248,
    "retrieved_at": "2026-11-03T08:57:48.011953+00:00",
    "title": "Battery performance in New Zealand",
    "publisher": "Electricity Authority New Zealand",
    "locator": "19 May 2026 header; energy versus instantaneous reserve dispatch through 28 April 2026",
    "publication_date": "2026-05-19",
    "access_method": "downloaded_original",
    "license": "CC BY 4.0; Electricity Authority on behalf of the Crown; normalized factual fields with attribution; no endorsement",
    "license_url": "https://www.ea.govt.nz/copyright-disclaimer-transparency/"
  },
  "nzce_masterton_20261103": {
    "url": "https://www.nzcleanenergy.nz/projects/masterton-solar-energy-storage",
    "sha256": "a2819f913937d2dd1296362ea07e32b6db354f612312ee087212beac38693fb6",
    "bytes": 716209,
    "retrieved_at": "2026-11-03T09:01:18.608805+00:00",
    "title": "Masterton Solar & Energy Storage Project",
    "publisher": "NZ Clean Energy",
    "locator": "Project information, location/grid and current status sections",
    "publication_date": null,
    "access_method": "downloaded_original",
    "license": "Copyright publisher; bounded individually reviewed factual specifications only; no open bulk-reuse licence asserted; full documents and source prose not redistributed."
  },
  "nzce_darfield_20261103": {
    "url": "https://www.nzcleanenergy.nz/projects/darfield-solar-energy-storage",
    "sha256": "eada89554fe943f02445a14a0ab6637392f0e2d2e98eb3496b72785bab778832",
    "bytes": 303381,
    "retrieved_at": "2026-11-03T09:01:21.455409+00:00",
    "title": "Darfield Solar & Energy Storage Project",
    "publisher": "NZ Clean Energy",
    "locator": "Project information, location/grid and current status sections",
    "publication_date": null,
    "access_method": "downloaded_original",
    "license": "Copyright publisher; bounded individually reviewed factual specifications only; no open bulk-reuse licence asserted; full documents and source prose not redistributed."
  },
  "nzce_dannevirke_20261103": {
    "url": "https://www.nzcleanenergy.nz/projects/dannevirke-solar-energy-storage",
    "sha256": "cf9043e16f59c0a2aa5b769919a92fbc255a8092283a14f3b020e695eaaab12d",
    "bytes": 264183,
    "retrieved_at": "2026-11-03T09:01:25.011912+00:00",
    "title": "Dannevirke Solar & Energy Storage Project",
    "publisher": "NZ Clean Energy",
    "locator": "Project information, location/grid and current status sections",
    "publication_date": null,
    "access_method": "downloaded_original",
    "license": "Copyright publisher; bounded individually reviewed factual specifications only; no open bulk-reuse licence asserted; full documents and source prose not redistributed."
  },
  "contact_1_20261103": {
    "url": "https://contact.co.nz/about-us/our-story/our-generation-and-power-sites/battery/glenbrook-ohurua-battery",
    "sha256": "5ef8a43ba1135905d71ba818b397154b67be544c88bce050c7353e8c171098cb",
    "bytes": 60744,
    "retrieved_at": "2026-11-03T09:01:28.427172+00:00",
    "title": "Glenbrook Ohurua Battery 1",
    "publisher": "Contact Energy",
    "locator": "Commissioned, operating narrative and partners sections",
    "publication_date": null,
    "access_method": "downloaded_original",
    "license": "Copyright publisher; bounded individually reviewed factual specifications only; no open bulk-reuse licence asserted; full documents and source prose not redistributed."
  },
  "contact_2_20261103": {
    "url": "https://contact.co.nz/about-us/sustainability/our-projects/battery/glenbrook-ohurua-battery-2",
    "sha256": "43a413eaa412e8c4cd0cbb4d512ce01efcfdfbb1dbf695fbb2329edae89cd6cd",
    "bytes": 61187,
    "retrieved_at": "2026-11-03T09:01:33.423275+00:00",
    "title": "Glenbrook Ohurua Battery 2",
    "publisher": "Contact Energy",
    "locator": "Status, capacity, technology and grid connection table; separate adjacent Battery 1",
    "publication_date": null,
    "access_method": "downloaded_original",
    "license": "Copyright publisher; bounded individually reviewed factual specifications only; no open bulk-reuse licence asserted; full documents and source prose not redistributed."
  },
  "contact_news_20261103": {
    "url": "https://contact.co.nz/investor-centre/news/2026/glenbrook-ohurua-battery",
    "sha256": "33fc1d9b68e0956cec92989bad847dcc859ed3fb7750832dcdae24c7e3ae2d23",
    "bytes": 55025,
    "retrieved_at": "2026-11-03T09:01:37.239388+00:00",
    "title": "Glenbrook Ohurua Battery opening",
    "publisher": "Contact Energy",
    "locator": "21 May 2026 announcement: separate Battery 1 and Battery 2 investment and equipment",
    "publication_date": "2026-05-21",
    "access_method": "downloaded_original",
    "license": "Copyright publisher; bounded individually reviewed factual specifications only; no open bulk-reuse licence asserted; full documents and source prose not redistributed."
  },
  "harmony_bunnythorpe_hybrid_solar_farm_20261103": {
    "url": "https://harmonyenergy.co.nz/project/bunnythorpe-hybrid-solar-farm/",
    "sha256": "f2712269d9947c18645a07c26409c9ad12fe87fcdb58046b7db2f14a2f1b5d6d",
    "retrieved_at": "2026-11-03T09:49:37.622997+00:00",
    "title": "Bunnythorpe Hybrid Solar Farm",
    "publisher": "Harmony Energy New Zealand",
    "locator": "Project Information written narrative; grid heading only for conflict review. Animated zero counters excluded.",
    "publication_date": null,
    "document_revision": null,
    "access_method": "downloaded_original",
    "license": "Copyright retained; bounded individually reviewed factual observations. No open bulk reuse licence asserted; no full documents redistributed."
  },
  "harmony_bunnythorpe_bess_20261103": {
    "url": "https://harmonyenergy.co.nz/project/bunnythorpe-bess/",
    "sha256": "e43d9df7222f9c5ae3407848ae8f85ab2cc0f5ede75ba9826762494a4389b4be",
    "retrieved_at": "2026-11-03T09:49:37.618910+00:00",
    "title": "Bunnythorpe Bess",
    "publisher": "Harmony Energy New Zealand",
    "locator": "Project Information written narrative; grid heading only for conflict review. Animated zero counters excluded.",
    "publication_date": null,
    "document_revision": null,
    "access_method": "downloaded_original",
    "license": "Copyright retained; bounded individually reviewed factual observations. No open bulk reuse licence asserted; no full documents redistributed."
  },
  "harmony_hinuera_hybrid_solar_farm_20261103": {
    "url": "https://harmonyenergy.co.nz/project/hinuera-hybrid-solar-farm/",
    "sha256": "0c2e38c9030118c12e8d44aab3a7c7472c0696212d2fcaddb2088b8967ca49a8",
    "retrieved_at": "2026-11-03T09:49:37.600293+00:00",
    "title": "Hinuera Hybrid Solar Farm",
    "publisher": "Harmony Energy New Zealand",
    "locator": "Project Information written narrative; grid heading only for conflict review. Animated zero counters excluded.",
    "publication_date": null,
    "document_revision": null,
    "access_method": "downloaded_original",
    "license": "Copyright retained; bounded individually reviewed factual observations. No open bulk reuse licence asserted; no full documents redistributed."
  },
  "harmony_tangiwai_hybrid_solar_farm_20261103": {
    "url": "https://harmonyenergy.co.nz/project/tangiwai-hybrid-solar-farm/",
    "sha256": "b9cc319e42634e872c9d656143930cb211fd416313a7a4f3cc9757b41ac5243b",
    "retrieved_at": "2026-11-03T09:49:41.995237+00:00",
    "title": "Tangiwai Hybrid Solar Farm",
    "publisher": "Harmony Energy New Zealand",
    "locator": "Project Information written narrative; grid heading only for conflict review. Animated zero counters excluded.",
    "publication_date": null,
    "document_revision": null,
    "access_method": "downloaded_original",
    "license": "Copyright retained; bounded individually reviewed factual observations. No open bulk reuse licence asserted; no full documents redistributed."
  },
  "harmony_huirangi_hybrid_solar_farm_20261103": {
    "url": "https://harmonyenergy.co.nz/project/huirangi-hybrid-solar-farm/",
    "sha256": "09207b69bf64cde59e83d3e09a95e729fbc68010fd0ccca765922742344f0d73",
    "retrieved_at": "2026-11-03T09:49:42.022761+00:00",
    "title": "Huirangi Hybrid Solar Farm",
    "publisher": "Harmony Energy New Zealand",
    "locator": "Project Information written narrative; grid heading only for conflict review. Animated zero counters excluded.",
    "publication_date": null,
    "document_revision": null,
    "access_method": "downloaded_original",
    "license": "Copyright retained; bounded individually reviewed factual observations. No open bulk reuse licence asserted; no full documents redistributed."
  },
  "harmony_waihou_bess_20261103": {
    "url": "https://harmonyenergy.co.nz/project/waihou-bess/",
    "sha256": "8346f816cb404c5e406fc3a45286c5d864af6645cf6d89c01a9d28f367ff60cd",
    "retrieved_at": "2026-11-03T09:49:42.018639+00:00",
    "title": "Waihou Bess",
    "publisher": "Harmony Energy New Zealand",
    "locator": "Project Information written narrative; grid heading only for conflict review. Animated zero counters excluded.",
    "publication_date": null,
    "document_revision": null,
    "access_method": "downloaded_original",
    "license": "Copyright retained; bounded individually reviewed factual observations. No open bulk reuse licence asserted; no full documents redistributed."
  },
  "harmony_opunake_hybrid_solar_farm_20261103": {
    "url": "https://harmonyenergy.co.nz/project/opunake-hybrid-solar-farm/",
    "sha256": "923f3973550488bcc77cef3d75ec6a5eaf473aa075b9fdb55767ee476b86bd8e",
    "retrieved_at": "2026-11-03T09:49:46.686997+00:00",
    "title": "Opunake Hybrid Solar Farm",
    "publisher": "Harmony Energy New Zealand",
    "locator": "Project Information written narrative; grid heading only for conflict review. Animated zero counters excluded.",
    "publication_date": null,
    "document_revision": null,
    "access_method": "downloaded_original",
    "license": "Copyright retained; bounded individually reviewed factual observations. No open bulk reuse licence asserted; no full documents redistributed."
  },
  "harmony_portfolio_20261103": {
    "url": "https://harmonyenergy.co.nz/projects/",
    "sha256": "e999dcbc4edf9549f2d8b1a7e808ddd0bb29e0b84fd7497405af4f9be7ba44c4",
    "retrieved_at": "2026-11-03T09:52:57.061092+00:00",
    "publisher": "Harmony Energy New Zealand",
    "title": "New Zealand project portfolio",
    "locator": "Named project cards: Hinuera88MWp versus narrative89MW; seven explicit BESS proposals among ten project cards",
    "publication_date": null,
    "access_method": "downloaded_original",
    "license": "Copyright retained; bounded factual review; no open bulk reuse licence or source redistribution"
  },
  "flower_q2_20261103": {
    "url": "https://www.flower.se/wp-content/uploads/2026/08/Flower-Second-Quarter-2026.pdf",
    "sha256": "7eca2078092f1d7794e917cb49ed0d86566d84d923151a9757a067a41de0cefe",
    "retrieved_at": "2026-11-03T10:50:04.752074+00:00",
    "title": "Second quarter interim report 2026",
    "publisher": "Flower",
    "locator": "PDF page 6 (printed 04), named MW/MWh table; PDF page 5 group structure; row locator retained per record",
    "publication_date": null,
    "document_revision": "Q2 2026, reporting period ended 30 June 2026",
    "access_method": "downloaded_original",
    "license": "Copyright retained. Bounded review of named factual observations; no open bulk reuse licence asserted. Full source bytes retained outside Git and not redistributed."
  },
  "flower_hamburg_20261103": {
    "url": "https://www.flower.se/news/flower-begins-construction-of-hamburgs-largest-battery-storage-system/",
    "sha256": "e91be5ca2fb189f2551177097e49a5c9b256fecaf4d60035a816bc595c90a7b5",
    "retrieved_at": "2026-11-03T10:50:03.890829+00:00",
    "title": "Flower begins construction of Hamburg’s largest battery storage system",
    "publisher": "Flower",
    "locator": "Opening, four-hour system and ENGIE agreement paragraphs",
    "publication_date": "2026-09-10",
    "document_revision": null,
    "access_method": "downloaded_original",
    "license": "Copyright retained. Bounded review of named factual observations; no open bulk reuse licence asserted. Full source bytes retained outside Git and not redistributed."
  },
  "flower_germany7_20261103": {
    "url": "https://www.flower.se/news/112-mw-across-germany-flower-acquires-seven-ready-to-build-bess-projects/",
    "sha256": "dc4c7badaa9ba6f0123c52a564db9873c5b30df000e1f018d35decbb6f8fe7c7",
    "retrieved_at": "2026-11-03T10:50:03.844083+00:00",
    "title": "112 MW across Germany: Flower acquires seven ready-to-build BESS projects",
    "publisher": "Flower",
    "locator": "EPC/O&M, permits/grid, 2027 target and named Döllnitz paragraph",
    "publication_date": "2026-07-09",
    "document_revision": null,
    "access_method": "downloaded_original",
    "license": "Copyright retained. Bounded review of named factual observations; no open bulk reuse licence asserted. Full source bytes retained outside Git and not redistributed."
  },
  "flower_close2_20261103": {
    "url": "https://www.flower.se/press/flower-german-tolling-ab-publ-closes-acquisition-of-two-bess-projects-in-germany-to-complete-112-mw-portfolio-acquisition/",
    "sha256": "61867413ee19b4819f26fbc79f329ec92badcfe4c952fb2c06b5bfc8271e2bbf",
    "retrieved_at": "2026-11-03T10:50:08.349568+00:00",
    "title": "Flower German Tolling closes two acquisitions to complete 112 MW portfolio",
    "publisher": "Flower",
    "locator": "Borken and Berga named ratings, regions and closed ownership transaction",
    "publication_date": "2026-10-26",
    "document_revision": null,
    "access_method": "downloaded_original",
    "license": "Copyright retained. Bounded review of named factual observations; no open bulk reuse licence asserted. Full source bytes retained outside Git and not redistributed."
  },
  "flower_sweden3_20261103": {
    "url": "https://www.flower.se/news/flower-activates-multiple-new-battery-projects-a-new-era-for-swedish-renewables/",
    "sha256": "a6ed0f9860b16ce5a5eddbd1baae466730c57749a6d04fc09d12d8af8872ef36",
    "retrieved_at": "2026-11-03T10:50:08.390732+00:00",
    "title": "Flower activates multiple new battery projects",
    "publisher": "Flower",
    "locator": "Named Bredhälla, Kungälv and Hanhals status and ratings paragraphs",
    "publication_date": "2024-08-21",
    "document_revision": null,
    "access_method": "downloaded_original",
    "license": "Copyright retained. Bounded review of named factual observations; no open bulk reuse licence asserted. Full source bytes retained outside Git and not redistributed."
  },
  "flower_gersheim_20261103": {
    "url": "https://www.flower.se/de/press/flower-advances-internally-developed-bess-project-in-saarland-germany/",
    "sha256": "9ede64feeb731bd9cbe6271ce93d41a74413efc5642b3207cc402436c517bb14",
    "retrieved_at": "2026-11-03T10:55:37.858379+00:00",
    "title": "Flower advances internally developed BESS project in Saarland",
    "publisher": "Flower",
    "locator": "Gersheim 10 MW/20 MWh, ready-to-build and expected 2027 paragraphs",
    "publication_date": "2026-04-30",
    "document_revision": null,
    "access_method": "downloaded_original",
    "license": "Copyright retained. Bounded review of named factual observations; no open bulk reuse licence asserted. Full source bytes retained outside Git and not redistributed."
  },
  "flower_hamburg_owner_20261103": {
    "url": "https://www.flower.se/press/flower-german-tolling-ab-publ-acquires-100-mw-battery-storage-project-in-germany/",
    "sha256": "4de7a0ddeca8228aad39e362dc0f1ee929dabce4792ae4ea59366eea1e7e8bed",
    "retrieved_at": "2026-11-03T10:52:19.808708+00:00",
    "title": "Flower German Tolling acquires 100 MW battery storage project",
    "publisher": "Flower",
    "locator": "Acquisition chain, project company, consideration and bond funding paragraphs",
    "publication_date": "2026-10-13",
    "document_revision": null,
    "access_method": "downloaded_original",
    "license": "Copyright retained. Bounded review of named factual observations; no open bulk reuse licence asserted. Full source bytes retained outside Git and not redistributed."
  },
  "smgp_annual2025_20261103": {
    "url": "https://smcglobalpower.com.ph/storage/files/reports/17-A/San-Miguel-Global-Power-Holdings-Corp-SEC-Form-17-A-2025-Annual-Report-15-April-2026-FINAL.pdf",
    "sha256": "a69bd3e888ba93ba7a07f4f3f3733160dc6433cf45c07843f7a395c802a85063",
    "retrieved_at": "2026-11-03T12:00:56.326726+00:00",
    "publisher": "San Miguel Global Power Holdings Corp.",
    "title": "SEC Form17-A Annual Report2025",
    "publication_date": "2026-04-15",
    "locator": "PDF pages5–6 ownership;16–18 Masinloc;28 project progress;31–32 BESS licences",
    "access_method": "downloaded_original_pdf",
    "license": "Copyright San Miguel Global Power; all rights reserved. Public statutory annual filing; selected bounded factual observations manually reviewed with attribution. No open bulk licence asserted; no full report, images or narrative redistributed."
  },
  "ceb_smartgrid2022_20261103": {
    "url": "https://environment.govmu.org/Documents/Circular%20Economy/Session%205/3%20-%20Smart%20Grid%20and%20Renewable%20Energy%20by%20Mr%20Ally%20Rujbally.pdf",
    "sha256": "5d90c65b9484bf8ea1c1010397c79dd4332cae6ab24f2648f5ffcbb73a76d1f9",
    "retrieved_at": "2026-11-03T12:00:36.597240+00:00",
    "publisher": "Central Electricity Board, Republic of Mauritius",
    "title": "Smart Grid and Renewable Energy — National Conference on Circular Economy",
    "publication_date": "2022-05-26",
    "locator": "PDF page1 printed date and page18 named BESS capacity table",
    "access_method": "downloaded_original_pdf",
    "license": "Government-hosted CEB presentation. Mauritius State copyright notice allows accurate reproduction with source URL/copyright acknowledgement, excluding identified third-party copyright. Selected factual table only; CEB/Government of Mauritius copyright acknowledged; no slides or third-party figures redistributed. https://www.govmu.org/EN/Pages/Copyright.aspx"
  },
  "mauritius_mepu2024_20261103": {
    "url": "https://publicutilities.govmu.org/Documents/Annual%20Report2023-2024.pdf",
    "sha256": "7b6c3f66ae11bc2fe7066c828ed781717bdc590e3f0442d272c9561b27309829",
    "retrieved_at": "2026-11-03T12:01:56.426560+00:00",
    "publisher": "Ministry of Energy and Public Utilities, Republic of Mauritius",
    "title": "Annual Report2023–2024",
    "publication_date": null,
    "locator": "PDF35 / printed34:20MW BESS at Amaury; reporting year ends30June2024",
    "access_method": "downloaded_original_pdf",
    "license": "Government of Mauritius State copyright; accurate attributed reproduction allowed under https://www.govmu.org/EN/Pages/Copyright.aspx; source and State copyright acknowledged. No full report redistributed."
  },
  "doe_evoss_202412_luzon": {
    "url": "https://evoss.ph/Home/Download/246659",
    "publisher": "Philippines Department of Energy, EPIMB",
    "title": "List of Existing Power Plants (Grid-connected), Luzon Grid, 31 December 2024",
    "publication_date": "2024-12-31",
    "retrieved_at": "2026-11-03T12:59:27.193049+00:00",
    "access_method": "web PDF text retrieval; direct original-byte download returned403",
    "sha256": null,
    "locator": "PDF page 3, Energy Storage System section and capacity definitions",
    "license": "Government-issued inventory, bounded manual factual review with DOE attribution; EVOSS website copyright does not establish an open bulk-reuse licence. No PDF redistributed.",
    "checksum_note": "Original bytes unavailable via direct download; no checksum invented. Reader representation is not claimed as original bytes."
  },
  "doe_evoss_202412_visayas": {
    "url": "https://evoss.ph/Home/Download/246660",
    "publisher": "Philippines Department of Energy, EPIMB",
    "title": "List of Existing Power Plants (Grid-connected), Visayas Grid, 31 December 2024",
    "publication_date": "2024-12-31",
    "retrieved_at": "2026-11-03T12:59:27.193049+00:00",
    "access_method": "web PDF text retrieval; direct original-byte download returned403",
    "sha256": null,
    "locator": "PDF page 2, Energy Storage System section and capacity definitions",
    "license": "Government-issued inventory, bounded manual factual review with DOE attribution; EVOSS website copyright does not establish an open bulk-reuse licence. No PDF redistributed.",
    "checksum_note": "Original bytes unavailable via direct download; no checksum invented. Reader representation is not claimed as original bytes."
  },
  "doe_evoss_202412_mindanao": {
    "url": "https://evoss.ph/Home/Download/246661",
    "publisher": "Philippines Department of Energy, EPIMB",
    "title": "List of Existing Power Plants (Grid-connected), Mindanao Grid, 31 December 2024",
    "publication_date": "2024-12-31",
    "retrieved_at": "2026-11-03T12:59:27.193049+00:00",
    "access_method": "web PDF text retrieval; direct original-byte download returned403",
    "sha256": null,
    "locator": "PDF page 2, Energy Storage System section and capacity definitions",
    "license": "Government-issued inventory, bounded manual factual review with DOE attribution; EVOSS website copyright does not establish an open bulk-reuse licence. No PDF redistributed.",
    "checksum_note": "Original bytes unavailable via direct download; no checksum invented. Reader representation is not claimed as original bytes."
  },
  "nfosigw_ranking_20251212": {
    "url": "https://www.gov.pl/attachment/20702c51-561a-418d-898e-e84139263bfb",
    "sha256": "047233888c2c9b5815265c09ab767c4779a18f86900da1226882cb12fda1d88a",
    "retrieved_at": "2026-11-03T13:54:40.556647+00:00",
    "publisher": "Narodowy Fundusz Ochrony Środowiska i Gospodarki Wodnej (NFOŚiGW)",
    "title": "Lista rankingowa wniosków – electricity storage; updated12December2025",
    "publication_date": "2025-12-12",
    "document_revision": "Landing-page12December2025; filename aktualizacja11122025; PDF metadata10.12.2025",
    "locator": "24-page ten-column ranking; explicit per-record page/rank/application ID",
    "access_method": "original PDF download; pdfplumber table extraction followed by manual identity/technology review",
    "license": "Gov.pl text CC BY-SA4.0; official-material permission exception also stated. NFOŚiGW attribution retained. Adapted factual subset and normalized fields distributed under CC BY-SA4.0; no images or PDF included.",
    "license_url": "https://creativecommons.org/licenses/by-sa/4.0/",
    "terms_url": "https://www.gov.pl/web/gov/prawa-autorskie"
  },
  "nfosigw_call_20251212": {
    "url": "https://www.gov.pl/web/funduszmodernizacyjny/magazyny-energii-elektrycznej-i-zwiazana-z-nimi-infrastruktura-dla-poprawy-stabilnosci-polskiej-sieci-elektroenergetycznej2",
    "sha256": "9956afbd1fa9aa5605d6a57e8a92991a769516024ca581e76f9c3b625b39d023",
    "retrieved_at": "2026-11-03T13:58:18.075680+00:00",
    "publisher": "NFOŚiGW",
    "title": "Storage funding call and ranking interpretation",
    "publication_date": "2025-12-12",
    "locator": "12December2025 update;8December2025 ranking conditions; eligibility; footer",
    "license": "Gov.pl textual content CC BY-SA4.0; source attribution and adaptation notice retained",
    "access_method": "original HTML download and manual factual review"
  },
  "senelec_diass_2026": {
    "url": "https://www.senelec.sn/actualites/projet-de-stockage-par-batterie-de-diass/",
    "sha256": "06303b3d3003c46a0970695bf81a1663d683170f6dff595463d37ee7fa24fb1a",
    "retrieved_at": "2026-11-03T13:58:02.158006+00:00",
    "publisher": "SENELEC",
    "title": "Diass BESS project announcement",
    "publication_date": "2026-04-20",
    "locator": "Article body:project rating, lifecycle, location, financing and co-location paragraphs",
    "license": "Copyright retained. Bounded manual factual observations from project participant; no open bulk licence asserted and no article/images redistributed.",
    "access_method": "original HTML download and manual factual review"
  },
  "senelec_walo_2026": {
    "url": "https://www.senelec.sn/actualites/Storage/",
    "sha256": "e6cd2b05cb6cbc2162ce4082af53b37e35d995f7d2f58b7c0ac0b4a5356f7c7a",
    "retrieved_at": "2026-11-03T13:58:05.515748+00:00",
    "publisher": "SENELEC",
    "title": "Walo Storage BESS project announcement",
    "publication_date": "2026-03-19",
    "locator": "Article body:project rating, lifecycle, location, financing and co-location paragraphs",
    "license": "Copyright retained. Bounded manual factual observations from project participant; no open bulk licence asserted and no article/images redistributed.",
    "access_method": "original HTML download and manual factual review"
  },
  "polarium_rwe_vpp_20260422": {
    "url": "https://polarium.com/newsroom-articles/rwe-and-polarium-sign-multi-asset-tolling-to-unlock-virtual-battery-from-thousands-of-sites-to-support-renewable-integration/",
    "sha256": "68d719475a0de785aa4b918c275969ed3a87018b56d36b3ce350c972683e4c08",
    "retrieved_at": "2026-11-03T13:58:09.231122+00:00",
    "publisher": "Polarium Energy Solutions AB",
    "title": "RWE and Polarium multi-asset tolling agreement",
    "publication_date": "2026-04-22",
    "locator": "Release body paragraphs on portfolio, capacity and tolling scope",
    "license": "Copyright retained. Bounded manual factual observations from project participant; no open bulk licence asserted and no article/images redistributed.",
    "access_method": "original HTML download and manual factual review"
  },
  "energa_hybrid_portfolio_20260514": {
    "url": "https://media.energa.pl/pr/869811/energa-rozpoczyna-projekty-hybrydowe-ruszyl-przetarg-na-wylonienie-wykonawcy",
    "sha256": "8cc50d4bded6d932415a0886b109692ce9486bffd8216ee1f2c7fcbe696f1ad9",
    "retrieved_at": "2026-11-03T14:03:57.787067+00:00",
    "publisher": "Energa SA",
    "title": "Energa hybrid projects and contractor tender",
    "publication_date": "2026-05-14",
    "locator": "Sompolno paragraph and eight new PV+battery locations",
    "license": "Copyright Energa; bounded manual factual portfolio observations, no open bulk licence asserted; no article/images redistributed.",
    "access_method": "original HTML download; exact table and portfolio paragraph manual reconciliation"
  },
  "nfosigw_signed_contracts_20261103": {
    "url": "https://www.gov.pl/web/funduszmodernizacyjny/zawarte-umowy",
    "sha256": "b098fd0bf8663fd02aafd054bc707cc22c9cdca7828a61c366d9d593fe275a2e",
    "retrieved_at": "2026-11-03T14:03:53.557774+00:00",
    "publisher": "NFOŚiGW",
    "title": "Zawarte umowy – signed funding contracts",
    "publication_date": null,
    "locator": "Electricity-storage table, beneficiary/project title/contract number/form/PLN amount; exact contract IDs in records",
    "license": "Gov.pl text CC BY-SA4.0; NFOŚiGW attribution, original identifiers and modification notice retained",
    "access_method": "original HTML download; exact table and portfolio paragraph manual reconciliation"
  },
  "tauron_h1_2026_battery": {
    "url": "https://www.tauron.pl/-/media/offer-documents/tauron/raporty-okresowe/2026/i-polrocze/sprawozdanie-zarzadu-z-dziaalnosci-gk-tpe-za-i-polrocze-2026.ashx",
    "sha256": "367009cd11e1ce646370eaf22298c75f9589e296476b19d9b46eb889a5604f78",
    "retrieved_at": "2026-11-03T14:50:53.568193+00:00",
    "title": "TAURON management report H1 2026",
    "publisher": "TAURON Polska Energia S.A.",
    "publication_date": null,
    "locator": "PDF pages 20–22, Tables 8 and 9; named investment rows and battery technology subrows",
    "license": "Copyright retained; bounded manually reviewed factual observations; not an open bulk licence. Original PDF/images not redistributed.",
    "access_method": "Original PDF download; extracted text checked against rendered technical tables"
  },
  "tauron_earlier_20261103": {
    "url": "https://media.tauron.pl/pr/862053/nowe-magazyny-energii-taurona-wzmocnia-stabilnosc-systemu",
    "sha256": "24b41adc47ea84a18736aa3c6a1ef42de65487b27dbc8e1eca830658fa717ca7",
    "retrieved_at": "2026-11-03T14:54:04.464872+00:00",
    "publisher": "TAURON Polska Energia S.A.",
    "title": "TAURON four battery projects",
    "publication_date": "2025-12-09",
    "locator": "Article body: named project capacity, location and contract paragraphs",
    "access_method": "Original HTML download; bounded manual factual review",
    "license": "Copyright retained; factual project observations only, not open bulk licence; no article or images redistributed"
  },
  "tauron_jawor_20261103": {
    "url": "https://media.tauron.pl/pr/878700/tauron-stawia-na-magazynowanie-energii-grupa-uruchomi-bme-jawor-na-poczatku-2027",
    "sha256": "37b8dd4c8a037c39cdfe1bbc3655917b8551a709d159eeff45ddd8d36d3e71de",
    "retrieved_at": "2026-11-03T14:53:58.398830+00:00",
    "publisher": "TAURON Polska Energia S.A.",
    "title": "TAURON acquires ready-to-build Jawor battery project",
    "publication_date": "2026-10-20",
    "locator": "Article body: named project capacity, location and contract paragraphs",
    "access_method": "Original HTML download; bounded manual factual review",
    "license": "Copyright retained; factual project observations only, not open bulk licence; no article or images redistributed"
  },
  "tauron_funding_energy_20251208": {
    "url": "https://media.tauron.pl/pr/861999/tauron-z-dofinansowaniem-na-bateryjne-magazyny-energii-2025-12-08",
    "sha256": "a721533430173e5e31197cad211ffed07bc32bedef552e4c9378f07481214b78",
    "retrieved_at": "2026-11-03T15:56:29.727019+00:00",
    "publisher": "TAURON Polska Energia S.A.",
    "title": "TAURON z dofinansowaniem na bateryjne magazyny energii",
    "publication_date": "2025-12-08",
    "locator": "Named-site paragraph beginning Omawiane projekty; individual MW/MWh and province pairs",
    "license": "Copyright retained; bounded manually reviewed factual observations; no open bulk-reuse licence asserted; original documents not redistributed.",
    "access_method": "Original owner HTML/PDF/ZIP downloaded; technical tables and tender result visually reviewed"
  },
  "energa_tender_egd0001_20260513": {
    "url": "https://cdn-netpr.pl/file/attachment/2984343/93/dokumentacja_postepowania_egd_0001_2026_ogloszenie.zip",
    "sha256": "42647c4c068a88927f5e2d827ad68e2765bdc7b9259d0e8af966c49195023df9",
    "retrieved_at": "2026-11-03T16:01:16.148973+00:00",
    "publisher": "Energa Green Development Sp. z o.o.",
    "title": "EGD/0001/2026 original procurement specification and common technical requirements",
    "publication_date": "2026-05-13",
    "locator": "ZIP SWZ_ostateczna+ogł/SWZ_PRZETARG NR EGD_0001_2026.pdf PDF pages4–5; Zał. 2 do SWZ - OPZ część wspólna.pdf pages1,3–6",
    "license": "Copyright retained; bounded manually reviewed factual observations; no open bulk-reuse licence asserted; original documents not redistributed.",
    "access_method": "Original owner HTML/PDF/ZIP downloaded; technical tables and tender result visually reviewed",
    "member_checksums": {
      "tender_2.pdf": "2882e70c3c4c8105d0840aaf0e54c74c27232ec2a40a3c2fa658a0826de74777",
      "tender_8.pdf": "85b4a5a6a5ac2c486781e89c3abad098508bf4ba62cddf682fb7dadc795ecefb"
    },
    "member_name_mapping": {
      "tender_2.pdf": "SWZ_ostateczna+ogł/SWZ_PRZETARG NR EGD_0001_2026.pdf",
      "tender_8.pdf": "SWZ_ostateczna+ogł/Zał. 2 do SWZ - OPZ część wspólna.pdf"
    }
  },
  "energa_tender_annulment_20260709": {
    "url": "https://cdn-netpr.pl/file/attachment/3044570/ec/zawiadomienie_o_wyniku_egd_0001_2026_www.pdf",
    "sha256": "2514d275d820080cbad1f2b410bb7c00616c4f0c21d4c8f4c294be80df338d99",
    "retrieved_at": "2026-11-03T16:01:10.866221+00:00",
    "publisher": "Energa Green Development Sp. z o.o.",
    "title": "Zawiadomienie o wyniku postępowania EGD/0001/2026",
    "publication_date": "2026-07-09",
    "locator": "Page1, sole decision paragraph: all offers subject to rejection, procurement annulled",
    "license": "Copyright retained; bounded manually reviewed factual observations; no open bulk-reuse licence asserted; original documents not redistributed.",
    "access_method": "Original owner HTML/PDF/ZIP downloaded; technical tables and tender result visually reviewed"
  },
  "energa_reprocurement_20260722": {
    "url": "https://cdn-netpr.pl/file/attachment/3050258/d0/ogloszenie_przetargu_egd_0002_2026.pdf",
    "sha256": "14e8436749426faaa86159a0f687e2f0e1e2b4bc792adad07eb10ba466327f15",
    "retrieved_at": "2026-11-03T16:51:53.350741+00:00",
    "title": "EGD/0002/2026 notice",
    "publisher": "Energa Green Development Sp. z o.o.",
    "publication_date": "2026-07-22",
    "document_revision": null,
    "locator": "Pages1–3, sections2.2,4.4,4.7; task table page2",
    "license": "Copyright retained; bounded manually reviewed factual observations; no open bulk licence asserted; original files not redistributed.",
    "access_method": "Original public owner or manufacturer PDF from manufacturer-named service partner; extracted text and technical tables visually reviewed"
  },
  "energa_procurement_budget_20260908": {
    "url": "https://cdn-netpr.pl/file/attachment/3066544/af/informacja_o_kwocie_przeznaczonej_na_sfin_zam_.pdf",
    "sha256": "a17246578ef426259810e6ba93067f59b01e6191171f6ce10d271f6f11ed21d3",
    "retrieved_at": "2026-11-03T16:51:59.467913+00:00",
    "title": "EGD/0002/2026 intended financing amount",
    "publisher": "Energa Green Development Sp. z o.o.",
    "publication_date": "2026-09-08",
    "document_revision": null,
    "locator": "Page1, gross intended budget for entire procurement",
    "license": "Copyright retained; bounded manually reviewed factual observations; no open bulk licence asserted; original files not redistributed.",
    "access_method": "Original public owner or manufacturer PDF from manufacturer-named service partner; extracted text and technical tables visually reviewed"
  },
  "pge_ted_719197_2026": {
    "url": "https://ted.europa.eu/en/notice/719197-2026/xml",
    "sha256": "679be166acfb329d0f90207b9bebb7f91ee40394f518befa63ddf285ab694423",
    "retrieved_at": "2026-11-03T17:53:42.600311+00:00",
    "title": "Budowa rozproszonych magazynów energii elektrycznej — 719197-2026",
    "publisher": "PGE INWEST 21 Sp. z o.o. / Publications Office of the European Union",
    "publication_date": "2026-10-19",
    "document_revision": "eForms SDK1.14; notice version01",
    "locator": "ContractNotice/ProcurementProjectLot LOT-0001 to LOT-0004; ProcurementProject/Name, CommodityClassification, PlannedPeriod; ContractingParty and organization references",
    "license": "TED legal notice permits commercial/noncommercial reuse of procurement notices unless otherwise noted; EU metadata CC0. Adapted factual subset; no personal contacts exported. https://ted.europa.eu/en/legal-notice",
    "access_method": "Original public XML",
    "terms_sha256": "8643d855c2e3d1c5f9b30531d75fc3cee47e3d4fbdff508e1d072d055ef859ac",
    "terms_retrieved_at": "2026-11-03T17:54:57.673307+00:00"
  },
  "mauritius_ministry_annual_2019": {
    "url": "https://publicutilities.govmu.org/Documents/2020/Reports%26Publications/annualreport2018-20191.pdf",
    "sha256": "22df358657365d12c499cfdc980d6d3526bec0a4b719bc872ada6901495dc04a",
    "retrieved_at": "2026-11-03T18:02:53.862379+00:00",
    "publisher": "Government of Mauritius, Ministry of Energy and Public Utilities",
    "title": "Annual report 2018–2019",
    "publication_date": null,
    "document_revision": "Financial year ending30June2019; exact publication date unknown",
    "locator": "PDF23/printed21, Battery Energy Storage Systems; PDF39/printed37 budget-status table",
    "license": "State copyright Government of Mauritius; accurate attributed factual adaptation under https://www.govmu.org/EN/Pages/Copyright.aspx; third-party material excluded; no report/photos redistributed.",
    "access_method": "Original public ministry PDF; relevant pages visually checked and text reviewed",
    "terms_sha256": "e65de05644caeff9a76be88e31151b12712d2e9856ae92edd5ada78461b47150",
    "terms_retrieved_at": "2026-11-03T18:03:49.207972+00:00"
  },
  "mauritius_ministry_annual_2020": {
    "url": "https://publicutilities.govmu.org/Documents/Annual%20Report%20%202019-2020.pdf",
    "sha256": "f2659908b3899ad6c67f846476e9226fc4e6265e713f4d803bba4adfa840bdc3",
    "retrieved_at": "2026-11-03T18:03:25.718584+00:00",
    "publisher": "Government of Mauritius, Ministry of Energy and Public Utilities",
    "title": "Annual report 2019–2020",
    "publication_date": null,
    "document_revision": "Financial year ending30June2020; exact publication date unknown",
    "locator": "PDF20/printed19, separate18MW Mauritius and1.5MW Rodrigues battery sections",
    "license": "State copyright Government of Mauritius; accurate attributed factual adaptation under https://www.govmu.org/EN/Pages/Copyright.aspx; third-party material excluded; no report/photos redistributed.",
    "access_method": "Original public ministry PDF; relevant pages visually checked and text reviewed",
    "terms_sha256": "e65de05644caeff9a76be88e31151b12712d2e9856ae92edd5ada78461b47150",
    "terms_retrieved_at": "2026-11-03T18:03:49.207972+00:00"
  },
  "mauritius_ministry_annual_2023": {
    "url": "https://publicutilities.govmu.org/Documents/Updated%20Annual%20Report%202022-2023.pdf",
    "sha256": "50fb287d83605325f8fa373f8121a03c5067ffea4ed81ce54065c2399a601536",
    "retrieved_at": "2026-11-03T18:03:44.203015+00:00",
    "publisher": "Government of Mauritius, Ministry of Energy and Public Utilities",
    "title": "Annual report 2022–2023",
    "publication_date": null,
    "document_revision": "Financial year ending30June2023; exact publication date unknown",
    "locator": "PDF30–31/printed29–30,20MW Amaury implementation paragraph",
    "license": "State copyright Government of Mauritius; accurate attributed factual adaptation under https://www.govmu.org/EN/Pages/Copyright.aspx; third-party material excluded; no report/photos redistributed.",
    "access_method": "Original public ministry PDF; relevant pages visually checked and text reviewed",
    "terms_sha256": "e65de05644caeff9a76be88e31151b12712d2e9856ae92edd5ada78461b47150",
    "terms_retrieved_at": "2026-11-03T18:03:49.207972+00:00"
  },
  "maldives_assure_sinosoar_2025": {
    "url": "https://www.sinosoarhybrid.com/sinosoars-renewable-hybrid-system-lands-in-maldives-2025/",
    "sha256": "73ce3c4967028e123733a2a09bc42997f62dd454099fb5d54cf3177ffbe99542",
    "retrieved_at": "2026-11-03T18:50:39.159586+00:00",
    "publisher": "Sino Soar Hybrid (Beijing) Technology Co., Ltd.",
    "title": "Renewable Hybrid System Lands in Maldives",
    "publication_date": "2025-04-10",
    "document_revision": "Dated public announcement; no revision stated",
    "locator": "First table: Energy Storage System Configurations for Islands, nine rows/two pairs per row; opening agreement paragraph",
    "license": "Public copyright notice or no explicit open licence; bounded manually reviewed factual extraction, no article/images redistributed. No open bulk-reuse licence asserted.",
    "access_method": "Original public HTML; named table manually reconciled; not the unrelated global portfolio tables"
  },
  "maldives_assure_presidency_2025": {
    "url": "https://blogs.presidency.gov.mv/daily-blogs/at-motmv-mot-signs-agreement-to-install-38-mwh-of-battery-energy-storage-systems-in-18-islands",
    "sha256": "de5f34bfd70c8f14ab1efd10aad8fe0ccb4e8f48b050f1a1c969d15c013ad0f5",
    "retrieved_at": "2026-11-03T18:50:43.419099+00:00",
    "publisher": "President’s Office, Republic of Maldives",
    "title": "MoT signs agreement to install38MWh of battery energy storage systems in18islands",
    "publication_date": "2025-04-07",
    "document_revision": "Dated public announcement; no revision stated",
    "locator": "Opening paragraph and ministry statement dated7April2025",
    "license": "Public copyright notice or no explicit open licence; bounded manually reviewed factual extraction, no article/images redistributed. No open bulk-reuse licence asserted.",
    "access_method": "Original public HTML; named table manually reconciled; not the unrelated global portfolio tables"
  },
  "maldives_arise_screening_2021": {
    "url": "https://old.environment.gov.mv/v2/download/1778/",
    "sha256": "b69f8336c30b658c1990df2a35f9760ba1e31c4ee27acba3e68b3141d31e1866",
    "retrieved_at": "2026-11-03T19:49:41.096311+00:00",
    "final_url": "https://old.environment.gov.mv/v2/wp-content/files/publications/20220112-pub-essr-bess-installation-phase1-and-2-arise-project.pdf",
    "publisher": "Ministry of Environment, Climate Change and Technology, Republic of Maldives",
    "title": "Environmental and Social Screening Report: Installation of approximately37MWh BESS in ARISE phase1 and2 islands",
    "publication_date": null,
    "document_revision": "Prepared/reviewed9December2021; publicly posted12January2022 in URL",
    "locator": "PDF p15 capacity table; pp1–16 scope, applications and site locations; p35 review date",
    "license": "Public government document; no blanket open licence assumed. Bounded attributed factual extraction only; no full document, maps, photographs or personal contacts redistributed. ASSURE borrower report directs to https://www.adb.org/terms-use; third-party content caveat retained.",
    "access_method": "Original public PDF or HTML; named tables visually checked, manual natural identity reconciliation",
    "document_date": "2021-12-09",
    "date_basis": "Prepared and reviewed date on PDF p35; publication day unknown"
  },
  "maldives_arise_retender_2022": {
    "url": "https://old.environment.gov.mv/v2/en/news/16082",
    "sha256": "e38f4843acc0674e5ff546bb4bf78dae320c569ba6987c38c803fab7468fb885",
    "retrieved_at": "2026-11-03T19:48:50.463535+00:00",
    "final_url": "https://old.environment.gov.mv/v2/en/news/16082",
    "publisher": "Ministry of Environment, Climate Change and Technology, Republic of Maldives",
    "title": "Maldives re-opens tender for40MWh BESS Project",
    "publication_date": "2022-08-09",
    "document_revision": "Dated ministry announcement",
    "locator": "Two numbered lists:18 named island grids; lot scope, financing and EPC/O&M paragraphs",
    "license": "Public government document; no blanket open licence assumed. Bounded attributed factual extraction only; no full document, maps, photographs or personal contacts redistributed. ASSURE borrower report directs to https://www.adb.org/terms-use; third-party content caveat retained.",
    "access_method": "Original public PDF or HTML; named tables visually checked, manual natural identity reconciliation"
  },
  "maldives_arise_rfb_2022": {
    "url": "https://www.gazette.gov.mv/iulaan/202830",
    "sha256": "ba60f52a6ec97309d0aa9cf1ae22485eebc332dcb6fb712934b0dbd12bca7d8f",
    "retrieved_at": "2026-11-03T19:48:54.731365+00:00",
    "final_url": "https://www.gazette.gov.mv/iulaan/202830",
    "publisher": "Maldives Government Gazette / Ministry of Finance",
    "title": "Design, Supply, Installation and Commissioning of BESS on Selected Islands in Maldives",
    "publication_date": "2022-08-07",
    "document_revision": "RFB MV-MEE-283164-GO-RFB; loanTF0B4303",
    "locator": "Notice project identifiers and two-lot description",
    "license": "Public government document; no blanket open licence assumed. Bounded attributed factual extraction only; no full document, maps, photographs or personal contacts redistributed. ASSURE borrower report directs to https://www.adb.org/terms-use; third-party content caveat retained.",
    "access_method": "Original public PDF or HTML; named tables visually checked, manual natural identity reconciliation"
  },
  "maldives_assure_iee_2023": {
    "url": "https://old.environment.gov.mv/v2/download/4602/",
    "sha256": "87c2c64bb1e3682f9a8a1ebe38b6ec33713be05fe94dc88c3b32c21f6282f3a3",
    "retrieved_at": "2026-11-03T19:52:39.918751+00:00",
    "final_url": "https://old.environment.gov.mv/v2/wp-content/files/publications/20250422-pub-accelerating-sustainable-system-development-using-renewable-energy-project-main-report.pdf",
    "publisher": "Ministry of Finance, Government of Maldives",
    "title": "ASSURE Initial Environmental Examination, Main Report",
    "publication_date": "2023-03",
    "document_revision": "Draft; project55191-001; March2023; ministry mirror uploaded2025",
    "locator": "Printed p30 Table7 (PDF p40), pp31–32 chemistry, p50 works, p58 operation; pp46–48 irrigation design (PDF pp56–58)",
    "license": "Public government document; no blanket open licence assumed. Bounded attributed factual extraction only; no full document, maps, photographs or personal contacts redistributed. ASSURE borrower report directs to https://www.adb.org/terms-use; third-party content caveat retained.",
    "access_method": "Original public PDF or HTML; named tables visually checked, manual natural identity reconciliation"
  },
  "adb_poised_2024_table21": {
    "url": "https://old.environment.gov.mv/v2/wp-content/files/publications/20240925-pub-maldives-deploying-hybrid-renewable-energy.pdf",
    "final_url": "https://old.environment.gov.mv/v2/wp-content/files/publications/20240925-pub-maldives-deploying-hybrid-renewable-energy.pdf",
    "sha256": "ad10d3d5dbee6e87ea23b282cc234077fea86aa09e29b49831340d1b0478928c",
    "retrieved_at": "2026-11-03T20:51:17.263333+00:00",
    "title": "Preparing Outer Islands for Sustainable Energy Development: Maldives Experience in Deploying Advanced Hybrid Renewable Energy Systems",
    "publisher": "Asian Development Bank",
    "locator": "Printed pp9–10 / PDF pp23–24 Table2.1 and preceding commissioning statement; p14 chemistry",
    "document_revision": "2024; DOI 10.22617/TCS240404-2",
    "publication_date": "2024",
    "license": "Bounded attributed factual extraction; no full documents redistributed. Public access is not a blanket bulk licence. TESVOLT copyright retained; ADB book CC BY 3.0 IGO excludes third-party material (Table 2.1 attributed to Maldives ministry)."
  },
  "cabo_santiago_sal_2150": {
    "url": "https://cabeolica.com/wp-content/uploads/2025/02/NTS_Simplified_ESIA_Sal_and_Santiago_Final_251601.pdf",
    "final_url": "https://cabeolica.com/wp-content/uploads/2025/02/NTS_Simplified_ESIA_Sal_and_Santiago_Final_251601.pdf",
    "retrieved_at": "2026-11-03T22:01:52.181814+00:00",
    "title": "Cabeolica expansion components1–3 Santiago and Sal NTS",
    "publisher": "Cabeolica SA / Advisian",
    "locator": "pp8,11–13 Table2-3; design-stage ratings and connection",
    "document_revision": "06106-416041-47260-B-06-0023 Rev E",
    "publication_date": "2025-01-16",
    "license": "Owner public disclosure; p2 prohibits copying the report without permission. Only independently transcribed factual observations are committed, no report reproduction; no bulk licence claimed.",
    "access_method": "Public web document reader; direct download returned HTTP403; no original PDF bytes/checksum available",
    "sha256": null
  },
  "cabo_boa_2150": {
    "url": "https://cabeolica.com/wp-content/uploads/2025/03/NTS_Simplified_ESIA_BESS_Boa_Vista.pdf",
    "final_url": "https://cabeolica.com/wp-content/uploads/2025/03/NTS_Simplified_ESIA_BESS_Boa_Vista.pdf",
    "retrieved_at": "2026-11-03T22:01:52.181814+00:00",
    "title": "Cabeolica expansion component5 Boa Vista NTS",
    "publisher": "Cabeolica SA / Advisian",
    "locator": "pp8–10 Table2-1; p13 lifecycle; p14 chemistry",
    "document_revision": "06106-416041-47260-B-06-0028 Rev D",
    "publication_date": "2025-02-28",
    "license": "Owner public disclosure; p2 prohibits copying the report without permission. Only independently transcribed factual observations are committed, no report reproduction; no bulk licence claimed.",
    "access_method": "Public web document reader; direct download returned HTTP403; no original PDF bytes/checksum available",
    "sha256": null
  },
  "cabo_vicente_2150": {
    "url": "https://cabeolica.com/wp-content/uploads/2025/03/NTS_Simplified_ESIA_BESS_Sao_Vicente.pdf",
    "final_url": "https://cabeolica.com/wp-content/uploads/2025/03/NTS_Simplified_ESIA_BESS_Sao_Vicente.pdf",
    "retrieved_at": "2026-11-03T22:01:52.181814+00:00",
    "title": "Cabeolica expansion component4 São Vicente NTS",
    "publisher": "Cabeolica SA / Advisian",
    "locator": "pp9–12 Table2-1; p14 lifecycle; p15 chemistry",
    "document_revision": "06106-416041-47260-B-06-0027 Rev D",
    "publication_date": "2025-02-14",
    "license": "Owner public disclosure; p2 prohibits copying the report without permission. Only independently transcribed factual observations are committed, no report reproduction; no bulk licence claimed.",
    "access_method": "Public web document reader; direct download returned HTTP403; no original PDF bytes/checksum available",
    "sha256": null
  },
  "gov_vicente_2150": {
    "url": "https://www.governo.cv/primeiro-ministro-inaugura-sistema-de-armazenamento-de-energia-em-baterias-em-s-vicente/",
    "final_url": "https://www.governo.cv/primeiro-ministro-inaugura-sistema-de-armazenamento-de-energia-em-baterias-em-s-vicente/",
    "retrieved_at": "2026-11-03T21:56:13.951898+00:00",
    "title": "Inauguração do sistema de armazenamento em São Vicente",
    "publisher": "Governo de Cabo Verde",
    "locator": "Article body, dated29January2026",
    "document_revision": null,
    "publication_date": "2026-01-29",
    "license": "Copyright retained; bounded attributed factual observations only, no documents or images redistributed; no blanket open/bulk licence claimed.",
    "access_method": "Original public bytes downloaded",
    "sha256": "aca2f26a25c5065454567a32bff9bdf02cfcc5ab790ab7b7c286dc1f68529698"
  },
  "gov_boa_2150": {
    "url": "https://www.governo.cv/primeiro-ministro-na-boa-vista-inaugurado-o-sistema-de-armazenamento-de-energia-em-baterias/",
    "final_url": "https://www.governo.cv/primeiro-ministro-na-boa-vista-inaugurado-o-sistema-de-armazenamento-de-energia-em-baterias/",
    "retrieved_at": "2026-11-03T21:56:19.520346+00:00",
    "title": "Inauguração do sistema de armazenamento na Boa Vista",
    "publisher": "Governo de Cabo Verde",
    "locator": "Article body and EUR6million investment statement",
    "document_revision": null,
    "publication_date": "2026-02-21",
    "license": "Copyright retained; bounded attributed factual observations only, no documents or images redistributed; no blanket open/bulk licence claimed.",
    "access_method": "Original public bytes downloaded",
    "sha256": "59c38b65859572f51bf9933668395eff7a8c9a7ac6d1c52c94fdc4b35b41486d"
  },
  "gov_sal_2150": {
    "url": "https://www.governo.cv/primeiro-ministro-inaugura-no-sal-a-extensao-da-central-electrica-e-o-sistema-de-armazenamento-de-energia-em-baterias/",
    "final_url": "https://www.governo.cv/primeiro-ministro-inaugura-no-sal-a-extensao-da-central-electrica-e-o-sistema-de-armazenamento-de-energia-em-baterias/",
    "retrieved_at": "2026-11-03T21:57:33.303479+00:00",
    "title": "Inauguração no Sal da extensão da central e sistema de baterias",
    "publisher": "Governo de Cabo Verde",
    "locator": "Article paragraphs on battery inauguration and EUR6million investment; thermal plant excluded",
    "document_revision": null,
    "publication_date": "2026-02-11",
    "license": "Copyright retained; bounded attributed factual observations only, no documents or images redistributed; no blanket open/bulk licence claimed.",
    "access_method": "Original public bytes downloaded",
    "sha256": "bab7a677aff7f1e74c6fcfbe569b5772343f0eaaa2fbbbce6a628a77b4741741"
  },
  "gov_santiago_2150": {
    "url": "https://www.governo.cv/wp-content/uploads/2025/12/newsletter_novembro_2025_n29_suple_especial_oe2026.pdf",
    "final_url": "https://www.governo.cv/wp-content/uploads/2025/12/newsletter_novembro_2025_n29_suple_especial_oe2026.pdf",
    "retrieved_at": "2026-11-03T21:59:19.802241+00:00",
    "title": "Governo em Ação Novembro2025 No29",
    "publisher": "Governo de Cabo Verde",
    "locator": "Printed p27 / PDF p28; Santiago expansion inauguration and installed battery",
    "document_revision": "Newsletter29",
    "publication_date": "2025-11",
    "license": "Copyright retained; bounded attributed factual observations only, no documents or images redistributed; no blanket open/bulk licence claimed.",
    "access_method": "Original public bytes downloaded",
    "sha256": "4c5f084ccc3e5b9366b617f9c81617d6eb72f9cf1b78b469be08a5bf847462f2"
  },
  "cabeolica_annual2024_2348": {
    "url": "https://cabeolica.com/wp-content/uploads/2025/09/RC_2024_EN.pdf",
    "retrieved_at": "2026-11-03T23:53:15.769748+00:00",
    "sha256": null,
    "title": "Cabeolica Annual Report 2024",
    "publisher": "Cabeólica S.A.",
    "publication_date": "2025-03-27",
    "document_revision": "2024 reporting year; board report dated27March2025",
    "locator": "PDF p25 / printed25, Expansion Project; PDF p24 / printed24, financing paragraph",
    "license": "Copyright retained; bounded attributed factual observations from owner public annual disclosure; no open bulk licence or full-document redistribution claimed.",
    "access_method": "Public document reader; original download403; original-byte checksum unavailable"
  },
  "sie_sie002_20261104": {
    "url": "https://sie.gob.do/wp-content/uploads/2026/01/SIE-002-2026-RCD.pdf",
    "retrieved_at": "2026-11-04T00:52:01.422682+00:00",
    "sha256": "1ffd9b32edb216b021c62c76baf420d04cc038746c07e642770dc7e19d92d1cd",
    "publisher": "Superintendencia de Electricidad, República Dominicana",
    "title": "Resolución SIE-002-2026-RCD — Parque Solar Mirasol SAEB",
    "publication_date": "2026-01-09",
    "locator": "PDF pp1–3,8–13; technical report pp9–10; original decision incomplete",
    "license": "Public official resolution; site terms retain copyright and do not grant open bulk reuse. Bounded attributed factual review only; no full text, personal data or PDF redistribution.",
    "access_method": "Original scanned PDF downloaded; selected technical and decision pages visually reviewed; OCR is navigation only.",
    "terms_url": "https://sie.gob.do/terminos-de-uso/"
  },
  "sie_sie002corrected_20261104": {
    "url": "https://sie.gob.do/wp-content/uploads/2026/03/SIE-002-2026-RCD-3.pdf",
    "retrieved_at": "2026-11-04T00:54:17.784862+00:00",
    "sha256": "4aedae29233f9cc1d890cdf18ae8210a1630a80518f82022dc3fec91cb429903",
    "publisher": "Superintendencia de Electricidad, República Dominicana",
    "title": "Acto rectificativo y Resolución SIE-002-2026-RCD — Mirasol SAEB",
    "publication_date": "2026-01-09",
    "locator": "PDF p1 correction notice; pp2–15 corrected resolution; decision printed pp11–14 (PDF12–15). Original number/date retained; March URL is not issue date.",
    "license": "Public official resolution; site terms retain copyright and do not grant open bulk reuse. Bounded attributed factual review only; no full text, personal data or PDF redistribution.",
    "access_method": "Original scanned PDF downloaded; selected technical and decision pages visually reviewed; OCR is navigation only.",
    "terms_url": "https://sie.gob.do/terminos-de-uso/"
  },
  "sie_sie004_20261104": {
    "url": "https://sie.gob.do/wp-content/uploads/2026/01/SIE-004-2026-RCD.pdf",
    "retrieved_at": "2026-11-04T00:52:05.824688+00:00",
    "sha256": "2c3eaf62bfa74f8ea2bd0d35c739759938f3ac52d4f87de8c32fc836ca335cc1",
    "publisher": "Superintendencia de Electricidad, República Dominicana",
    "title": "Resolución SIE-004-2026-RCD — Planta Santanasol SAEB",
    "publication_date": "2026-01-09",
    "locator": "PDF pp1–3,10–13,17; printed page numbers match PDF",
    "license": "Public official resolution; site terms retain copyright and do not grant open bulk reuse. Bounded attributed factual review only; no full text, personal data or PDF redistribution.",
    "access_method": "Original scanned PDF downloaded; selected technical and decision pages visually reviewed; OCR is navigation only.",
    "terms_url": "https://sie.gob.do/terminos-de-uso/"
  },
  "sie_sie006_20261104": {
    "url": "https://sie.gob.do/wp-content/uploads/2026/01/SIE-006-2026-RCD.pdf",
    "retrieved_at": "2026-11-04T00:52:12.099593+00:00",
    "sha256": "0983198c95291ddfbb53a2f2c76352c602c91ac5b45b9d65792875abaa0a52aa",
    "publisher": "Superintendencia de Electricidad, República Dominicana",
    "title": "Resolución SIE-006-2026-RCD — Peravia Solar I SAEB",
    "publication_date": "2026-01-15",
    "locator": "PDF pp1–3,9–12,15; cover/year2026 and signed date15January2026; footer says2025",
    "license": "Public official resolution; site terms retain copyright and do not grant open bulk reuse. Bounded attributed factual review only; no full text, personal data or PDF redistribution.",
    "access_method": "Original scanned PDF downloaded; selected technical and decision pages visually reviewed; OCR is navigation only.",
    "terms_url": "https://sie.gob.do/terminos-de-uso/"
  },
  "sie_haina_20261104": {
    "url": "https://sie.gob.do/wp-content/uploads/2026/09/SIE-114-2026-AMEM.pdf",
    "retrieved_at": "2026-11-04T00:57:00.484109+00:00",
    "sha256": "a1a89d80a2ca1140deb0a558999d65ee972a9628b2c77446b6e952e07ae81a32",
    "publisher": "Superintendencia de Electricidad, República Dominicana",
    "title": "Resolución SIE-114-2026-AMEM — BESS-Haina installation authorization",
    "publication_date": "2026-09-08",
    "locator": "PDF pp1,6–12; authorized ratingsp10, commissioning prerequisitespp9,11–12; technical paragraphp7 misnames asset",
    "license": "Public official resolution; site terms retain copyright and do not grant open bulk reuse. Bounded attributed factual review only; no full text, personal data or PDF redistribution.",
    "access_method": "Original scanned PDF downloaded; selected technical and decision pages visually reviewed; OCR is navigation only.",
    "terms_url": "https://sie.gob.do/terminos-de-uso/"
  },
  "sie_laesa_120_2026": {
    "url": "https://sie.gob.do/wp-content/uploads/2026/09/SIE-120-2026-RCD.pdf",
    "sha256": "9220aa6e858d9232b22dda69e4e822d330dc4179715ae80ad1c16ba377af1955",
    "retrieved_at": "2026-11-04T02:52:04.185790+00:00",
    "publisher": "Superintendencia de Electricidad, República Dominicana",
    "title": "Resolución SIE-120-2026-RCD — Parque Solar LAESA",
    "publication_date": "2026-09-22",
    "locator": "Decision PDF pp1,8–12; annex report dated2026-09-14, PDF pp15,17,29–30,42,53,59–65 (printed annex3,5,17–18,30,41,47–53). All annex pages OCR-indexed; only these technical passages substantively reviewed.",
    "license": "Public copyright retained; bounded factual review, no open bulk licence or full-document redistribution.",
    "terms_url": "https://sie.gob.do/terminos-de-uso/",
    "document_revision": "Decision2026-09-22; annex technical/legal report2026-09-14, SIE-2026-0081"
  },
  "sie_fv6_088_2026": {
    "url": "https://sie.gob.do/wp-content/uploads/2026/07/SIE-088-2026-RCD.pdf",
    "sha256": "0a02a0a0b83553e0d5eab7dea318581e00f0ecfa8ceb561fdbfb4b1f4c4dd748",
    "retrieved_at": "2026-11-04T02:49:13.578569+00:00",
    "title": "Resolución SIE-088-2026-RCD — Parque Fotovoltaico FV6",
    "publisher": "Superintendencia de Electricidad, República Dominicana",
    "publication_date": "2026-07-02",
    "locator": "Decision PDF pp1,8–11,14–16; signed date p16, not July27 PDF creation/upload. Technical annex pp17–116 not fully reviewed.",
    "license": "Copyright retained; bounded factual review, no open bulk reuse licence or full document redistribution.",
    "terms_url": "https://sie.gob.do/terminos-de-uso/",
    "access_method": "Original scanned PDF downloaded; OCR used for navigation and accepted passages visually checked"
  },
  "sie_maranatha_139_2025": {
    "url": "https://sie.gob.do/wp-content/uploads/2025/11/SIE-139-2025-RCD.pdf",
    "sha256": "ac7143804278e566099133434148301e2430a0dd8dcc63b96d658ba7b9964f32",
    "retrieved_at": "2026-11-04T02:51:59.028938+00:00",
    "title": "Resolución SIE-139-2025-RCD — ampliación Parque Solar Fotovoltaico Maranatha20MW",
    "publisher": "Superintendencia de Electricidad, República Dominicana",
    "publication_date": "2025-10-16",
    "locator": "PDF pp1,8–12 decision; annex pp13–96 not substantively extracted",
    "license": "Copyright retained; bounded factual review, no open bulk licence or full document redistribution.",
    "terms_url": "https://sie.gob.do/terminos-de-uso/",
    "access_method": "Original scanned PDF downloaded; accepted passages visually checked"
  },
  "cne_maranatha_modif_005_2026": {
    "url": "https://cne.gob.do/concesion/parque-solar-fotovoltaico-maranatha/",
    "title": "Parque Solar Fotovoltaico Maranatha20MW — concesión",
    "publisher": "Comisión Nacional de Energía, República Dominicana",
    "retrieved_at": "2026-11-04T02:56:39.823053+00:00",
    "publication_date": null,
    "document_revision": "CNE-CD-MODIF-005-2026, dated2026-03-17",
    "locator": "Named concession registry record: resolution/date, storage MW/MWh, company, location, solar ratings, duration",
    "sha256": null,
    "access_method": "Primary-site indexed search-reader text; live page fetch470. No original-page byte checksum or current availability assertion.",
    "license": "Copyright retained; bounded factual observations only. Public indexing is not open bulk reuse permission."
  },
  "ecocloud_saigeri_20261008": {
    "url": "https://ecocloudconsultants.co.ke/projects/saigeri-40mw-solar-park/",
    "sha256": "8fb8a080895742a204b069b73fdac2c69a1a5c8ab1429b3683c575ef64716297",
    "retrieved_at": "2026-11-04T03:52:24.930995+00:00",
    "title": "Saigeri 40 MW Solar Park & Storage",
    "publisher": "Eco Cloud Consultants Limited",
    "publication_date": "2026-10-08",
    "locator": "Project overview, at-a-glance and project status",
    "license": "Copyright retained; terms2026-10-03 reviewed. Bounded public factual record only, no materials redistribution or private documents.",
    "access_method": "Original public HTML downloaded; project consultant primary account, not independent commissioning verification"
  },
  "ngcp_as_202609": {
    "url": "https://www.ngcp.ph/Attachment-Uploads/Customer%20Bulletin%20Nos-2026-09-29-14-42-56.%202026-51.pdf",
    "sha256": "3a20fd283904bf9065bfe9d0236c23584606bbe614f99f20bd12d11e90fa70a7",
    "retrieved_at": "2026-11-04T05:04:15.939401+00:00",
    "publisher": "National Grid Corporation of the Philippines",
    "title": "Customer Bulletin 2026-51: Ancillary Services Procurement Status as of September 2026",
    "publication_date": "2026-09-28",
    "locator": "PDF pp1–3, exact battery rows; service legend",
    "license": "All rights reserved; bounded factual review only. No open bulk-reuse licence asserted; original document not redistributed.",
    "terms_review_url": "https://www.ngcp.ph/privacy",
    "access_method": "Public original PDF downloaded; exact rows reviewed and offline parser reconciled"
  },
  "doe_mindanao_committed_20240731": {
    "url": "https://legacy.doe.gov.ph/sites/default/files/pdf/electric_power/03_Mindanao%20Committed_31jul2024.pdf",
    "publisher": "Philippines Department of Energy",
    "title": "Mindanao Committed Power Projects as of 31 July 2024",
    "document_revision": "2024-07-31 reporting snapshot",
    "retrieved_at": "2026-11-04T05:11:38.575640+00:00",
    "sha256": null,
    "locator": "PDF pp1–2; Battery Energy Storage System subsection, nine named rows",
    "license": "Government publication; DOE portal states public domain unless otherwise stated. Bounded factual review; no source-document redistribution or general bulk-reuse licence asserted.",
    "terms_review_url": "https://doe.gov.ph/",
    "access_method": "Successful public web PDF text retrieval during this session; original download subsequently returned503 and reader retry502. No original bytes available; checksum deliberately null.",
    "limitations": "Historical committed inventory, not current operating capacity. Targets and on-hold notes remain dated observations."
  },
  "mgen_toledo_phase1_20260508": {
    "url": "https://www.meralcopowergen.com.ph/mgen-energizes-toledo-bess-boosting-visayas-grid-stability/",
    "sha256": "4143a611527eba8ad444dab3db5db43860067df5c7200456d0a703a7e7c56b63",
    "retrieved_at": "2026-11-04T05:05:19.367401+00:00",
    "publisher": "Meralco PowerGen Corporation",
    "title": "MGEN Energizes Toledo BESS, Boosting Visayas Grid Stability",
    "publication_date": "2026-05-08",
    "locator": "Main article paragraphs on Phase1 operations, developer/host site and Phase2 target",
    "license": "All rights reserved; bounded factual review, no document redistribution or open bulk-reuse licence asserted.",
    "terms_review_url": "https://www.meralcopowergen.com.ph/mgen-energizes-toledo-bess-boosting-visayas-grid-stability/",
    "access_method": "Public owner HTML downloaded; footer rights statement inspected; privacy page timed out"
  },
  "berc_kajra_42_2025_final_20260316": {
    "url": "https://berc.co.in/images/pdf/Other-Order/FO_CN_42_of_2025_DT_160326.pdf",
    "sha256": "b9d6480602fe29d8fe8caffeb55345324e60eeeddf2bce28a7b49502d989ae8a",
    "retrieved_at": "2026-11-04T06:53:50.527384+00:00",
    "publisher": "Bihar Electricity Regulatory Commission",
    "title": "Final order, Case42/2025: Kajra185MWAC solar with282MWh BESS",
    "publication_date": "2026-03-16",
    "locator": "PDFpp2–3 sections1.1,2.2–2.6;pp5–6 sections3.2–3.6",
    "license": "Public regulatory order; no explicit open bulk-reuse licence identified on the landing page. Bounded factual extraction; no document redistribution.",
    "terms_review_url": "https://berc.co.in/",
    "access_method": "Original six-page regulator PDF downloaded; all six pages reviewed",
    "document_revision": "Final order dated16.03.2026;Case42/2025"
  },
  "fluence_rohini_inauguration_20190213": {
    "url": "https://blog.fluenceenergy.com/south-asia-largest-energy-storage-system-india",
    "sha256": "116111a35f1392b70272452d3640655dad1569a2f970c36ebcf7d852f12c5318",
    "retrieved_at": "2026-11-04T06:58:46.498218+00:00",
    "publisher": "Fluence",
    "title": "AES and Mitsubishi Corporation Collaborate with Tata Power-DDL to Power Up South Asia’s Largest Grid-Scale Energy Storage System in India",
    "publication_date": "2019-02-13",
    "locator": "Press release opening paragraphs1–5 and Tata Power-DDL quote",
    "license": "Copyright retained; no open bulk-reuse licence identified. Limited factual project metadata only; no article redistribution.",
    "terms_review_url": "https://fluenceenergy.com/website-privacy-policy/",
    "access_method": "Original public press-release HTML; linked privacy policy inspected through web reader. Main homepage returned403; no bypass attempted."
  },
  "scatec_q3_2026_bess_20261104": {
    "url": "https://storage.mfn.se/c22a164a-0df7-4b00-835d-f49ee6658eb9/scatec-q3-2026-report.pdf",
    "publisher": "Scatec ASA",
    "title": "Third quarter report 2026",
    "publication_date": "2026-10-30",
    "retrieved_at": "2026-11-04T08:57:57.881899+00:00",
    "license": "Copyright retained. Bounded factual extraction from issuer-linked public financial report; no open bulk licence asserted; no report redistribution. Privacy policy inspected.",
    "terms_url": "https://www.scatec.com/en/privacy-policy/",
    "sha256": "6f837caaa3e359fda0a255b5b3dfa24704b8a4778b02849bdfb0f4abb0e75765",
    "access_method": "original issuer-linked PDF download",
    "locator": "PDF pp.6,8,25,27–28: named BESS rows, connection delay and asset-portfolio table; some tables include events after quarter end"
  },
  "scatec_mogobe_delay_20261021": {
    "url": "https://www.scatec.com/en/scatec-revises-full-year-2026-power-production-ebitda-estimate/",
    "sha256": "557b678a10c7c5cea1204520ad3837cfdf3c0f672c7c218468e5b91b256b9c7e",
    "retrieved_at": "2026-11-04T08:55:37.050555+00:00",
    "publisher": "Scatec ASA",
    "title": "2026 earnings update and Mogobe connection delay",
    "license": "Copyright retained. Bounded factual extraction from issuer-linked public financial report; no open bulk licence asserted; no report redistribution. Privacy policy inspected.",
    "terms_url": "https://www.scatec.com/en/privacy-policy/",
    "access_method": "original public HTML download",
    "locator": "Bullet on Mogobe; excludes corporate EBITDA changes",
    "publication_date": "2026-10-21"
  },
  "scatec_romania_20261104": {
    "url": "https://www.scatec.com/en/project/romania/",
    "sha256": "0466e79aeccb7d5aa068e8f567b7d0408b9385a0ab8586708554b1219b9e3810",
    "retrieved_at": "2026-11-04T08:55:23.932245+00:00",
    "publisher": "Scatec ASA",
    "title": "Romania project portfolio",
    "license": "Copyright retained. Bounded factual extraction from issuer-linked public financial report; no open bulk licence asserted; no report redistribution. Privacy policy inspected.",
    "terms_url": "https://www.scatec.com/en/privacy-policy/",
    "access_method": "original public HTML download",
    "locator": "Backlog: Buciumi battery row"
  },
  "scatec_q2_2026_buciumi": {
    "url": "https://www.scatec.com/en/scatec-second-quarter-2026-growth-journey-and-solid-project-execution-continues/",
    "sha256": "fbad4811b06f0a9b906e0740beddf53f69e6717336387146cbc54219430de083",
    "retrieved_at": "2026-11-04T08:55:32.758209+00:00",
    "publisher": "Scatec ASA",
    "title": "Second quarter 2026 results",
    "license": "Copyright retained. Bounded factual extraction from issuer-linked public financial report; no open bulk licence asserted; no report redistribution. Privacy policy inspected.",
    "terms_url": "https://www.scatec.com/en/privacy-policy/",
    "access_method": "original public HTML download",
    "locator": "Milestones: Buciumi advanced to backlog",
    "publication_date": "2026-08-21"
  },
  "sse_monk_project_20261104": {
    "url": "https://www.sserenewables.com/battery-and-solar/battery-storage/monk-fryston/",
    "sha256": "f74aae9e907d6e2c725bdc8fe86f86388d3d78c44606d80a1554bb829761f693",
    "retrieved_at": "2026-11-04T09:31:10.574132+00:00",
    "publisher": "SSE Renewables",
    "title": "Monk battery project owner page",
    "license": "Copyright retained. Bounded attributed factual extraction of three named project pages; not an open bulk licence and no page redistribution. Footer and privacy notice inspected.",
    "terms_url": "https://www.sserenewables.com/privacy-notice/",
    "locator": "Project introduction, construction delivery and project history paragraphs",
    "access_method": "Original public HTML download; undated page"
  },
  "sse_fiddler_project_20261104": {
    "url": "https://www.sserenewables.com/battery-and-solar/battery-storage/fiddlers-ferry/",
    "sha256": "6e41631f90b9d17c2db9049219f858fcceb6557de210e0c279ed6883a36bb6de",
    "retrieved_at": "2026-11-04T09:31:10.568743+00:00",
    "publisher": "SSE Renewables",
    "title": "Fiddler battery project owner page",
    "license": "Copyright retained. Bounded attributed factual extraction of three named project pages; not an open bulk licence and no page redistribution. Footer and privacy notice inspected.",
    "terms_url": "https://www.sserenewables.com/privacy-notice/",
    "locator": "Project introduction, construction delivery and project history paragraphs",
    "access_method": "Original public HTML download; undated page"
  },
  "sse_derrymeen_project_20261104": {
    "url": "https://www.sserenewables.com/battery-and-solar/battery-storage/derrymeen/",
    "sha256": "d6ae37d39ddd0bed81aafbd3d6d843189f98d97d48a302490ad58e09cb99b444",
    "retrieved_at": "2026-11-04T09:31:14.841898+00:00",
    "publisher": "SSE Renewables",
    "title": "Derrymeen battery project owner page",
    "license": "Copyright retained. Bounded attributed factual extraction of three named project pages; not an open bulk licence and no page redistribution. Footer and privacy notice inspected.",
    "terms_url": "https://www.sserenewables.com/privacy-notice/",
    "locator": "Project introduction, construction delivery and project history paragraphs",
    "access_method": "Original public HTML download; undated page"
  },
  "zenobe_blackhillock_current_20261104": {
    "url": "https://www.zenobe.com/battery-project-development/blackhillock-bess/",
    "sha256": "99759a049cc513d5a4bf91c47fef3351938431fa862d165ff4dc9e0865d21a0d",
    "retrieved_at": "2026-11-04T09:41:25.748718+00:00",
    "publisher": "Zenobē",
    "title": "Blackhillock BESS phase2 project page",
    "license": "Copyright retained; bounded factual extraction from three owner pages. Policies/privacy and footer inspected; no open bulk-reuse licence asserted. Documents not redistributed.",
    "terms_url": "https://www.zenobe.com/policies/",
    "locator": "Project description and phase/capacity paragraphs",
    "access_method": "Original public HTML download"
  },
  "zenobe_blackhillock_launch_20261104": {
    "url": "https://www.zenobe.com/news-and-events/blackhillock-battery-storage-launch/",
    "sha256": "c876c222818bd146f22257d9b6a5571bf684b197655c9798b2eaa01506d41272",
    "retrieved_at": "2026-11-04T09:41:25.748508+00:00",
    "publisher": "Zenobē",
    "title": "Blackhillock commercial launch",
    "license": "Copyright retained; bounded factual extraction from three owner pages. Policies/privacy and footer inspected; no open bulk-reuse licence asserted. Documents not redistributed.",
    "terms_url": "https://www.zenobe.com/policies/",
    "locator": "Project description and phase/capacity paragraphs",
    "access_method": "Original public HTML download",
    "publication_date": "2025-03-03"
  },
  "zenobe_blackhillock_award_20261104": {
    "url": "https://www.zenobe.com/news-and-events/blackhillock-bess-named-in-prestigious-time-best-inventions-of-2025/",
    "sha256": "5415544d9477ba1323336930b36436c55ead0f2a8033e7fe47aaa0cdba6dea37",
    "retrieved_at": "2026-11-04T09:41:25.593917+00:00",
    "publisher": "Zenobē",
    "title": "Blackhillock phase1 operating scope",
    "license": "Copyright retained; bounded factual extraction from three owner pages. Policies/privacy and footer inspected; no open bulk-reuse licence asserted. Documents not redistributed.",
    "terms_url": "https://www.zenobe.com/policies/",
    "locator": "Project description and phase/capacity paragraphs",
    "access_method": "Original public HTML download",
    "publication_date": "2025-10-14"
  },
  "govza_besipppp_bw3_awards_20250530": {
    "url": "https://www.gov.za/news/media-statements/minister-kgosientsho-ramokgopa-battery-energy-storage-independent-power",
    "publisher": "South African Government / Department of Electricity and Energy",
    "title": "Minister Kgosientsho Ramokgopa on Battery Energy Storage Independent Power Procurement Programme",
    "published_date": "2025-05-30",
    "retrieved_at": "2026-11-04T10:58:28.863282+00:00",
    "locator": "Preferred Bidder table, exact project-name row; preceding buyer/programme paragraph",
    "license": "Copyright Government of South Africa. Bounded attributed factual observations from one five-row award table only; no open bulk reuse licence claimed. Footer inspected; attempted terms/about routes unavailable. No prose, full webpage or table layout redistributed.",
    "access_method": "Original publisher page read via web retrieval; direct byte download returned503, so no successful-original checksum claimed."
  },
  "ea_nz_bess_status_20260929": {
    "url": "https://www.ea.govt.nz/news/press-release/authority-changes-rules-to-boost-battery-flexibility/",
    "retrieved_at": "2026-11-04T11:52:29.624659+00:00",
    "sha256": "1c422ff492fb617f4259cd56d0a0f7d9a6a86ad09d38bdbc28256255ae7a6a54",
    "publisher": "Electricity Authority Te Mana Hiko",
    "title": "Authority changes rules to boost battery flexibility",
    "published_date": "2026-09-29",
    "locator": "Status of BESS developments, exact named row; six rows",
    "license": "CC BY4.0, Electricity Authority on behalf of the Crown. Author-created factual table; no third-party report or imagery copied.",
    "terms_url": "https://www.ea.govt.nz/copyright-disclaimer-transparency/",
    "access_method": "Original HTML HTTP200; all six rows reviewed against canonical exact identities and newer evidence"
  },
  "taipower_portfolio_20261104": {
    "url": "https://www.moea.gov.tw/MNS/populace/content/Content2.aspx?menu_id=44744",
    "retrieved_at": "2026-11-04T12:59:29.210619+00:00",
    "sha256": "d16fed8e1b418801e8033285767b63d03d78c4dbdcc7eee31b6c45013c8c35e4",
    "publisher": "Taiwan Ministry of Economic Affairs",
    "title": "多元綠能",
    "publication_date": null,
    "locator": "Storage-system paragraph naming 路園、龍潭、冬山及南鹽田光儲; total160MW is an aggregate, not another project",
    "license": "Attributed factual reuse: Ministry website Government Open Data License v1 and Taipower website open-content statement; special third-party copyright exceptions excluded. No full document redistributed.",
    "terms_url": "https://www.moea.gov.tw/Mns/populace/content/ContentFoot.aspx?menu_id=13863",
    "document_revision": null
  },
  "taipower_longtan_20261104": {
    "url": "https://www.moea.gov.tw/Mns/Populace/news/News.aspx?kind=1&menu_id=40&news_id=113658",
    "retrieved_at": "2026-11-04T12:59:29.234340+00:00",
    "sha256": "fd52bd13d49ca782741690aae43aa805ec69f5ebaed570cbcd9e4c868ab0af7f",
    "publisher": "Taiwan Power Company / Ministry of Economic Affairs",
    "title": "打造強韌電網 變電所化身儲能基地 台電龍潭60MW儲能系統今啟用",
    "publication_date": "2024-01-22",
    "locator": "Main article paragraphs: 龍潭,60MW/80MWh,25containers,Fluence/東元 and response/safety",
    "license": "Attributed factual reuse: Ministry website Government Open Data License v1 and Taipower website open-content statement; special third-party copyright exceptions excluded. No full document redistributed.",
    "terms_url": "https://www.moea.gov.tw/Mns/populace/content/ContentFoot.aspx?menu_id=13863",
    "document_revision": null
  },
  "taipower_dongshan_20261104": {
    "url": "https://mnscdn.moea.gov.tw/Mns/populace/news/News.aspx?kind=1&menu_id=40&news_id=117970",
    "retrieved_at": "2026-11-04T12:59:34.623040+00:00",
    "sha256": "1576c00335c2a3ef60e5edab8f09a52d8f2757e3586138e9d5cc90cbe87e9a5d",
    "publisher": "Taiwan Power Company / Ministry of Economic Affairs",
    "title": "穩定電網供電 台電再添大將！宜蘭冬山60MW儲能系統啟用",
    "publication_date": "2024-11-21",
    "locator": "Main article paragraphs: 冬山,60MW/85MWh,23containers,E-dReg,20November inauguration; 路園20MW",
    "license": "Attributed factual reuse: Ministry website Government Open Data License v1 and Taipower website open-content statement; special third-party copyright exceptions excluded. No full document redistributed.",
    "terms_url": "https://www.moea.gov.tw/Mns/populace/content/ContentFoot.aspx?menu_id=13863",
    "document_revision": null
  },
  "taipower_yantian_20261104": {
    "url": "https://www.moea.gov.tw/Mns/Populace/news/News.aspx?kind=1&menu_id=40&news_id=104232",
    "retrieved_at": "2026-11-04T12:59:34.578371+00:00",
    "sha256": "b1595e24083b65e315f1bcfad0ae19a9f0098af2c7186e59bf9b6dab023999d9",
    "publisher": "Taiwan Power Company / Ministry of Economic Affairs",
    "title": "綠能+儲能！台電台南鹽田光電場打造全台最大20MW儲能系統",
    "publication_date": "2023-01-06",
    "locator": "Main article paragraphs: battery20MW/20MWh;PV150MW;8Saftcontainers;partners",
    "license": "Attributed factual reuse: Ministry website Government Open Data License v1 and Taipower website open-content statement; special third-party copyright exceptions excluded. No full document redistributed.",
    "terms_url": "https://www.moea.gov.tw/Mns/populace/content/ContentFoot.aspx?menu_id=13863",
    "document_revision": null
  },
  "taipower_research2023_20261104": {
    "url": "https://service.taipower.com.tw/TPRI/media/i50gim5a/112annualreport.pdf?mediaDL=true",
    "retrieved_at": "2026-11-04T13:09:02.484812+00:00",
    "sha256": "f34bb9f3a989b9e4e41b08207f4e3edb6bfa1860dc483168b7598df99f4272e1",
    "publisher": "Taiwan Power Research Institute, Taiwan Power Company",
    "title": "2023 Research & Testing Annual Report /112年度研發試驗年報",
    "publication_date": "2023",
    "locator": "PDF page127 (printed126), Kinmen ESS Operation Data Integration and Analysis; two completed2020 systems,2021 operation study",
    "license": "Attributed factual reuse: Ministry website Government Open Data License v1 and Taipower website open-content statement; special third-party copyright exceptions excluded. No full document redistributed.",
    "terms_url": "https://service.taipower.com.tw/nbmi/open_data/",
    "document_revision": "112年度 /2023 annual report"
  },
  "sarawak_bess_20261104": {
    "url": "https://www.sarawakenergy.com/media-info/media-releases/2025/sarawak-energy-strengthens-grid-resilience-with-battery-energy-storage-system",
    "retrieved_at": "2026-11-04T13:24:35.328202+00:00",
    "sha256": "c78e685df3aec8ba1f6b6041dd3956c6118c00bf732fca8eb1cc1556e4ca074a",
    "publisher": "Sarawak Energy",
    "title": "Sarawak Energy Strengthens Grid Resilience With Battery Energy Storage System",
    "publication_date": "2025-02-14",
    "locator": "Main article paragraphs1–3 and Sejingkat plant paragraph",
    "license": "Copyright retained; no explicit bulk-reuse licence found. Bounded, attributed factual project observations only; no full articles, photographs or document layout redistributed.",
    "terms_url": "https://www.sarawakenergy.com/privacy-policy",
    "access_method": "Original public PDF/HTML downloaded and manually reviewed; no registration"
  },
  "blue_finance_bess_20261104": {
    "url": "https://www.blueleafenergy.com/press/blueleaf-up-achieve-financial-close-for-100-mw-400-mwh-mybest-project/",
    "retrieved_at": "2026-11-04T13:25:21.887298+00:00",
    "sha256": "9e1233be2f9c719efb8cbe4d1920feb0a1fe167b41796f6a8f08f122413feb57",
    "publisher": "Blueleaf Energy",
    "title": "Blueleaf Energy & Universal Peak Achieve Financial Close with UOB for Landmark100MW/400MWh MyBeST Project",
    "publication_date": "2026-09-01",
    "locator": "Opening project paragraph, joint-venture paragraph and Universal Peak company section",
    "license": "Copyright retained; no explicit bulk-reuse licence found. Bounded, attributed factual project observations only; no full articles, photographs or document layout redistributed.",
    "terms_url": "https://www.blueleafenergy.com/terms-conditions/",
    "access_method": "Original public PDF/HTML downloaded and manually reviewed; no registration"
  },
  "st_bess_20261104": {
    "url": "https://www.st.gov.my/sites/default/files/2026-02/ST-Statement_Selection-of-Shortlisted-Bidders-%28MyBest%29_FINAL.pdf",
    "retrieved_at": "2026-11-04T13:24:40.409110+00:00",
    "sha256": "a4215ca6798115a2d9f2269bba7e4eef7ca5647fb26b379b0bf2cd3bc1658f62",
    "publisher": "Suruhanjaya Tenaga / Energy Commission Malaysia",
    "title": "Selection of Shortlisted Bidders for MyBeST",
    "publication_date": "2025-12-19",
    "locator": "PDF p1 project quantity/rating/target; p2 bidder table row1",
    "license": "Copyright retained; no explicit bulk-reuse licence found. Bounded, attributed factual project observations only; no full articles, photographs or document layout redistributed.",
    "terms_url": "https://www.st.gov.my/privacy",
    "access_method": "Original public PDF/HTML downloaded and manually reviewed; no registration"
  },
  "nam_projects_bess_20261104": {
    "url": "https://www.nampower.com.na/Projects",
    "retrieved_at": "2026-11-04T13:33:57.463810+00:00",
    "sha256": "29aebd205b1bdba712412bd8256c6895806a35f92c9b14e7cb0f75a27bcfa57b",
    "publisher": "NamPower",
    "title": "Projects — Omburu BESS",
    "publication_date": null,
    "locator": "Generation project4, first paragraph: arbitrage, emergency energy and grid-stability services",
    "license": "Copyright retained; no explicit bulk-reuse licence found. Bounded, attributed factual project observations only; no full articles, photographs or document layout redistributed.",
    "terms_url": "https://www.nampower.com.na/Projects",
    "access_method": "Original public PDF/HTML downloaded and manually reviewed; no registration"
  },
  "bigbatt_bess_20261104": {
    "url": "https://ec.europa.eu/assets/cinea/project_fiches/innovation_fund/101190972.pdf",
    "publisher": "European Commission / CINEA",
    "title": "BigBATT: Large-scale Battery Deployment in Generation Platform",
    "retrieved_at": "2026-11-04T15:57:35.878045+00:00",
    "sha256": "e6516726d9eed1d5897a0d0c1bbd33ba15928801121582031c0f21551b552f59",
    "publication_date": "2026-10-02",
    "document_revision": null,
    "locator": "PDF pp1–2; technical narrative, site and grant sidebar",
    "license": "European Union content under CC BY 4.0, except third-party images/material. Factual database transformation; no images or full documents redistributed.",
    "terms_url": "https://commission.europa.eu/legal-notice_en",
    "access_method": "Original public HTML/PDF downloaded and manually reviewed"
  },
  "flexpansion_bess_20261104": {
    "url": "https://ec.europa.eu/assets/cinea/project_fiches/innovation_fund/101252132.pdf",
    "publisher": "European Commission / CINEA",
    "title": "FLEXPANSION: Unlocking flexibility through cross-market value stacking",
    "retrieved_at": "2026-11-04T15:58:34.900470+00:00",
    "sha256": "ff6d718d2e74474a2e82b5a648480b93f846b1a0b5e889e5dc7bbc29192d2d26",
    "publication_date": "2026-10-02",
    "document_revision": null,
    "locator": "PDF pp1–2; technical narrative, site and grant sidebar",
    "license": "European Union content under CC BY 4.0, except third-party images/material. Factual database transformation; no images or full documents redistributed.",
    "terms_url": "https://commission.europa.eu/legal-notice_en",
    "access_method": "Original public HTML/PDF downloaded and manually reviewed"
  },
  "notnuke_bess_20261104": {
    "url": "https://ec.europa.eu/assets/cinea/project_fiches/innovation_fund/101252096.pdf",
    "publisher": "European Commission / CINEA",
    "title": "NotNukeOne: Large-scale Agri-PV with AI-optimized energy storage and trading",
    "retrieved_at": "2026-11-04T15:58:34.242620+00:00",
    "sha256": "a783d8adfebaee6a89e27c6fcf7f104086ab4f51754cb3d9942b4858ef1416d6",
    "publication_date": "2026-10-02",
    "document_revision": null,
    "locator": "PDF pp1–2; technical narrative, site and grant sidebar",
    "license": "European Union content under CC BY 4.0, except third-party images/material. Factual database transformation; no images or full documents redistributed.",
    "terms_url": "https://commission.europa.eu/legal-notice_en",
    "access_method": "Original public HTML/PDF downloaded and manually reviewed"
  },
  "pioneer_bess_20261104": {
    "url": "https://ec.europa.eu/assets/cinea/project_fiches/innovation_fund/101038964.pdf",
    "publisher": "European Commission / CINEA",
    "title": "PIONEER: airport second-life battery storage",
    "retrieved_at": "2026-11-04T15:57:36.239238+00:00",
    "sha256": "86d1b8ac1ec5051350113003c7a8374218caf0eab0e1c3791e1827e829715bb8",
    "publication_date": "2026-10-02",
    "document_revision": null,
    "locator": "PDF pp1–2; technical narrative, site and grant sidebar",
    "license": "European Union content under CC BY 4.0, except third-party images/material. Factual database transformation; no images or full documents redistributed.",
    "terms_url": "https://commission.europa.eu/legal-notice_en",
    "access_method": "Original public HTML/PDF downloaded and manually reviewed"
  },
  "innosolve_bess_20261104": {
    "url": "https://ec.europa.eu/assets/cinea/project_fiches/innovation_fund/101103011.pdf",
    "publisher": "European Commission / CINEA",
    "title": "InnoSolveGreen: Energy-as-a-Service",
    "retrieved_at": "2026-11-04T15:58:38.956523+00:00",
    "sha256": "e7d4238377d6a5e5920cc8a35d18173215af00abe50423c3840f2af6cd0f7758",
    "publication_date": "2026-10-02",
    "document_revision": null,
    "locator": "PDF pp1–2; technical narrative, site and grant sidebar",
    "license": "European Union content under CC BY 4.0, except third-party images/material. Factual database transformation; no images or full documents redistributed.",
    "terms_url": "https://commission.europa.eu/legal-notice_en",
    "access_method": "Original public HTML/PDF downloaded and manually reviewed"
  },
  "greenmotril_bess_20261104": {
    "url": "https://ec.europa.eu/assets/cinea/project_fiches/innovation_fund/101038908.pdf",
    "publisher": "European Commission / CINEA",
    "title": "GREENMOTRIL",
    "retrieved_at": "2026-11-04T15:58:40.659281+00:00",
    "sha256": "8535ed2e23516df9058ed269747a7a83e890d36c90e7362b7e7eab183af78b68",
    "publication_date": "2026-10-02",
    "document_revision": null,
    "locator": "PDF pp1–2; technical narrative, site and grant sidebar",
    "license": "European Union content under CC BY 4.0, except third-party images/material. Factual database transformation; no images or full documents redistributed.",
    "terms_url": "https://commission.europa.eu/legal-notice_en",
    "access_method": "Original public HTML/PDF downloaded and manually reviewed"
  },
  "bess4hydro_bess_20261104": {
    "url": "https://ec.europa.eu/assets/cinea/project_fiches/innovation_fund/101191220.pdf",
    "publisher": "European Commission / CINEA",
    "title": "BESS4HYDRO",
    "retrieved_at": "2026-11-04T15:58:40.949886+00:00",
    "sha256": "5169a064658bbf2f7b5eb642b01cd911bb852cb380291888d4e3a51fb919a4f7",
    "publication_date": "2026-10-02",
    "document_revision": null,
    "locator": "PDF pp1–2; technical narrative, site and grant sidebar",
    "license": "European Union content under CC BY 4.0, except third-party images/material. Factual database transformation; no images or full documents redistributed.",
    "terms_url": "https://commission.europa.eu/legal-notice_en",
    "access_method": "Original public HTML/PDF downloaded and manually reviewed"
  },
  "aquilon_bess_20261104": {
    "url": "https://ec.europa.eu/assets/cinea/project_fiches/innovation_fund/101038976.pdf",
    "publisher": "European Commission / CINEA",
    "title": "Aquilon",
    "retrieved_at": "2026-11-04T15:58:46.059525+00:00",
    "sha256": "8fbc07bcda3522b332597a47bf7b801d03f581d5c399c225cb94571599732712",
    "publication_date": "2026-10-02",
    "document_revision": null,
    "locator": "PDF pp1–2; technical narrative, site and grant sidebar",
    "license": "European Union content under CC BY 4.0, except third-party images/material. Factual database transformation; no images or full documents redistributed.",
    "terms_url": "https://commission.europa.eu/legal-notice_en",
    "access_method": "Original public HTML/PDF downloaded and manually reviewed"
  },
  "pioneer_operational_bess_20261104": {
    "url": "https://cinea.ec.europa.eu/featured-projects/pioneer-decarbonising-airport-operations-second-life-car-batteries_en",
    "publisher": "European Commission / CINEA",
    "title": "PIONEER: decarbonising airport operations with second-life car batteries",
    "retrieved_at": "2026-11-04T16:00:27.733308+00:00",
    "sha256": "fb9f81ece0bed93925ab25b56e6608651251aeca5ff3d91e00de1c818f2c38a3",
    "publication_date": "2025-06-20",
    "document_revision": null,
    "locator": "Opening ratings, Cargo City construction/inauguration, DER.OS and early-test paragraphs",
    "license": "European Union content under CC BY 4.0, except third-party images/material. Factual database transformation; no images or full documents redistributed.",
    "terms_url": "https://commission.europa.eu/legal-notice_en",
    "access_method": "Original public HTML/PDF downloaded and manually reviewed"
  },
  "inno_owner_bess_20261104": {
    "url": "https://greengenius.com/news/to-power-carlsberg-group-brewery-in-lithuania/",
    "publisher": "Green Genius",
    "title": "Green Genius to power Carlsberg Group brewery in Lithuania with solar PV and battery system",
    "retrieved_at": "2026-11-04T16:01:35.313740+00:00",
    "sha256": "99fa59283dc56d94d5ed7322d722b4e4d4b4a85016c546632f2bdd0b0a42cfbd",
    "publication_date": "2025-04-03",
    "document_revision": null,
    "locator": "Opening and named Utena/Butrimonys paragraphs; financing and technical sections",
    "license": "Copyright retained; no open bulk-reuse licence asserted. Bounded attributed factual observations, independently structured; no article, layout, logo or manual redistribution.",
    "terms_url": "https://greengenius.com/news/to-power-carlsberg-group-brewery-in-lithuania/",
    "access_method": "Original public HTML/PDF downloaded and manually reviewed"
  },
  "latvia_bess_20261104": {
    "url": "https://greengenius.com/news/green-genius-expands-capacity-in-latvia-battery-energy-storage-system-commissioned/",
    "publisher": "Green Genius",
    "title": "Green Genius expands capacity in Latvia: BESS commissioned",
    "retrieved_at": "2026-11-04T16:05:21.880288+00:00",
    "sha256": "0f6f2bbf7af7b5266b570f2366180f52aaf0cfdd5340f8b269dcd4f60f80e21f",
    "publication_date": "2026-10-13",
    "document_revision": null,
    "locator": "Jēkabpils first-phase paragraphs and four named Lithuanian portfolio bullets",
    "license": "Copyright retained; no open bulk-reuse licence asserted. Bounded attributed factual observations, independently structured; no article, layout, logo or manual redistribution.",
    "terms_url": "https://greengenius.com/news/green-genius-expands-capacity-in-latvia-battery-energy-storage-system-commissioned/",
    "access_method": "Original public HTML/PDF downloaded and manually reviewed"
  },
  "cinea_bess_20261104": {
    "url": "https://cinea.ec.europa.eu/news-events/news/cef-energy-backs-major-modernisation-slovakias-cierny-vah-pumped-storage-plant-2026-10-20_en",
    "publisher": "European Commission / CINEA",
    "title": "CEF Energy backs major modernisation of Slovakia’s Čierny Váh pumped-storage plant",
    "retrieved_at": "2026-11-04T15:56:16.407960+00:00",
    "sha256": "372a35b39c96cdf59b228fe40cbb6c6162c72d9bffc5c15b1bb33198fdbf7d74",
    "publication_date": "2026-10-20",
    "document_revision": null,
    "locator": "From pumped hydro to hybrid storage; Phase II explicitly outside CEF Phase I works",
    "license": "European Union content under CC BY 4.0, except third-party images/material. Factual database transformation; no images or full documents redistributed.",
    "terms_url": "https://commission.europa.eu/legal-notice_en",
    "access_method": "Original public HTML/PDF downloaded and manually reviewed"
  },
  "dossi_current_bess_20261104": {
    "url": "https://www.enelgreenpower.com/our-projects/operating/dossi-hydroelectric-power-plant",
    "publisher": "Enel Green Power",
    "title": "Dossi hydroelectric power plant — BESS4HYDRO",
    "retrieved_at": "2026-11-04T16:02:45.358988+00:00",
    "sha256": "b2b9f593791a96c43f75314ff8719899c6abc14b19fb9c6dcba6fca843149b1f",
    "publication_date": null,
    "document_revision": null,
    "locator": "Battery integration paragraph and 4 MW battery narrative, not host plant dashboard",
    "license": "Copyright retained; no open bulk-reuse licence asserted. Bounded attributed factual observations, independently structured; no article, layout, logo or manual redistribution.",
    "terms_url": "https://www.enelgreenpower.com/legal-notes",
    "access_method": "Original public HTML/PDF downloaded and manually reviewed",
    "terms_assessment": "Public legal-notes route returned its heading/footer but no substantive licence text; copyright retained, no open licence claimed. Limited attributed facts only."
  },
  "motril_reg_bess_20261104": {
    "url": "https://www.juntadeandalucia.es/boja/2026/122/77",
    "publisher": "Junta de Andalucía",
    "title": "BOJA 122/2026: environmental authorisation for BESS Puerto de Motril",
    "retrieved_at": "2026-11-04T16:01:35.653518+00:00",
    "sha256": "06a4da8bfd4ecff231e891974403f56a5aaa127549000d67cb2b3ac8fa3e4947",
    "publication_date": "2026-06-26",
    "document_revision": null,
    "locator": "Notice of 26 May 2026, published 26 June; AAUS/GR/002/26, Cuerva Energía",
    "license": "CC BY 3.0 for portal texts, with required attribution; official disposition exclusion acknowledged in portal notice. Información obtenida del Portal de la Junta de Andalucía. No endorsement implied; factual fields transformed.",
    "terms_url": "https://www.juntadeandalucia.es/informacion/legal.html",
    "access_method": "Original public HTML/PDF downloaded and manually reviewed"
  },
  "ieso_lt1_20261104": {
    "name": "ieso_lt1",
    "url": "https://www.ieso.ca/-/media/Files/IESO/Document-Library/long-term-rfp/LT1-RFP-results-table-20260417.pdf",
    "status": 200,
    "sha256": "d918ec76c55fef8f78061a3ed9ab0876f643b9d7d28e1da5ca05bfa8e2ff75e1",
    "retrieved_at": "2026-11-04T16:57:50.212106+00:00",
    "bytes": 103618,
    "title": "Long-Term RFP (LT1 RFP) Final Results",
    "publisher": "Independent Electricity System Operator",
    "publication_date": "2026-04-17",
    "locator": "Storage Category Selected Proponents, pages1–4; exact named project row",
    "license": "Copyright © 2004-2022 Independent Electricity System Operator, all rights reserved. This information is subject to the Terms of Use set out in the IESO’s website (www.ieso.ca)",
    "terms_url": "https://www.ieso.ca/terms-of-use",
    "terms_sha256": "db6b3cfd677ecf0018a7a1a7b0e85a6078569a3b909e6aca865378804f90758b",
    "reuse_assessment": "Limited licence to use/reproduce with attribution; no sublicense, trademarks, website code or full PDF distributed. Source-specific disclaimer reviewed."
  },
  "ieso_news_20261104": {
    "name": "ieso_news",
    "url": "https://www.ieso.ca/en/Sector-Participants/IESO-News/2024/05/Resource-Adequacy-Update-Adding-2195-MW-of-Capacity-to-the-Grid",
    "status": 200,
    "sha256": "79790f8d8aea5660188411323135c66a3aecbad13b91176c253fa3759474aae1",
    "retrieved_at": "2026-11-04T16:58:02.936587+00:00",
    "bytes": 40370,
    "title": "Resource Adequacy Update: Adding 2,195 MW of Capacity to the Grid",
    "publisher": "Independent Electricity System Operator",
    "publication_date": "2024-05-09",
    "locator": "Opening paragraph identifies all ten LT1 storage facilities as batteries",
    "license": "Copyright © 2004-2022 Independent Electricity System Operator, all rights reserved. This information is subject to the Terms of Use set out in the IESO’s website (www.ieso.ca)",
    "terms_url": "https://www.ieso.ca/terms-of-use",
    "terms_sha256": "db6b3cfd677ecf0018a7a1a7b0e85a6078569a3b909e6aca865378804f90758b",
    "reuse_assessment": "Limited licence to use/reproduce with attribution; no sublicense, trademarks, website code or full PDF distributed. Source-specific disclaimer reviewed."
  },
  "elt1_20261104": {
    "name": "elt1",
    "url": "https://www.ieso.ca/-/media/Files/IESO/Document-Library/long-term-rfp/ELT1-RFP-Selected-Proponents.pdf",
    "status": 200,
    "sha256": "abede026a01d5930bff483c2436a7e4a31d5a1f19182cc5f26d6bc01c7fe7fbd",
    "retrieved_at": "2026-11-04T18:54:49.875419+00:00",
    "bytes": 198079,
    "title": "Expedited Long-Term RFP Final Results",
    "publisher": "Independent Electricity System Operator",
    "publication_date": "2023-09-18",
    "locator": "Pages1–2, named project row",
    "license": "Copyright © 2004-2022 Independent Electricity System Operator, all rights reserved. This information is subject to the Terms of Use set out in the IESO’s website (www.ieso.ca)",
    "terms_url": "https://www.ieso.ca/terms-of-use",
    "terms_sha256": "db6b3cfd677ecf0018a7a1a7b0e85a6078569a3b909e6aca865378804f90758b",
    "reuse_assessment": "Limited attributed use/reproduction; existing IESO notice applies. No original PDF redistributed."
  },
  "classification_20261104": {
    "name": "classification",
    "url": "https://www.ieso.ca/-/media/Files/IESO/Document-Library/resource-adequacy/ieso-resource-adequacy-update-june2023.ashx",
    "status": 200,
    "sha256": "f2249dfcea66fea7927913b4a6f3ab8f2792554921cb059bb6f670bad1d22311",
    "retrieved_at": "2026-11-04T18:55:29.641472+00:00",
    "bytes": 154141,
    "title": "IESO Resource Adequacy Update",
    "publisher": "Independent Electricity System Operator",
    "publication_date": "2023-06-27",
    "locator": "Pages1–2, Acquiring new supply: all15 storage projects are battery fleet",
    "license": "Copyright © 2004-2022 Independent Electricity System Operator, all rights reserved. This information is subject to the Terms of Use set out in the IESO’s website (www.ieso.ca)",
    "terms_url": "https://www.ieso.ca/terms-of-use",
    "terms_sha256": "db6b3cfd677ecf0018a7a1a7b0e85a6078569a3b909e6aca865378804f90758b",
    "reuse_assessment": "Limited attributed use/reproduction; existing IESO notice applies. No original PDF redistributed."
  },
  "lt2final_20261104": {
    "name": "lt2final",
    "url": "https://www.ieso.ca/-/media/Files/IESO/Document-Library/long-term-rfp/capacity/LT2c-1-20260702-Public-Result-Table-With-Individual-Prices.pdf",
    "status": 200,
    "sha256": "bb4216094b935d6b201a52104f8cb225e0bd6bf4ac95073b069bc48514e77247",
    "retrieved_at": "2026-11-04T19:52:09.449179+00:00",
    "bytes": 85977,
    "publisher": "Independent Electricity System Operator",
    "title": "LT2 capacity window1 final results",
    "publication_date": "2026-07-13",
    "locator": "Page1, named project row",
    "license": "Copyright © 2004-2022 Independent Electricity System Operator, all rights reserved. This information is subject to the Terms of Use set out in the IESO’s website (www.ieso.ca)",
    "terms_url": "https://www.ieso.ca/Terms-of-Use",
    "terms_sha256": "db6b3cfd677ecf0018a7a1a7b0e85a6078569a3b909e6aca865378804f90758b",
    "reuse_assessment": "IESO limited licence with required attribution retained; original PDF not redistributed"
  },
  "lt2class_20261104": {
    "name": "lt2class",
    "url": "https://www.ieso.ca/en/Sector-Participants/IESO-News/2026/06/June-18---Long-Term-2-Capacity-Stream-Results-Announced",
    "status": 200,
    "sha256": "e8e4694bfbb7dd0829fba96a59f07b69da8edd3278f03b1f505444ec28c0d6ce",
    "retrieved_at": "2026-11-04T19:52:14.802054+00:00",
    "bytes": 40190,
    "publisher": "Independent Electricity System Operator",
    "title": "Long-Term2 Capacity Stream Results Announced",
    "publication_date": "2026-06-19",
    "locator": "First substantive paragraph: three new-build battery facilities",
    "license": "Copyright © 2004-2022 Independent Electricity System Operator, all rights reserved. This information is subject to the Terms of Use set out in the IESO’s website (www.ieso.ca)",
    "terms_url": "https://www.ieso.ca/Terms-of-Use",
    "terms_sha256": "db6b3cfd677ecf0018a7a1a7b0e85a6078569a3b909e6aca865378804f90758b",
    "reuse_assessment": "IESO limited licence with required attribution retained; original PDF not redistributed"
  },
  "BOE-A-2026-21766": {
    "name": "BOE-A-2026-21766",
    "url": "https://www.boe.es/diario_boe/xml.php?id=BOE-A-2026-21766",
    "status": 200,
    "retrieved_at": "2026-11-04T20:53:39.831788+00:00",
    "sha256": "04fc0e40b8effe75f09a6a401fe5f10724120ff4847273b88d962e19a2d54172",
    "bytes": 27846,
    "publisher": "Agencia Estatal Boletín Oficial del Estado / Ministerio para la Transición Ecológica y el Reto Demográfico",
    "title": "Resolución de 23 de septiembre de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Planta Solar OPDE 17, SL, la autorización administrativa previa y la autorización administrativa de construcción del módulo de almacenamiento por baterías «Hibridación Los Arcos», de 26,74 MW de potencia instalada, y para su infraestructura de evacuación, para su hibridación con el parque solar fotovoltaico existente «Los Arcos», de 43,90 MW de potencia instalada, en Andorra (Teruel).",
    "publication_date": "2026-10-19",
    "document_version": "20261019071605",
    "locator": "XML texto/p numbered from0; technical characteristics and operative decision; paragraph map in research ledger",
    "license": "BOE general reuse conditions, Resolution27June2024; commercial/noncommercial reuse with attribution and no endorsement",
    "terms_url": "https://www.boe.es/informacion/aviso_legal/index.php",
    "terms_sha256": "744fcb66dc62e4d438e4b406d3e2efd829f74b855f8a685d1f6bf90e31429989",
    "attribution": "Basado en datos de la Agencia Estatal Boletín Oficial del Estado (https://www.boe.es). Adapted factual records; not official or endorsed."
  },
  "BOE-A-2026-21769": {
    "name": "BOE-A-2026-21769",
    "url": "https://www.boe.es/diario_boe/xml.php?id=BOE-A-2026-21769",
    "status": 200,
    "retrieved_at": "2026-11-04T20:53:43.723605+00:00",
    "sha256": "7e718e0a2b1b2b25ded292806e003aad6a9d5d14d563b7f06530713dbac12906",
    "bytes": 23969,
    "publisher": "Agencia Estatal Boletín Oficial del Estado / Ministerio para la Transición Ecológica y el Reto Demográfico",
    "title": "Resolución de 29 de septiembre de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Enel Green Power España, SL, autorización administrativa previa y autorización administrativa de construcción de la instalación de almacenamiento por baterías «Tesouro Storage», de 17,5 MW de potencia instalada, y su infraestructura de evacuación, para su hibridación con el parque eólico «Tesouro», de 50,4 MW de potencia instalada, en As Pontes de García Rodríguez (A Coruña).",
    "publication_date": "2026-10-19",
    "document_version": "20261019071605",
    "locator": "XML texto/p numbered from0; technical characteristics and operative decision; paragraph map in research ledger",
    "license": "BOE general reuse conditions, Resolution27June2024; commercial/noncommercial reuse with attribution and no endorsement",
    "terms_url": "https://www.boe.es/informacion/aviso_legal/index.php",
    "terms_sha256": "744fcb66dc62e4d438e4b406d3e2efd829f74b855f8a685d1f6bf90e31429989",
    "attribution": "Basado en datos de la Agencia Estatal Boletín Oficial del Estado (https://www.boe.es). Adapted factual records; not official or endorsed."
  },
  "BOE-A-2026-21855": {
    "name": "BOE-A-2026-21855",
    "url": "https://www.boe.es/diario_boe/xml.php?id=BOE-A-2026-21855",
    "status": 200,
    "retrieved_at": "2026-11-04T20:53:47.815803+00:00",
    "sha256": "5042954faf27b25da3e7de523f4a7c28947f54353f07db05ef793b21f68578f4",
    "bytes": 26928,
    "publisher": "Agencia Estatal Boletín Oficial del Estado / Ministerio para la Transición Ecológica y el Reto Demográfico",
    "title": "Resolución de 16 de septiembre de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Planta FV100, SL, autorización administrativa previa y autorización administrativa de construcción del módulo de almacenamiento de energía por baterías «Solaria-Santiz I», de 19,993 MW de potencia instalada, y su infraestructura de evacuación, para su hibridación con la instalación fotovoltaica existente «FV Solaria-Santiz I», de 49,989 MW, en Valdelosa (Salamanca).",
    "publication_date": "2026-10-20",
    "document_version": "20261020071601",
    "locator": "XML texto/p numbered from0; technical characteristics and operative decision; paragraph map in research ledger",
    "license": "BOE general reuse conditions, Resolution27June2024; commercial/noncommercial reuse with attribution and no endorsement",
    "terms_url": "https://www.boe.es/informacion/aviso_legal/index.php",
    "terms_sha256": "744fcb66dc62e4d438e4b406d3e2efd829f74b855f8a685d1f6bf90e31429989",
    "attribution": "Basado en datos de la Agencia Estatal Boletín Oficial del Estado (https://www.boe.es). Adapted factual records; not official or endorsed."
  },
  "BOE-A-2026-21856": {
    "name": "BOE-A-2026-21856",
    "url": "https://www.boe.es/diario_boe/xml.php?id=BOE-A-2026-21856",
    "status": 200,
    "retrieved_at": "2026-11-04T20:53:51.880087+00:00",
    "sha256": "555528ffdf621e2f1dea24237bc8db6c0deafaf17c5c7321dcbc8d59e664a29f",
    "bytes": 28614,
    "publisher": "Agencia Estatal Boletín Oficial del Estado / Ministerio para la Transición Ecológica y el Reto Demográfico",
    "title": "Resolución de 16 de septiembre de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Planta Solar OPDE 3, SL, autorización administrativa previa y autorización administrativa de construcción del módulo de almacenamiento por baterías «Hibridación Los Belos», de 26,74 MW de potencia instalada, y para su infraestructura de evacuación, para su hibridación con el parque solar fotovoltaico existente «Los Belos», de 41,6 MW de potencia instalada, en La Muela y Muel (Zaragoza).",
    "publication_date": "2026-10-20",
    "document_version": "20261020071601",
    "locator": "XML texto/p numbered from0; technical characteristics and operative decision; paragraph map in research ledger",
    "license": "BOE general reuse conditions, Resolution27June2024; commercial/noncommercial reuse with attribution and no endorsement",
    "terms_url": "https://www.boe.es/informacion/aviso_legal/index.php",
    "terms_sha256": "744fcb66dc62e4d438e4b406d3e2efd829f74b855f8a685d1f6bf90e31429989",
    "attribution": "Basado en datos de la Agencia Estatal Boletín Oficial del Estado (https://www.boe.es). Adapted factual records; not official or endorsed."
  },
  "BOE-A-2026-21858": {
    "name": "BOE-A-2026-21858",
    "url": "https://www.boe.es/diario_boe/xml.php?id=BOE-A-2026-21858",
    "status": 200,
    "retrieved_at": "2026-11-04T20:53:55.991582+00:00",
    "sha256": "ba36fb62c792ebeabdd6426d4f0c36e7a900d3ade516ed1456f4fdd099c35cdb",
    "bytes": 26294,
    "publisher": "Agencia Estatal Boletín Oficial del Estado / Ministerio para la Transición Ecológica y el Reto Demográfico",
    "title": "Resolución de 25 de septiembre de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Iberdrola Renovables Aragón, SAU, autorización administrativa previa y autorización administrativa de construcción para el proyecto de almacenamiento por baterías «BESS Hibridación FV Teruel», de 27,64 MW de potencia instalada, y para una parte de su infraestructura de evacuación, para su hibridación con la instalación solar fotovoltaica existente «FV Teruel», de 42,56 MW de potencia instalada, en Azaila (Teruel).",
    "publication_date": "2026-10-20",
    "document_version": "20261020071601",
    "locator": "XML texto/p numbered from0; technical characteristics and operative decision; paragraph map in research ledger",
    "license": "BOE general reuse conditions, Resolution27June2024; commercial/noncommercial reuse with attribution and no endorsement",
    "terms_url": "https://www.boe.es/informacion/aviso_legal/index.php",
    "terms_sha256": "744fcb66dc62e4d438e4b406d3e2efd829f74b855f8a685d1f6bf90e31429989",
    "attribution": "Basado en datos de la Agencia Estatal Boletín Oficial del Estado (https://www.boe.es). Adapted factual records; not official or endorsed."
  },
  "BOE-A-2026-21938": {
    "name": "BOE-A-2026-21938",
    "url": "https://www.boe.es/diario_boe/xml.php?id=BOE-A-2026-21938",
    "status": 200,
    "retrieved_at": "2026-11-04T20:54:00.755748+00:00",
    "sha256": "e3c2d2a708cafa698e3e5e660350333e434fab39c3673c45d3fb92a93fc15123",
    "bytes": 28923,
    "publisher": "Agencia Estatal Boletín Oficial del Estado / Ministerio para la Transición Ecológica y el Reto Demográfico",
    "title": "Resolución de 9 de mayo de 2025, de la Dirección General de Política Energética y Minas, por la que se otorga a Naturgy Renovables, SLU, la autorización administrativa previa y la autorización administrativa de construcción del módulo de almacenamiento por baterías «BESS Tabernas I», de 19,8 MW de potencia instalada, y para su infraestructura de evacuación, para su hibridación con el parque solar fotovoltaico existente «Tabernas I», de 48,8 MW de potencia instalada, situado en Tabernas (Almería).",
    "publication_date": "2026-10-21",
    "document_version": "20261021071617",
    "locator": "XML texto/p numbered from0; technical characteristics and operative decision; paragraph map in research ledger",
    "license": "BOE general reuse conditions, Resolution27June2024; commercial/noncommercial reuse with attribution and no endorsement",
    "terms_url": "https://www.boe.es/informacion/aviso_legal/index.php",
    "terms_sha256": "744fcb66dc62e4d438e4b406d3e2efd829f74b855f8a685d1f6bf90e31429989",
    "attribution": "Basado en datos de la Agencia Estatal Boletín Oficial del Estado (https://www.boe.es). Adapted factual records; not official or endorsed."
  },
  "BOE-A-2026-22068": {
    "name": "BOE-A-2026-22068",
    "url": "https://www.boe.es/diario_boe/xml.php?id=BOE-A-2026-22068",
    "status": 200,
    "retrieved_at": "2026-11-04T20:54:04.772228+00:00",
    "sha256": "f80322ae232843f005fe351918bacd5d9faff65aa12332dafede34e645f718d7",
    "bytes": 24679,
    "publisher": "Agencia Estatal Boletín Oficial del Estado / Ministerio para la Transición Ecológica y el Reto Demográfico",
    "title": "Resolución de 29 de septiembre de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Planta FV 115, SL, autorización administrativa previa y autorización administrativa de construcción para el proyecto de almacenamiento con baterías Castor, de 19,993 MW de potencia instalada, y su infraestructura de evacuación para su hibridación con la planta fotovoltaica Castor Solar, de 49,99 MW de potencia instalada, en Huecas (Toledo).",
    "publication_date": "2026-10-22",
    "document_version": "20261022071606",
    "locator": "XML texto/p numbered from0; technical characteristics and operative decision; paragraph map in research ledger",
    "license": "BOE general reuse conditions, Resolution27June2024; commercial/noncommercial reuse with attribution and no endorsement",
    "terms_url": "https://www.boe.es/informacion/aviso_legal/index.php",
    "terms_sha256": "744fcb66dc62e4d438e4b406d3e2efd829f74b855f8a685d1f6bf90e31429989",
    "attribution": "Basado en datos de la Agencia Estatal Boletín Oficial del Estado (https://www.boe.es). Adapted factual records; not official or endorsed."
  },
  "BOE-A-2026-22075": {
    "name": "BOE-A-2026-22075",
    "url": "https://www.boe.es/diario_boe/xml.php?id=BOE-A-2026-22075",
    "status": 200,
    "retrieved_at": "2026-11-04T20:54:08.724106+00:00",
    "sha256": "45de298ef4d1a4dd612488d04117d4927799a15be18d36c0b57751e24ece25be",
    "bytes": 29609,
    "publisher": "Agencia Estatal Boletín Oficial del Estado / Ministerio para la Transición Ecológica y el Reto Demográfico",
    "title": "Resolución de 5 de octubre de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Planta Solar OPDE 6, SL, autorización administrativa previa y autorización administrativa de construcción del módulo de almacenamiento por baterías «Hibridación Montesol», de 26,74 MW de potencia instalada, y para su infraestructura de evacuación, para su hibridación con el parque solar fotovoltaico existente «Montesol», de 41,6 MW de potencia instalada, en Cañada Vellida (Teruel).",
    "publication_date": "2026-10-22",
    "document_version": "20261022071606",
    "locator": "XML texto/p numbered from0; technical characteristics and operative decision; paragraph map in research ledger",
    "license": "BOE general reuse conditions, Resolution27June2024; commercial/noncommercial reuse with attribution and no endorsement",
    "terms_url": "https://www.boe.es/informacion/aviso_legal/index.php",
    "terms_sha256": "744fcb66dc62e4d438e4b406d3e2efd829f74b855f8a685d1f6bf90e31429989",
    "attribution": "Basado en datos de la Agencia Estatal Boletín Oficial del Estado (https://www.boe.es). Adapted factual records; not official or endorsed."
  },
  "BOE-A-2026-22213": {
    "name": "BOE-A-2026-22213",
    "url": "https://www.boe.es/diario_boe/xml.php?id=BOE-A-2026-22213",
    "status": 200,
    "retrieved_at": "2026-11-04T20:54:16.535799+00:00",
    "sha256": "ad4a236422500ae5589ef3b5294c588a86ce62c5d8361081a42a5d399dfce6ab",
    "bytes": 31068,
    "publisher": "Agencia Estatal Boletín Oficial del Estado / Ministerio para la Transición Ecológica y el Reto Demográfico",
    "title": "Resolución de 7 de septiembre de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Soner Picasso, SLU, autorización administrativa previa para la planta de almacenamiento con baterías BESS Cuevas, de 55,176 MW de potencia instalada, y su infraestructura de evacuación, en la Vall d'Uixó (Castellón).",
    "publication_date": "2026-10-23",
    "document_version": "20261023071620",
    "locator": "XML texto/p numbered from0; technical characteristics and operative decision; paragraph map in research ledger",
    "license": "BOE general reuse conditions, Resolution27June2024; commercial/noncommercial reuse with attribution and no endorsement",
    "terms_url": "https://www.boe.es/informacion/aviso_legal/index.php",
    "terms_sha256": "744fcb66dc62e4d438e4b406d3e2efd829f74b855f8a685d1f6bf90e31429989",
    "attribution": "Basado en datos de la Agencia Estatal Boletín Oficial del Estado (https://www.boe.es). Adapted factual records; not official or endorsed."
  },
  "BOE-B-2026-34914": {
    "name": "BOE-B-2026-34914",
    "url": "https://www.boe.es/diario_boe/xml.php?id=BOE-B-2026-34914",
    "status": 200,
    "retrieved_at": "2026-11-04T20:54:20.664486+00:00",
    "sha256": "74ccd4e0514bb1ea887699eef49c4b62218fb8265a00c398411e939a9e6bad4c",
    "bytes": 11303,
    "publisher": "Agencia Estatal Boletín Oficial del Estado / Ministerio para la Transición Ecológica y el Reto Demográfico",
    "title": "Anuncio de la Dependencia del Área de Industria y Energía de la Subdelegación del Gobierno en Salamanca, por el que se somete a información pública la solicitud de autorización administrativa previa (AAP) y autorización administrativa de construcción (AAC) del proyecto del módulo de almacenamiento de energía por baterías Sirius Solar de 19,99 MW de potencia instalada, y su infraestructura de evacuación, para su hibridación con la planta fotovoltaica Sirius Solar de 48,11 MW de potencia instalada, ubicado en el término municipal de Zamora, provincia de Zamora.",
    "publication_date": "2026-10-26",
    "document_version": "20261026071612",
    "locator": "XML texto/p numbered from0; technical characteristics and operative decision; paragraph map in research ledger",
    "license": "BOE general reuse conditions, Resolution27June2024; commercial/noncommercial reuse with attribution and no endorsement",
    "terms_url": "https://www.boe.es/informacion/aviso_legal/index.php",
    "terms_sha256": "744fcb66dc62e4d438e4b406d3e2efd829f74b855f8a685d1f6bf90e31429989",
    "attribution": "Basado en datos de la Agencia Estatal Boletín Oficial del Estado (https://www.boe.es). Adapted factual records; not official or endorsed."
  },
  "BOE-B-2026-35162": {
    "name": "BOE-B-2026-35162",
    "url": "https://www.boe.es/diario_boe/xml.php?id=BOE-B-2026-35162",
    "status": 200,
    "retrieved_at": "2026-11-04T20:54:24.507649+00:00",
    "sha256": "925a89641e514bba9ff00144c4dd0c32c199bf6608e0c7894f53975abeac4c8a",
    "bytes": 11016,
    "publisher": "Agencia Estatal Boletín Oficial del Estado / Ministerio para la Transición Ecológica y el Reto Demográfico",
    "title": "Anuncio de la Dependencia de Industria y Energía de la Subdelegación del Gobierno en Albacete, por el que se somete al trámite de Información Pública la Solicitud de Autorización Administrativa Previa y Autorización Administrativa de Construcción para la instalación de almacenamiento \"BESS Los Pedreros\", que incluye un sistema de baterías de 25,08 MW y un volante de inercia de 0,4 MW, para su hibridación con el parque eólico existente \"Los Pedreros\", de 49,95 MW, en el término municipal de Fuente-Álamo, en la provincia de Albacete, y para su infraestructura de evacuación, conformando una instalación híbrida de 55 MW de potencia instalada.",
    "publication_date": "2026-10-27",
    "document_version": "20261027071606",
    "locator": "XML texto/p numbered from0; technical characteristics and operative decision; paragraph map in research ledger",
    "license": "BOE general reuse conditions, Resolution27June2024; commercial/noncommercial reuse with attribution and no endorsement",
    "terms_url": "https://www.boe.es/informacion/aviso_legal/index.php",
    "terms_sha256": "744fcb66dc62e4d438e4b406d3e2efd829f74b855f8a685d1f6bf90e31429989",
    "attribution": "Basado en datos de la Agencia Estatal Boletín Oficial del Estado (https://www.boe.es). Adapted factual records; not official or endorsed."
  },
  "BOE-B-2026-35253": {
    "name": "BOE-B-2026-35253",
    "url": "https://www.boe.es/diario_boe/xml.php?id=BOE-B-2026-35253",
    "status": 200,
    "retrieved_at": "2026-11-04T20:54:28.775914+00:00",
    "sha256": "2ade3eb13a84afda8895d1c5467b2efa5f98f36d0dedbeabc0c8cb05e1e716b0",
    "bytes": 13540,
    "publisher": "Agencia Estatal Boletín Oficial del Estado / Ministerio para la Transición Ecológica y el Reto Demográfico",
    "title": "Anuncio de la Dependencia de Industria y Energía de la Subdelegación del Gobierno en Albacete, por el que se somete al trámite de Información Pública la Solicitud de Autorización Administrativa Previa y Autorización Administrativa de Construcción de los módulos de almacenamiento por baterías Elawan Ayora III Híbrido y Elawan Ayora IV Híbrido, de 18 MW de potencia instalada cada uno, junto a sus infraestructuras de evacuación, en el término municipal de Carcelén (Albacete), para hibridación, respectivamente, con la instalación solar fotovoltaica Elawan Ayora III, de 20,99 MW, y con la instalación solar fotovoltaica Elawan Ayora IV, de 20,99 MW, conformando sendas instalaciones híbridas de 38,99 MW de potencia instalada cada una.",
    "publication_date": "2026-10-28",
    "document_version": "20261028071616",
    "locator": "XML texto/p numbered from0; technical characteristics and operative decision; paragraph map in research ledger",
    "license": "BOE general reuse conditions, Resolution27June2024; commercial/noncommercial reuse with attribution and no endorsement",
    "terms_url": "https://www.boe.es/informacion/aviso_legal/index.php",
    "terms_sha256": "744fcb66dc62e4d438e4b406d3e2efd829f74b855f8a685d1f6bf90e31429989",
    "attribution": "Basado en datos de la Agencia Estatal Boletín Oficial del Estado (https://www.boe.es). Adapted factual records; not official or endorsed."
  },
  "BOE-B-2026-32445": {
    "name": "BOE-B-2026-32445",
    "url": "https://www.boe.es/diario_boe/xml.php?id=BOE-B-2026-32445",
    "status": 200,
    "retrieved_at": "2026-11-04T21:54:14.207779+00:00",
    "sha256": "fa59bfb3e902d7a926ee5130893629d9bd61decae05a580d33ffeb82ac6553ad",
    "bytes": 9280,
    "title": "Anuncio de la Dependencia de Industria y Energía de la Subdelegación del Gobierno en Granada por el que se somete a información pública las solicitudes de autorización administrativa previa y autorización administrativa de construcción para los proyectos de almacenamiento energético ALM Cimera Solar, ALM Alambor Solar y ALM Coracha Solar mediante baterías, sitas en el término municipal de Pinos Puente, en la provincia de Granada.",
    "publisher": "Agencia Estatal Boletín Oficial del Estado",
    "locator": "XML texto/p numbered from0; operative decision and technical paragraphs in review ledger",
    "license": "BOE general reuse conditions; attribution in licenses/BOE-NOTICE.md",
    "publication_date": "2026-10-06",
    "document_version": "20261006071603",
    "terms_url": "https://www.boe.es/informacion/aviso_legal/index.php",
    "terms_sha256": "744fcb66dc62e4d438e4b406d3e2efd829f74b855f8a685d1f6bf90e31429989"
  },
  "BOE-B-2026-32448": {
    "name": "BOE-B-2026-32448",
    "url": "https://www.boe.es/diario_boe/xml.php?id=BOE-B-2026-32448",
    "status": 200,
    "retrieved_at": "2026-11-04T21:54:17.279690+00:00",
    "sha256": "3fb155c54522d68f77ef752fe56e2e8b42076703e49a6ca84a7d6816f08e0ad4",
    "bytes": 7831,
    "title": "Anuncio del Área de Industria y Energía de la Subdelegación del Gobierno en Palencia por el que se somete a información pública la solicitud de declaración de impacto ambiental y autorización administrativa previa de la instalación híbrida \"Hibridación Cillamayor\" compuesta por un módulo de almacenamiento por baterías \"BESS Cillamayor\" de 25,4 MW y el parque fotovoltaico \"Cillamayor 49,90 MW\", de 49,90 MW de potencia instalada, y su infraestructura de evacuación, en los términos municipales de Aguilar de Campoo y Barruelo de Santullán, provincia de Palencia.",
    "publisher": "Agencia Estatal Boletín Oficial del Estado",
    "locator": "XML texto/p numbered from0; operative decision and technical paragraphs in review ledger",
    "license": "BOE general reuse conditions; attribution in licenses/BOE-NOTICE.md",
    "publication_date": "2026-10-06",
    "document_version": "20261006071603",
    "terms_url": "https://www.boe.es/informacion/aviso_legal/index.php",
    "terms_sha256": "744fcb66dc62e4d438e4b406d3e2efd829f74b855f8a685d1f6bf90e31429989"
  },
  "BOE-A-2026-21227": {
    "name": "BOE-A-2026-21227",
    "url": "https://www.boe.es/diario_boe/xml.php?id=BOE-A-2026-21227",
    "status": 200,
    "retrieved_at": "2026-11-04T21:54:27.084139+00:00",
    "sha256": "79b94f8c5c75c953a09952ce76077a89b8fc66b4b520564731c273b2175269de",
    "bytes": 21491,
    "title": "Resolución de 9 de septiembre de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Azor Solar, SLU, autorización administrativa previa para el proyecto de almacenamiento con baterías Azor Solar, de 68,51 MW de potencia instalada, y su infraestructura de evacuación, para su hibridación con la instalación solar fotovoltaica existente Azor Solar, de 64,02 MW de potencia instalada, en Paracuellos de Jarama (Madrid).",
    "publisher": "Agencia Estatal Boletín Oficial del Estado",
    "locator": "XML texto/p numbered from0; operative decision and technical paragraphs in review ledger",
    "license": "BOE general reuse conditions; attribution in licenses/BOE-NOTICE.md",
    "publication_date": "2026-10-12",
    "document_version": "20261012071523",
    "terms_url": "https://www.boe.es/informacion/aviso_legal/index.php",
    "terms_sha256": "744fcb66dc62e4d438e4b406d3e2efd829f74b855f8a685d1f6bf90e31429989"
  },
  "BOE-A-2026-21303": {
    "name": "BOE-A-2026-21303",
    "url": "https://www.boe.es/diario_boe/xml.php?id=BOE-A-2026-21303",
    "status": 200,
    "retrieved_at": "2026-11-04T21:54:30.659668+00:00",
    "sha256": "c05ddc5bb852cc95946e4e7019bbeb6f03b2b5917b6e6e214c340ba94c18d322",
    "bytes": 29005,
    "title": "Resolución de 9 de mayo de 2025, de la Dirección General de Política Energética y Minas, por la que se otorga a Naturgy Renovables, SLU, autorización administrativa previa y autorización administrativa de construcción del módulo de almacenamiento por baterías «BESS Tabernas II», de 19,8 MW de potencia instalada, y para su infraestructura de evacuación, para su hibridación con el parque solar fotovoltaico existente «Tabernas II», de 48,8 MW de potencia instalada, situada en Tabernas (Almería).",
    "publisher": "Agencia Estatal Boletín Oficial del Estado",
    "locator": "XML texto/p numbered from0; operative decision and technical paragraphs in review ledger",
    "license": "BOE general reuse conditions; attribution in licenses/BOE-NOTICE.md",
    "publication_date": "2026-10-13",
    "document_version": "20261013071559",
    "terms_url": "https://www.boe.es/informacion/aviso_legal/index.php",
    "terms_sha256": "744fcb66dc62e4d438e4b406d3e2efd829f74b855f8a685d1f6bf90e31429989"
  },
  "BOE-A-2026-21433": {
    "name": "BOE-A-2026-21433",
    "url": "https://www.boe.es/diario_boe/xml.php?id=BOE-A-2026-21433",
    "status": 200,
    "retrieved_at": "2026-11-04T21:54:33.963662+00:00",
    "sha256": "c3d95b9992519a2f390167687878019f62255d9dbe63f2a89c9a3e87571df268",
    "bytes": 27954,
    "title": "Resolución de 7 de septiembre de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Ictio Solar Auriga, SL, la autorización administrativa previa para el módulo de almacenamiento por baterías «ALM Ictio Alcázar II», de 19,96 MW de potencia instalada, y su infraestructura de evacuación, para su hibridación con la planta fotovoltaica existente, «FV Ictio Alcázar II», de 47,19 MW de potencia instalada, conformando una instalación de 67,15 MW de potencia instalada, en Alcázar de San Juan (Ciudad Real).",
    "publisher": "Agencia Estatal Boletín Oficial del Estado",
    "locator": "XML texto/p numbered from0; operative decision and technical paragraphs in review ledger",
    "license": "BOE general reuse conditions; attribution in licenses/BOE-NOTICE.md",
    "publication_date": "2026-10-14",
    "document_version": "20261014071610",
    "terms_url": "https://www.boe.es/informacion/aviso_legal/index.php",
    "terms_sha256": "744fcb66dc62e4d438e4b406d3e2efd829f74b855f8a685d1f6bf90e31429989"
  },
  "BOE-A-2026-21434": {
    "name": "BOE-A-2026-21434",
    "url": "https://www.boe.es/diario_boe/xml.php?id=BOE-A-2026-21434",
    "status": 200,
    "retrieved_at": "2026-11-04T21:54:37.991810+00:00",
    "sha256": "5b9b0fbf2f9bc97e1013cd819be3b248d6c2a78d334aae3866fdb5d0d2671377",
    "bytes": 28256,
    "title": "Resolución de 7 de septiembre de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Ictio Solar Berenice, SL, la autorización administrativa previa para el módulo de almacenamiento por baterías «ALM Ictio Alcázar III», de 19,96 MW de potencia instalada, y su infraestructura de evacuación, para su hibridación con la planta fotovoltaica existente, «FV Ictio Alcázar III», de 47,19 MW de potencia instalada, conformando una instalación de 67,15 MW de potencia instalada, en Alcázar de San Juan (Ciudad Real).",
    "publisher": "Agencia Estatal Boletín Oficial del Estado",
    "locator": "XML texto/p numbered from0; operative decision and technical paragraphs in review ledger",
    "license": "BOE general reuse conditions; attribution in licenses/BOE-NOTICE.md",
    "publication_date": "2026-10-14",
    "document_version": "20261014071610",
    "terms_url": "https://www.boe.es/informacion/aviso_legal/index.php",
    "terms_sha256": "744fcb66dc62e4d438e4b406d3e2efd829f74b855f8a685d1f6bf90e31429989"
  },
  "BOE-A-2026-21605": {
    "name": "BOE-A-2026-21605",
    "url": "https://www.boe.es/diario_boe/xml.php?id=BOE-A-2026-21605",
    "status": 200,
    "retrieved_at": "2026-11-04T21:54:44.243694+00:00",
    "sha256": "6423d9ee3922962cdd487c3696d47e565e5e889bf438280d11abca7aaad5d365",
    "bytes": 26020,
    "title": "Resolución de 14 de septiembre de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Khons Sun Power, SL, autorización administrativa previa y autorización administrativa de construcción para el proyecto de almacenamiento con baterías Tagus 2 HBESS, de 176,44 MW de potencia instalada, y su infraestructura de evacuación, para su hibridación con la planta fotovoltaica Tagus 2, de 224,4 MW de potencia instalada, ubicadas en Ocaña y Ontígola (Toledo).",
    "publisher": "Agencia Estatal Boletín Oficial del Estado",
    "locator": "XML texto/p numbered from0; operative decision and technical paragraphs in review ledger",
    "license": "BOE general reuse conditions; attribution in licenses/BOE-NOTICE.md",
    "publication_date": "2026-10-16",
    "document_version": "20261016071610",
    "terms_url": "https://www.boe.es/informacion/aviso_legal/index.php",
    "terms_sha256": "744fcb66dc62e4d438e4b406d3e2efd829f74b855f8a685d1f6bf90e31429989"
  },
  "BOE-B-2026-30746": {
    "name": "BOE-B-2026-30746",
    "url": "https://www.boe.es/diario_boe/xml.php?id=BOE-B-2026-30746",
    "status": 200,
    "retrieved_at": "2026-11-04T22:54:02.339742+00:00",
    "sha256": "3ca362e67f5301dc3b8e7596e8df16cde4782b4f1166fb3346e25ea169b5c3a0",
    "bytes": 13292,
    "title": "Anuncio de la Delegación Territorial de Economía, Hacienda, Fondos Europeos y de Universidad, Industria, Energía e Innovación en Sevilla, por el que se somete a información pública la petición realizada por la mercantil Green Ric Energy, s.l.u, por la que se solicita la modificación de la autorización administrativa previa y de construcción, así como la declaración en concreto de utilidad pública para la hibridación mediante almacenamiento con baterías BESS de la instalación de generación denominada \"HSF híbrida Greencar 3\", ubicada en el término municipal de Carmona (Sevilla). Exp. 280.523.",
    "publisher": "Agencia Estatal Boletín Oficial del Estado",
    "publication_date": "2026-09-23",
    "document_version": "20260923071606",
    "locator": "XML texto/p technical characteristics and application scope; zero-based paragraph indices in review ledger",
    "license": "BOE general reuse conditions; licenses/BOE-NOTICE.md",
    "terms_url": "https://www.boe.es/informacion/aviso_legal/index.php",
    "terms_sha256": "744fcb66dc62e4d438e4b406d3e2efd829f74b855f8a685d1f6bf90e31429989"
  },
  "BOE-B-2026-30931": {
    "name": "BOE-B-2026-30931",
    "url": "https://www.boe.es/diario_boe/xml.php?id=BOE-B-2026-30931",
    "status": 200,
    "retrieved_at": "2026-11-04T22:54:06.367716+00:00",
    "sha256": "0812079ae5dfb90b2799264c0c4c4236aa8f80725875615448fcb95e99e81d63",
    "bytes": 8694,
    "title": "Anuncio del Área de Industria y Energía de la Subdelegación del Gobierno en Palencia, por el que se somete a información pública la solicitud de procedimiento simplificado de autorización administrativa previa y autorización administrativa de construcción para el proyecto de Baterías «BESS Hibridación FV Virgen de Areños III», de 35 MW de potencia instalada, sito en el término municipal de Villota del Páramo, en la provincia de Palencia, para su hibridación con la Planta Solar FV Virgen de Areños III, de 44,6810 MW, y su infraestructura de evacuación.",
    "publisher": "Agencia Estatal Boletín Oficial del Estado",
    "publication_date": "2026-09-25",
    "document_version": "20260925071609",
    "locator": "XML texto/p technical characteristics and application scope; zero-based paragraph indices in review ledger",
    "license": "BOE general reuse conditions; licenses/BOE-NOTICE.md",
    "terms_url": "https://www.boe.es/informacion/aviso_legal/index.php",
    "terms_sha256": "744fcb66dc62e4d438e4b406d3e2efd829f74b855f8a685d1f6bf90e31429989"
  },
  "BOE-B-2026-29448": {
    "name": "BOE-B-2026-29448",
    "url": "https://www.boe.es/diario_boe/xml.php?id=BOE-B-2026-29448",
    "status": 200,
    "retrieved_at": "2026-11-04T23:57:13.475886+00:00",
    "sha256": "73c0e1d8bd60ec0065ef1940a58cca1f607a2f58cb4fe9de126249e5e38ccd83",
    "bytes": 7458,
    "title": "Anuncio del Área de Industria y Energía de la Subdelegación del Gobierno en Sevilla por el que se somete a información pública, la solicitud de autorización administrativa previa y autorización administrativa de construcción para el proyecto de Módulo de Almacenamiento de Energía por baterías \"BESS Rey III Solar\" de 35,12 MW de potencia instalada, para su hibridación con la planta solar fotovoltaica existente \"Rey III Solar\", en el término municipal de Carmona. PFOT-139-ALM.",
    "publisher": "Agencia Estatal Boletín Oficial del Estado",
    "publication_date": "2026-09-11",
    "document_version": "20260911071600",
    "locator": "XML texto/p technical characteristics; zero-based paragraph locators in review ledger",
    "license": "BOE general reuse conditions; licenses/BOE-NOTICE.md",
    "terms_url": "https://www.boe.es/informacion/aviso_legal/index.php",
    "terms_sha256": "744fcb66dc62e4d438e4b406d3e2efd829f74b855f8a685d1f6bf90e31429989"
  },
  "BOE-B-2026-30029": {
    "name": "BOE-B-2026-30029",
    "url": "https://www.boe.es/diario_boe/xml.php?id=BOE-B-2026-30029",
    "status": 200,
    "retrieved_at": "2026-11-04T23:57:16.707750+00:00",
    "sha256": "099ba7755b9b9617385165310b3604f0ed1de15fecdd0b0dbcc70892deeee0cf",
    "bytes": 9560,
    "title": "Anuncio del Área de Industria y Energía de la Delegación del Gobierno en Huelva por el que se somete a información pública, la solicitud de autorización administrativa previa y autorización administrativa de construcción para el proyecto del módulo de almacenamiento por baterías \"BESS FV La Puebla 3\", de 150,8 MW de potencia instalada para su hibridación con el parque solar fotovoltaico La Puebla 3 y su infraestructura de evacuación, Término Municipal de Cerro de Andévalo, en la provincia de Huelva. PFOT-ALM-1154.",
    "publisher": "Agencia Estatal Boletín Oficial del Estado",
    "publication_date": "2026-09-16",
    "document_version": "20260916071557",
    "locator": "XML texto/p technical characteristics; zero-based paragraph locators in review ledger",
    "license": "BOE general reuse conditions; licenses/BOE-NOTICE.md",
    "terms_url": "https://www.boe.es/informacion/aviso_legal/index.php",
    "terms_sha256": "744fcb66dc62e4d438e4b406d3e2efd829f74b855f8a685d1f6bf90e31429989"
  },
  "BOE-B-2026-30099": {
    "name": "BOE-B-2026-30099",
    "url": "https://www.boe.es/diario_boe/xml.php?id=BOE-B-2026-30099",
    "status": 200,
    "retrieved_at": "2026-11-04T23:57:20.555751+00:00",
    "sha256": "5b7fc813b0095cd1faa0f8aed25543a5aa21503430392ba4b7a970d808b17e24",
    "bytes": 7770,
    "title": "Anuncio del Área de Industria y Energía de la Subdelegación del Gobierno en Valladolid por el que se somete a información pública la solicitud de procedimiento simplificado de autorización administrativa previa y autorización administrativa de construcción del módulo de almacenamiento de energía por baterías Solaria-Tordesillas II de 19,993 MW, para su hibridación con la instalación fotovoltaica Solaria-Tordesillas II, de 49,969 MW, y su infraestructura de evacuación, en Valladolid.",
    "publisher": "Agencia Estatal Boletín Oficial del Estado",
    "publication_date": "2026-09-17",
    "document_version": "20260917071634",
    "locator": "XML texto/p technical characteristics; zero-based paragraph locators in review ledger",
    "license": "BOE general reuse conditions; licenses/BOE-NOTICE.md",
    "terms_url": "https://www.boe.es/informacion/aviso_legal/index.php",
    "terms_sha256": "744fcb66dc62e4d438e4b406d3e2efd829f74b855f8a685d1f6bf90e31429989"
  },
  "BOE-A-2026-19474": {
    "name": "BOE-A-2026-19474",
    "url": "https://www.boe.es/diario_boe/xml.php?id=BOE-A-2026-19474",
    "status": 200,
    "retrieved_at": "2026-11-04T23:57:24.152663+00:00",
    "sha256": "324a9e636b7541c96a2870a41de9c8fab13d1415e35486b906635941caa16d9a",
    "bytes": 72083,
    "title": "Resolución de 7 de septiembre de 2026, de la Dirección General de Calidad y Evaluación Ambiental, por la que se formula informe de impacto ambiental del proyecto «Infraestructura de almacenamiento con baterías “Hibridación Larral”, para su hibridación con el parque fotovoltaico existente Larral, y su infraestructura de evacuación, en la provincia de Zaragoza».",
    "publisher": "Agencia Estatal Boletín Oficial del Estado",
    "publication_date": "2026-09-18",
    "document_version": "20260918071605",
    "locator": "XML texto/p technical characteristics; zero-based paragraph locators in review ledger",
    "license": "BOE general reuse conditions; licenses/BOE-NOTICE.md",
    "terms_url": "https://www.boe.es/informacion/aviso_legal/index.php",
    "terms_sha256": "744fcb66dc62e4d438e4b406d3e2efd829f74b855f8a685d1f6bf90e31429989"
  },
  "nampower_lithops_portfolio_20261105": {
    "url": "https://www.nampower.com.na/Projects",
    "status": 200,
    "retrieved_at": "2026-11-05T00:57:16.994087+00:00",
    "sha256": "abd7f98fd0b92e41d78d431e8deab1c4198c53892c3e7fe214ad45be8e6a1ed8",
    "bytes": 54371,
    "publisher": "NamPower",
    "title": "Generation projects: Lithops BESS",
    "publication_date": null,
    "locator": "Generation Projects section5: procurement/COD paragraph and TOTAL PROJECT ESTIMATE",
    "license": "Copyright retained; no open bulk licence asserted. Bounded attributed factual observations; original HTML outside Git.",
    "terms_url": "https://www.nampower.com.na/Projects",
    "access_method": "Public original HTML manually reviewed; no registration"
  },
  "nampower_lithops_owner_engineer_award_20261105": {
    "url": "https://www.nampower.com.na/Media/Document/165c41d9-93ae-46de-8a1f-4a9d133bb25f.pdf",
    "publisher": "Namibia Power Corporation (Pty) Ltd",
    "title": "Contract Award Notice: Owner Engineer for Lithops BESS, NA-NAMPOWER-485013-CS-QCBS",
    "retrieved_at": "2026-11-05T08:51:42.906993+00:00",
    "publication_date": null,
    "sha256": "dc7d1186c412fe879640e010b0919d611dbbe61de292cdac5575664f5e1ed0e5",
    "locator": "PDF pages1 and3; successful consultant, contract price and duration; page5 award-notification date",
    "license": "NamPower public procurement disclosure; copyright retained; bounded factual contract metadata, no open bulk licence asserted. No personal ownership/signature/contact data reproduced.",
    "access_method": "Public replacement PDF linked by current Bid Awards register; old public/docs URL404",
    "document_date_note": "Notice has no publication date; attached disclosure refers to award notification10February2026. Filename date not assumed as publication."
  },
  "ceb_annual_20261105": {
    "url": "https://ceb.mu/docs/files/files/publications/Annual%20Report/CEB%20ANNUAL%20REPORT%202024-2025.pdf",
    "publisher": "Central Electricity Board",
    "title": "Annual Report2024/2025 – Embracing Energy Efficiency",
    "retrieved_at": "2026-11-05T11:53:59.815796+00:00",
    "publication_date": null,
    "document_revision": "2024/2025 reporting year",
    "sha256": "532784ef6873c9ab593b41fdbd0631d614a9cf5c521a43c1d21c5a409242478d",
    "locator": "PDF70/printed68 andPDF100/printed98: L’Avenir/two20MW60MWh BESS procurement",
    "access_method": "Original public HTTP download; local PDF layout text and visual review",
    "license": "Copyright retained by publisher; bounded factual specification/project observations with attribution. No open bulk-reuse licence asserted; original documents not redistributed."
  },
  "mu_psip_20261105": {
    "url": "https://nationalbudget2026.govmu.org/documents/2026_27_PSIP.pdf",
    "publisher": "Mauritius Ministry of Finance",
    "title": "Public Sector Investment Programme2026-2027 to2030-2031",
    "retrieved_at": "2026-11-05T11:52:30.390140+00:00",
    "publication_date": null,
    "document_revision": "2026-2027 to2030-2031",
    "sha256": "ed1a4283a2256dcca527b14c9f1cb8e1729fafe7a8f6ae6aca07acb50dd0795c",
    "locator": "PDF161/printed137: C1199 andC1332; Rs million",
    "access_method": "Original public HTTP download; local PDF layout text and visual review",
    "license": "Copyright retained by publisher; bounded factual specification/project observations with attribution. No open bulk-reuse licence asserted; original documents not redistributed."
  },
  "ceb_rodrigues_cpb22_2025": {
    "url": "https://www.tcil.net.in/tender/pdf/25H221_2.pdf",
    "publisher": "Central Electricity Board (official tender copy hosted by TCIL)",
    "title": "Design, Manufacture, Supply, Installation, Testing and Commissioning of 2 x 1MW / 2MWh Battery Energy Storage Systems for Rodrigues Island",
    "publication_date": "2025-08-11",
    "document_revision": "CPB/22/2025; CEB/IFB/2025/9690",
    "retrieved_at": "2026-11-05T12:52:33.941368+00:00",
    "sha256": "4319875fc73c53c932c9a39ed363d868e37967da4b1bd9e55b1211b1d18e512c",
    "locator": "PDF 102, 134–136; sections 1.0, 2.4.1 and 2.4.2(h)",
    "license": "Publisher copyright retained. Bounded factual procurement observations, not bulk republication or an open reuse licence. Original PDF retained outside Git."
  },
  "tab_project_20261105": {
    "url": "https://www.tab.si/2026/05/28/tab-commissions-bess-2/",
    "final_url": "https://www.tab.si/2026/05/28/tab-commissions-bess-2/",
    "retrieved_at": "2026-11-05T14:00:25.464776+00:00",
    "sha256": "449a7b21f703ecbc40e6b8b1ef647dfad5a0f22c98970695de913ec0d15b3bae",
    "status": 200,
    "publisher": "TAB d.d.",
    "title": "TAB commissions BESS for Neoenergija",
    "publication_date": "2026-05-28",
    "locator": "Commissioning, project technology and multi-market operation paragraphs",
    "license": "Publisher copyright retained. Bounded factual project observations; no open bulk-reuse licence asserted; original HTML outside Git."
  },
  "prevalje_tab_20261105": {
    "url": "https://www.tab.si/sl/2025/07/10/tab-commissions-bess/",
    "retrieved_at": "2026-11-05T14:03:02.449052+00:00",
    "sha256": "27eda8433abcbbf1c5e9d2f874d8d525db89bafd3d6fbbbfcb16818524dac64d",
    "status": 200,
    "publisher": "TAB d.d.",
    "title": "TAB commissions BESS in Prevalje",
    "publication_date": "2025-07-10",
    "locator": "Opening and planned HSE operation paragraphs",
    "license": "Publisher copyright retained. Bounded factual project observations; no open bulk-reuse licence asserted; original HTML outside Git."
  },
  "prevalje_hse_20261105": {
    "url": "https://www.hse.si/en/hse-to-take-over-the-management-of-an-advanced-battery-energy-storage-system-set-up-by-tab-in-prevalje/",
    "retrieved_at": "2026-11-05T14:03:00.599502+00:00",
    "sha256": "a47a9d9cbd67a088f0f15bdbc9d6e6106c14072714ee7a2f634afa1f10208834",
    "status": 200,
    "publisher": "HSE",
    "title": "HSE to take over management of TAB Prevalje BESS",
    "publication_date": "2025-07-11",
    "locator": "Opening and management paragraphs",
    "license": "Publisher copyright retained. Bounded factual project observations; no open bulk-reuse licence asserted; original HTML outside Git."
  },
  "cushaling_2023_20261105": {
    "url": "https://www.statkraft.ie/news/2023/cushaling-bess/",
    "retrieved_at": "2026-11-05T14:03:00.821431+00:00",
    "sha256": "941d2a9eec469ee49045d38efd012e02d0d3d47504885325f11841c4a5fcab86",
    "status": 200,
    "publisher": "Statkraft",
    "title": "Statkraft to build Ireland’s first 4-hour battery energy storage system",
    "publication_date": "2023-09-21",
    "locator": "20MW design and Fluence supply; final paragraph other two batteries delivered by Fluence",
    "license": "Publisher copyright retained. Bounded factual project observations; no open bulk-reuse licence asserted; original HTML outside Git."
  },
  "saules_report_20261105": {
    "url": "https://www.saulesbess.com/__l5e/assets-v1/6ed5d2b5-63cb-4966-9454-5d1b6a18bb22/Saules_BESS_Q2_2026_Bondholder_Report.pdf",
    "retrieved_at": "2026-11-05T14:33:15.367396+00:00",
    "status": 200,
    "sha256": "0d1394073386c027fb1acdbb1df84f8c51c9f8046fb1976c5fc3fcf5aae119f0",
    "publisher": "Saules BESS SIA",
    "title": "Saules BESS SIA Second Quarter 2026 Results",
    "publication_date": "2026-08",
    "locator": "PDF pp2–4 executive summary and issuer/project table",
    "license": "Public issuer publication; copyright retained, no open bulk licence asserted. Bounded reviewed factual observations only. Offering-memorandum restrictions concern securities offers/distribution; no full document reproduced. Raw bytes outside Git."
  },
  "saules_memo_20261105": {
    "url": "https://www.saulesbess.com/__l5e/assets-v1/d5571e71-44bc-45b2-9192-b1c0ad296745/Saules-BESS-secured-notes-Offering-Memorandum.pdf",
    "retrieved_at": "2026-11-05T14:33:19.683791+00:00",
    "status": 200,
    "sha256": "9f2ca0511e3bf158717f2164dd840edf8aa3ec67d1c44b6eeeafa1a38888af00",
    "publisher": "Saules BESS SIA",
    "title": "SIA Saules BESS Offering Memorandum — senior secured notes",
    "publication_date": "2026-06-09",
    "locator": "PDF p23 BESS Projects definition; pp28–29 Material Agreements; pp76–79 business/project overview",
    "license": "Public issuer publication; copyright retained, no open bulk licence asserted. Bounded reviewed factual observations only. Offering-memorandum restrictions concern securities offers/distribution; no full document reproduced. Raw bytes outside Git."
  },
  "nasdaq_20261105": {
    "url": "https://view.news.eu.nasdaq.com/view?id=ba65b1db816d06d06b7bb5711044729fe&lang=en&src=listed",
    "retrieved_at": "2026-11-05T14:39:11.572810+00:00",
    "status": 200,
    "sha256": "7004a0843740c27a46ec5b35a06c0cb74def1d190c7d112cb385ece3999d83fd",
    "publisher": "Saules BESS SIA",
    "title": "Saules BESS publishes unaudited financial report for 6 months of 2026",
    "publication_date": "2026-08-28",
    "locator": "Issuer announcement: quarterly highlights and Outlook",
    "license": "Public issuer publication; copyright retained, no open bulk licence asserted. Bounded reviewed factual observations only. Offering-memorandum restrictions concern securities offers/distribution; no full document reproduced. Raw bytes outside Git."
  },
  "saules_20261105": {
    "url": "https://www.saulesbess.com/",
    "retrieved_at": "2026-11-05T14:29:50.529007+00:00",
    "status": 200,
    "sha256": "8cb21dca64918d5302457833ad30253e8d760d2427e0b32ba81cf38f4928a0f9",
    "publisher": "Saules BESS SIA",
    "title": "Saules BESS investor relations",
    "publication_date": null,
    "locator": "Overview portfolio and capex; Q2 report link",
    "license": "Public issuer publication; copyright retained, no open bulk licence asserted. Bounded reviewed factual observations only. Offering-memorandum restrictions concern securities offers/distribution; no full document reproduced. Raw bytes outside Git."
  },
  "afdb_eskom_esmf_2018_20261105": {
    "url": "https://www.afdb.org/sites/default/files/documents/environmental-and-social-assessments/south_africa_-_eskom_distributed_battery_storage_program_-_esmf_summary.pdf",
    "final_url": "https://www.afdb.org/sites/default/files/documents/environmental-and-social-assessments/south_africa_-_eskom_distributed_battery_storage_program_-_esmf_summary.pdf",
    "retrieved_at": "2026-11-05T15:11:34.508227+00:00",
    "status": 200,
    "sha256": "f5afa8e4d608eae04abbc98cf825844e091da367cb3fecef206bcefd0449c166",
    "bytes": 669780,
    "publisher": "African Development Bank",
    "title": "Eskom Distributed Battery Storage Program — Environmental and Social Management Framework Summary",
    "publication_date": "2018-10",
    "locator": "PDF pp1–2 scope/date; pp11–12 site geography; p12 Rietfontein/Andriesvale and Melkhout",
    "license": "Public lender project document; bounded attributed factual observations, no open bulk-reuse licence asserted. No full document redistributed.",
    "access_method": "downloaded_pdf_text"
  },
  "wb_eskom_p04_20220815_20261105": {
    "url": "https://documents1.worldbank.org/curated/en/099720008152236566/pdf/P122329079c6420260a1700c0af02972520.pdf",
    "final_url": "https://documents1.worldbank.org/curated/en/099720008152236566/pdf/P122329079c6420260a1700c0af02972520.pdf",
    "retrieved_at": "2026-11-05T15:13:33.807910+00:00",
    "status": 200,
    "sha256": "312f6b80c89817316e160f5630163b16b0fef5518ea2a1a4c33179fa84bf8a63",
    "bytes": 127683,
    "publisher": "World Bank",
    "title": "South Africa Eskom Renewables Support Project P122329 — revised procurement plan",
    "publication_date": "2022-08-15",
    "locator": "PDF p3 Goods row ZA-ESKOM-298241-CW-RFB / P04, Lots A/B",
    "license": "Public lender project document; bounded attributed factual observations, no open bulk-reuse licence asserted. No full document redistributed.",
    "access_method": "downloaded_pdf_text"
  },
  "tpl_contract_216_20261105": {
    "url": "https://tongapower.to/node/216",
    "publisher": "Tonga Power Limited",
    "title": "TREP-01 contract status table",
    "retrieved_at": "2026-11-05T18:01:15.822346+00:00",
    "sha256": null,
    "access_method": "primary_page_search_index",
    "document_revision": "Undated owner contract table indexed October/November2026; page date not inferred from crawl",
    "locator": "Title, procurement and contract summary table; named minigrid sites in title",
    "license": "Tonga Power Limited copyright, all rights reserved. Bounded factual observations only; no bulk reuse licence asserted. Direct reader timeout/502; original bytes unavailable. No copied full prose or personal details."
  },
  "tpl_contract_217_20261105": {
    "url": "https://tongapower.to/node/217",
    "publisher": "Tonga Power Limited",
    "title": "TREP-02 contract status table",
    "retrieved_at": "2026-11-05T18:01:15.822346+00:00",
    "sha256": null,
    "access_method": "primary_page_search_index",
    "document_revision": "Undated owner contract table indexed October/November2026; page date not inferred from crawl",
    "locator": "Title, procurement and contract summary table; named minigrid sites in title",
    "license": "Tonga Power Limited copyright, all rights reserved. Bounded factual observations only; no bulk reuse licence asserted. Direct reader timeout/502; original bytes unavailable. No copied full prose or personal details."
  },
  "tpl_contract_219_20261105": {
    "url": "https://tongapower.to/node/219",
    "publisher": "Tonga Power Limited",
    "title": "TREP-03 Lot 2 contract status table",
    "retrieved_at": "2026-11-05T18:01:15.822346+00:00",
    "sha256": null,
    "access_method": "primary_page_search_index",
    "document_revision": "Undated owner contract table indexed October/November2026; page date not inferred from crawl",
    "locator": "Title, procurement and contract summary table; named minigrid sites in title",
    "license": "Tonga Power Limited copyright, all rights reserved. Bounded factual observations only; no bulk reuse licence asserted. Direct reader timeout/502; original bytes unavailable. No copied full prose or personal details."
  },
  "tpl_contract_220_20261105": {
    "url": "https://tongapower.to/node/220",
    "publisher": "Tonga Power Limited",
    "title": "TREP-12 contract status table",
    "retrieved_at": "2026-11-05T18:01:15.822346+00:00",
    "sha256": null,
    "access_method": "primary_page_search_index",
    "document_revision": "Undated owner contract table indexed October/November2026; page date not inferred from crawl",
    "locator": "Title, procurement and contract summary table; named minigrid sites in title",
    "license": "Tonga Power Limited copyright, all rights reserved. Bounded factual observations only; no bulk reuse licence asserted. Direct reader timeout/502; original bytes unavailable. No copied full prose or personal details."
  },
  "bba_kenya_installations_20251022": {
    "url": "https://batterybankafrica.com/expanding-battery-bank-africa-first-installations-in-kenya/",
    "status": 200,
    "sha256": "7667a065e7191435ea6a309ca7d1e11dfc65a1af2b9df38d2cfe4630bc1b1faf",
    "retrieved_at": "2026-11-05T19:53:17.709214+00:00",
    "publisher": "Battery Bank Africa / Vittoria Technology",
    "title": "Expanding Battery Bank Africa: First Installations in Kenya",
    "publication_date": "2025-10-22",
    "locator": "Opening named sites paragraph and attributed operator account",
    "license": "Copyright retained. Footer and privacy policy reviewed; bounded factual observations, no open bulk licence or full prose/photo redistribution."
  },
  "dee_bw3_received_20241128": {
    "url": "https://www.dee.gov.za/wp-content/uploads/2026/09/BESSS-BW3-Bids-Received-on-28November2024.pdf",
    "retrieved_at": "2026-11-05T20:57:54.310511+00:00",
    "sha256": "db9f17d9f96ee006c121ff152768458074923371fa882e0301fe27177183fdf6",
    "bytes": 42910,
    "status": 200,
    "publisher": "South Africa Department of Electricity and Energy",
    "title": "BESIPPPP Bid Window 3 — bids received on 28 November 2024",
    "publication_date": "2024-11-28",
    "locator": "PDF page 1; rows 3,11,14,26,30",
    "license": "Official procurement factual observations; public footer reserves rights; no open bulk licence asserted. Five reviewed identity/procurement observations only, no document/artwork redistribution.",
    "document_revision": "Tender DMRE/022/2023/24; reporting date 28 November 2024"
  },
  "adb_pacific_hybrid_202208": {
    "url": "https://www.adb.org/sites/default/files/publication/815361/hybrid-battery-energy-storage-systems.pdf",
    "retrieved_at": "2026-11-05T22:56:35.451432+00:00",
    "sha256": "5614a02761b3f0b0bd64a8c34e651b66c1439607237b97957e9ddf5efdc1efc5",
    "bytes": 4079604,
    "status": 200,
    "publisher": "Asian Development Bank",
    "title": "Hybrid and Battery Energy Storage Systems: Review and Recommendations for Pacific Island Projects",
    "publication_date": "2022-08",
    "document_revision": "TCS220320-2; DOI 10.22617/TCS220320-2",
    "license": "CC BY 3.0 IGO, author-attributed factual tables; third-party photographs excluded",
    "license_url": "https://creativecommons.org/licenses/by/3.0/igo/",
    "locator": "PDF pp29–30 Table3.1 Haapai; p39 Table3.3 four Cook Islands and footnote a",
    "access_method": "Original public PDF download; local pdftotext -layout plus visual verification",
    "related_source_id": "sprep_tonga_bess_case_table",
    "relationship": "Same ADB publication as earlier SPREP mirror, now original bytes and separate reviewed partitions; not independent corroboration."
  },
  "mpower_rarotonga_20261105": {
    "url": "https://www.mpower.com.au/rarotonga",
    "retrieved_at": "2026-11-05T23:56:32.855387+00:00",
    "sha256": "ce2698a0e731ae65f379cd65f006e0317cb685db7fbe0c0b30d475e4bcf203fc",
    "bytes": 744769,
    "status": 200,
    "publisher": "MPower",
    "title": "Rarotonga BESS",
    "document_revision": "Undated case study",
    "license": "Copyright reserved; footer/privacy reviewed. Bounded factual extraction only, no open bulk licence asserted; original HTML not redistributed.",
    "locator": "About the Rarotonga BESS; three specification bullets; project/customer headings"
  },
  "dcceew_community_locations_20261012": {
    "url": "https://www.dcceew.gov.au/energy/renewable/community-batteries",
    "publisher": "Australian Government Department of Climate Change, Energy, the Environment and Water",
    "title": "Community Batteries for Household Solar program — Business Grants Hub streams 1 & 2",
    "publication_date": "2026-10-12",
    "document_revision": "Last updated 12 October 2026; 57 displayed table rows, narrative states58 locations",
    "retrieved_at": "2026-11-06T00:58:35.866108+00:00",
    "license": "CC BY 4.0 except specified third-party materials; no third-party limitation marked on government factual tables. Logos and images excluded.",
    "license_url": "https://www.dcceew.gov.au/about/copyright",
    "access_method": "Public web-reader text, re-opened 6 November2026. Direct original HTTP download returned503; no original-HTML checksum claimed.",
    "reader_export_sha256": "a8f9ba4a55799a4aa3959fbbb5128b446b8210f432c57957cf3e5d55e075a73e",
    "reader_export_bytes": 9527,
    "locator": "Business Grants Hub streams 1 & 2; seven state/territory tables; exact applicant/location row per record",
    "attribution": "Department of Climate Change, Energy, the Environment and Water. 2026. Community Batteries for Household Solar program. https://www.dcceew.gov.au/energy/renewable/community-batteries"
  },
  "sa_minister_pmg_4150_20260919": {
    "url": "https://pmg.org.za/files/RNW4150-2026-09-21.docx",
    "retrieved_at": "2026-11-06T02:02:38.779947+00:00",
    "sha256": "c42ab2a2f69b6bae95086a318b70d857e8183bc86879badfe391396f70acab5d",
    "bytes": 39639,
    "status": 200,
    "publisher": "Ministry of Electricity and Energy, Republic of South Africa; hosted by Parliamentary Monitoring Group",
    "title": "National Assembly written reply 4150: Eskom Green and BESS Phase 1 delivery",
    "publication_date": "2026-09-21",
    "document_date": "2026-09-19",
    "document_revision": "Signed 19 September 2026; Question4150 / NW4421E as printed",
    "locator": "DOCX REPLY, part1: Eskom Green paragraph and Phase1 completion list",
    "landing_page": "https://pmg.org.za/committee-question/40977/",
    "license": "CC BY 3.0 South Africa, PMG published content policy. Numerical facts extracted, narrative paraphrased. Attribution: Parliamentary Monitoring Group, www.pmg.org.za.",
    "license_url": "https://creativecommons.org/licenses/by/3.0/za/",
    "terms_review_url": "https://pmg.org.za/page/disclaimer-copyright",
    "access_method": "Original ministerial DOCX downloaded from PMG; original reply checked against public question page."
  },
  "govza_besipppp_bw3_services_20261106": {
    "url": "https://www.gov.za/news/media-statements/minister-kgosientsho-ramokgopa-battery-energy-storage-independent-power",
    "retrieved_at": "2026-11-06T02:54:37.342386+00:00",
    "sha256": "500bccc2831acbccb6f31367da9e17547cadb31706c34ab38b280ac697758107",
    "bytes": 56980,
    "status": 200,
    "publisher": "South African Government / Department of Electricity and Energy",
    "title": "BESIPPPP Bid Window3 preferred bidders and required ancillary services",
    "published_date": "2025-05-30",
    "locator": "Programme ancillary requirements list immediately before five-project preferred-bidder table",
    "license": "GCIS terms1.1 permits non-commercial informational/reference use and distribution. Copyright retained; no open commercial/bulk licence asserted. Only bounded attributed service facts, no full page or expressive prose redistributed.",
    "terms_url": "https://www.gov.za/terms-and-conditions-use-0",
    "access_method": "Original public HTML, downloaded and checksummed; complete five-name table reconciled against canonical records."
  },
  "kosovo_mca_20261106": {
    "url": "https://www.mcakosovo.org/the-procurement-of-the-battery-energy-systems-in-its-final-phase/",
    "retrieved_at": "2026-11-06T03:00:33.503872+00:00",
    "sha256": "be76c05534d5ce57a779eb5aab6869404756559f0b9e6d7c5bce44d527c7f6e6",
    "bytes": 63338,
    "status": 200,
    "publisher": "MCA-Kosovo",
    "title": "The procurement of the Battery Energy Systems in its final phase",
    "publication_date": "2026-10-01",
    "locator": "Paragraphs on site split, procurement and proposed services",
    "license": "Copyright respective publisher retained. Limited attributed factual extraction for two named sites only; no open bulk licence asserted and no full pages, pictures, personal contacts or meeting credentials redistributed.",
    "terms_assessment": "MCA footer-linked privacy policy concerns personal data and gives no bulk licence; government page copyright reserved. Small site-specific factual review, no portfolio scraping.",
    "terms_review_url": "https://www.mcakosovo.org/privacy-policy/",
    "access_method": "Original public HTML bytes checked and hashed. Albanian and English hearing capacities agree."
  },
  "kosovo_ministry_20261106": {
    "url": "https://me.rks-gov.net/en/blog/two-american-companies-have-submitted-bids-for-the-design-and-construction-of-batteries/",
    "retrieved_at": "2026-11-06T03:00:47.048959+00:00",
    "sha256": "70ec32789aa92c49c39c37d13547159a82eeac954d4ff65b83a4caf82ec135c7",
    "bytes": 172870,
    "status": 200,
    "publisher": "Kosovo Ministry of Economy",
    "title": "Two American companies have submitted bids for the design and construction of batteries",
    "publication_date": "2026-10-01",
    "locator": "Opening dated paragraph and Istog/Ferizaj battery statement",
    "license": "Copyright respective publisher retained. Limited attributed factual extraction for two named sites only; no open bulk licence asserted and no full pages, pictures, personal contacts or meeting credentials redistributed.",
    "terms_assessment": "MCA footer-linked privacy policy concerns personal data and gives no bulk licence; government page copyright reserved. Small site-specific factual review, no portfolio scraping.",
    "terms_review_url": "https://www.mcakosovo.org/privacy-policy/",
    "access_method": "Original public HTML bytes checked and hashed. Albanian and English hearing capacities agree."
  },
  "kosovo_hearing_20261106": {
    "url": "https://www.mcakosovo.org/public-hearing/",
    "retrieved_at": "2026-11-06T03:01:50.164251+00:00",
    "sha256": "5b63dad15f1e8616bba7e56719459d589d9ac945abbfe5161fe2736c236a018e",
    "bytes": 69657,
    "status": 200,
    "publisher": "MCA-Kosovo / KOSTT",
    "title": "Public Hearing: Sojevë battery energy storage system",
    "publication_date": null,
    "locator": "English and Albanian public-hearing paragraphs, 45MW/90MWh in Sojevë, Ferizaj",
    "license": "Copyright respective publisher retained. Limited attributed factual extraction for two named sites only; no open bulk licence asserted and no full pages, pictures, personal contacts or meeting credentials redistributed.",
    "terms_assessment": "MCA footer-linked privacy policy concerns personal data and gives no bulk licence; government page copyright reserved. Small site-specific factual review, no portfolio scraping.",
    "terms_review_url": "https://www.mcakosovo.org/privacy-policy/",
    "access_method": "Original public HTML bytes checked and hashed. Albanian and English hearing capacities agree."
  },
  "kosovo_pm_20261014": {
    "url": "https://kryeministri.rks-gov.net/en/news/kryeministri-kurti-mori-pjese-ne-mbledhjen-e-pare-te-bordit-te-korporates-se-ruajtjes-se-energjise/",
    "publisher": "Office of the Prime Minister, Republic of Kosovo",
    "title": "Prime Minister Kurti Attends the First Meeting of the Board of the Energy Storage Corporation",
    "publication_date": "2026-10-14",
    "retrieved_at": "2026-11-06T03:02:45.628703+00:00",
    "locator": "Full speech paragraph beginning ESC will own and operate the batteries in Istog",
    "license": "Copyright Republic of Kosovo; bounded attributed capacity and planned-owner facts from public speech, no prose or images redistributed and no open bulk licence claimed.",
    "access_method": "Public primary web reader. Direct original-byte request returned403; no checksum of original bytes claimed."
  },
  "kosovo_land_20261106": {
    "url": "https://www.mcakosovo.org/ministry-of-economy-the-municipality-of-ferizaj-and-kostt-signed-the-transfer-of-land-ownership-for-the-mcc-kosov/",
    "sha256": "c38537aff42d5a2b815032bea166ca3dd50ede7146494dea6cd157a9eed4b26a",
    "retrieved_at": "2026-11-06T03:57:00.203372+00:00",
    "bytes": 63413,
    "publisher": "MCA-Kosovo",
    "title": "Land transfer from Ferizaj municipality to KOSTT",
    "publication_date": "2026-01-19",
    "locator": "Article dated heading and site-specific paragraphs",
    "license": "Copyright MCA-Kosovo. Bounded attributed site facts only; no full prose, pictures or private contacts redistributed, no open bulk licence asserted.",
    "terms_review_url": "https://www.mcakosovo.org/privacy-policy/",
    "terms_assessment": "Privacy policy is not a reuse licence; no US public-domain inference."
  },
  "kosovo_board_20261106": {
    "url": "https://www.mcakosovo.org/energy-for-the-hours-we-need-it-most-board-of-the-energy-storage-corporation-escorp-constituted/",
    "sha256": "55665afe8744e6e65904732429742ec2eaea4be06823b59edfa60cf679f1e44c",
    "retrieved_at": "2026-11-06T03:57:06.817947+00:00",
    "bytes": 65435,
    "publisher": "MCA-Kosovo",
    "title": "ESCorp board constituted and site roles",
    "publication_date": "2026-10-15",
    "locator": "Article dated heading and site-specific paragraphs",
    "license": "Copyright MCA-Kosovo. Bounded attributed site facts only; no full prose, pictures or private contacts redistributed, no open bulk licence asserted.",
    "terms_review_url": "https://www.mcakosovo.org/privacy-policy/",
    "terms_assessment": "Privacy policy is not a reuse licence; no US public-domain inference."
  },
  "kosovo_portfolio_20240924": {
    "url": "https://www.mcakosovo.org/wp-content/uploads/2025/08/Kosovo-Preparing-for-Future-Growth-1.pdf",
    "retrieved_at": "2026-11-06T04:02:10.978183+00:00",
    "sha256": "389133da08660c8c221c871ca3347666ae3bfb6be747bd751c8cfaf8bd16cfd6",
    "bytes": 948369,
    "publisher": "MCA-Kosovo",
    "title": "Kosovo: Preparing for Future Growth — Central and Eastern Europe Energy Storage Summit",
    "publication_date": "2024-09-24",
    "locator": "Cover date; PDF pp12–13 two exact site tables",
    "license": "Copyright publisher retained; bounded factual two-site design observations only, no full slide text/layouts or images redistributed; no open bulk licence asserted.",
    "access_method": "Original primary PDF downloaded; printed cover date takes precedence over upload directory and stale search metadata."
  },
  "ee_anyksciai_20261106": {
    "access_method": "original HTTP download",
    "bytes": 73062,
    "http_status": 200,
    "license": "Copyright retained. Limited attributed project facts, no full prose/images/private contacts redistributed; no open bulk reuse licence asserted.",
    "locator": "Dated article and named project paragraphs",
    "publication_date": "2026-10-06",
    "publisher": "European Energy",
    "retrieved_at": "2026-11-06T05:00:48.178971+00:00",
    "sha256": "16801e6fd7b1ea295013d59221859c9e37e0eba683f6694947606f7df7a6ca34",
    "terms_assessment": "Publisher copyright/footer and accessible privacy policy reviewed; privacy terms are not a reuse licence. Bounded individual-site facts only.",
    "terms_review_url": "https://europeanenergy.com/wp-content/uploads/2026/02/privacy-notice-and-cookie-policy-february-2026.pdf",
    "title": "Anykščiai opening and Telšiai construction",
    "url": "https://europeanenergy.com/2026/10/06/european-energy-opens-first-battery-storage-project-in-the-baltics/"
  },
  "ee_baltic_20261106": {
    "access_method": "original HTTP download",
    "bytes": 72726,
    "http_status": 200,
    "license": "Copyright retained. Limited attributed project facts, no full prose/images/private contacts redistributed; no open bulk reuse licence asserted.",
    "locator": "Dated article and named project paragraphs",
    "publication_date": "2026-08-26",
    "publisher": "European Energy",
    "retrieved_at": "2026-11-06T05:00:48.908550+00:00",
    "sha256": "d37eb6b1d0d0625ff95936827b74fced8c03c6ed9f65f813edeae658f340c857",
    "terms_assessment": "Publisher copyright/footer and accessible privacy policy reviewed; privacy terms are not a reuse licence. Bounded individual-site facts only.",
    "terms_review_url": "https://europeanenergy.com/wp-content/uploads/2026/02/privacy-notice-and-cookie-policy-february-2026.pdf",
    "title": "Anykščiai and Saldus optimisation agreement",
    "url": "https://europeanenergy.com/2026/08/26/european-energy-selects-capalo-ai-for-optimisation-of-two-baltic-hybrid-projects/"
  },
  "ee_denmark_20261106": {
    "access_method": "original HTTP download",
    "bytes": 70087,
    "http_status": 200,
    "license": "Copyright retained. Limited attributed project facts, no full prose/images/private contacts redistributed; no open bulk reuse licence asserted.",
    "locator": "Dated article and named project paragraphs",
    "publication_date": "2026-07-14",
    "publisher": "European Energy",
    "retrieved_at": "2026-11-06T04:59:52.063976+00:00",
    "sha256": "e91a74fc0092e1b8c965af91316d2dbc6b9d47f45d4514f0ddbfb35165234af6",
    "terms_assessment": "Publisher copyright/footer and accessible privacy policy reviewed; privacy terms are not a reuse licence. Bounded individual-site facts only.",
    "terms_review_url": "https://europeanenergy.com/wp-content/uploads/2026/02/privacy-notice-and-cookie-policy-february-2026.pdf",
    "title": "Stouby and Agersted grid connection and operation",
    "url": "https://europeanenergy.com/2026/07/14/european-energy-grid-connects-two-battery-projects-totalling-152-mwh-in-denmark/"
  },
  "ee_kragerup_20261106": {
    "access_method": "original HTTP download",
    "bytes": 65134,
    "http_status": 200,
    "license": "Copyright retained. Limited attributed project facts, no full prose/images/private contacts redistributed; no open bulk reuse licence asserted.",
    "locator": "Dated article and named project paragraphs",
    "publication_date": "2025-01-20",
    "publisher": "European Energy",
    "retrieved_at": "2026-11-06T05:01:36.423445+00:00",
    "sha256": "27b0481f2eec5ad1d482d1e066a54cd3e8247a81b82771845e149554b16eb509",
    "terms_assessment": "Publisher copyright/footer and accessible privacy policy reviewed; privacy terms are not a reuse licence. Bounded individual-site facts only.",
    "terms_review_url": "https://europeanenergy.com/wp-content/uploads/2026/02/privacy-notice-and-cookie-policy-february-2026.pdf",
    "title": "Kragerup battery project initial design",
    "url": "https://europeanenergy.com/2025/01/20/european-energy-launches-first-danish-battery-project-in-collaboration-with-kragerup-estate/"
  },
  "ee_kvosted_20261106": {
    "access_method": "original HTTP download",
    "bytes": 67032,
    "http_status": 200,
    "license": "Copyright retained. Limited attributed project facts, no full prose/images/private contacts redistributed; no open bulk reuse licence asserted.",
    "locator": "Dated article and named project paragraphs",
    "publication_date": "2026-02-04",
    "publisher": "European Energy",
    "retrieved_at": "2026-11-06T05:00:44.603625+00:00",
    "sha256": "14f8613454ca881dbd157ea0d6dfe261d51ee60f08838fc632b9352877ead9e6",
    "terms_assessment": "Publisher copyright/footer and accessible privacy policy reviewed; privacy terms are not a reuse licence. Bounded individual-site facts only.",
    "terms_review_url": "https://europeanenergy.com/wp-content/uploads/2026/02/privacy-notice-and-cookie-policy-february-2026.pdf",
    "title": "Kvosted inauguration and operational history",
    "url": "https://europeanenergy.com/2026/02/04/european-energy-inaugurates-northern-europes-largest-combined-solar-and-battery-park-in-kvosted/"
  },
  "ee_made_20261106": {
    "access_method": "original HTTP download",
    "bytes": 65896,
    "http_status": 200,
    "license": "Copyright retained. Limited attributed project facts, no full prose/images/private contacts redistributed; no open bulk reuse licence asserted.",
    "locator": "Dated article and named project paragraphs",
    "publication_date": "2026-06-16",
    "publisher": "European Energy",
    "retrieved_at": "2026-11-06T05:00:48.171195+00:00",
    "sha256": "c3babad0fba40cb250e8d5b1051f2d723e4c3fdefedce8a332f8f43df0b06fd8",
    "terms_assessment": "Publisher copyright/footer and accessible privacy policy reviewed; privacy terms are not a reuse licence. Bounded individual-site facts only.",
    "terms_review_url": "https://europeanenergy.com/wp-content/uploads/2026/02/privacy-notice-and-cookie-policy-february-2026.pdf",
    "title": "Måde balancing agreement with Twig Energy",
    "url": "https://europeanenergy.com/2026/06/16/european-energy-signs-balancing-agreement-with-twig-energy-for-made-hybrid-park/"
  },
  "ee_portfolio_20261106": {
    "access_method": "original HTTP download",
    "bytes": 73886,
    "http_status": 200,
    "license": "Copyright retained. Limited attributed project facts, no full prose/images/private contacts redistributed; no open bulk reuse licence asserted.",
    "locator": "Dated article and named project paragraphs",
    "publication_date": "2026-08-27",
    "publisher": "European Energy",
    "retrieved_at": "2026-11-06T05:00:44.639212+00:00",
    "sha256": "cc533b73ca3fc97ad45aa6f440c1b634bb42e2f2f0e477d7ea9fea5f6883be62",
    "terms_assessment": "Publisher copyright/footer and accessible privacy policy reviewed; privacy terms are not a reuse licence. Bounded individual-site facts only.",
    "terms_review_url": "https://europeanenergy.com/wp-content/uploads/2026/02/privacy-notice-and-cookie-policy-february-2026.pdf",
    "title": "Seven-site operational battery portfolio",
    "url": "https://europeanenergy.com/2026/08/27/european-energy-expands-battery-portfolio-with-545-mwh-now-operational/"
  },
  "ee_sale_20261106": {
    "access_method": "original HTTP download",
    "bytes": 68103,
    "http_status": 200,
    "license": "Copyright retained. Limited attributed project facts, no full prose/images/private contacts redistributed; no open bulk reuse licence asserted.",
    "locator": "Dated article and named project paragraphs",
    "publication_date": "2025-10-24",
    "publisher": "European Energy",
    "retrieved_at": "2026-11-06T05:00:54.003739+00:00",
    "sha256": "9663baa37be555e0e27407165a2f5a5e5f714cb00477e95325ff380dde548865",
    "terms_assessment": "Publisher copyright/footer and accessible privacy policy reviewed; privacy terms are not a reuse licence. Bounded individual-site facts only.",
    "terms_review_url": "https://europeanenergy.com/wp-content/uploads/2026/02/privacy-notice-and-cookie-policy-february-2026.pdf",
    "title": "Saldus 50 percent divestment agreement",
    "url": "https://europeanenergy.com/2025/10/24/european-energy-divests-combined-solar-and-battery-park-in-latvia-to-sampension/"
  },
  "merusfrequency_20261106": {
    "url": "https://meruspower.com/references/energy-storage-system-supporting-national-frequency-regulation/",
    "retrieved_at": "2026-11-06T05:30:26.527776+00:00",
    "http_status": 200,
    "sha256": "a9adbe74e5aa0d99ea51af96e33571a89b596cd802ddd432e0d8b1b10beeffd0",
    "bytes": 156633,
    "publisher": "Merus Power",
    "title": "Lempäälä standalone frequency-regulation project",
    "locator": "Project opening, EPC/O&M, location, grid-connection and battery-shelter sections",
    "access_method": "original HTTP download",
    "license": "Copyright retained; bounded attributed factual observations only. No full prose, table layout, image or binary redistribution; no open bulk licence asserted.",
    "terms_review_url": "https://meruspower.com/privacy-notice/",
    "terms_assessment": "Publicly linked datasheet/reference or issuer press release; privacy notice concerns personal data and is not a reuse licence. Limited factual extraction only."
  },
  "meruspaistinkulma_20261106": {
    "url": "https://news.cision.com/merus-power-oyj/r/merus-power-s-largest-battery-energy-storage-system-enters-the-electricity-market-use%2Cc4071365",
    "retrieved_at": "2026-11-06T05:35:54.576787+00:00",
    "http_status": 200,
    "sha256": "f22ba696dbd09d9d95219c787ada1fc29180ecdd375d50c2cf5ac818b1102803",
    "bytes": 24135,
    "publisher": "Merus Power",
    "title": "Lempäälä BESS enters electricity market use",
    "locator": "Issuer release opening and EPC paragraphs",
    "access_method": "original HTTP download",
    "license": "Copyright retained; bounded attributed factual observations only. No full prose, table layout, image or binary redistribution; no open bulk licence asserted.",
    "terms_review_url": "https://meruspower.com/privacy-notice/",
    "terms_assessment": "Publicly linked datasheet/reference or issuer press release; privacy notice concerns personal data and is not a reuse licence. Limited factual extraction only.",
    "publication_date": "2024-11-26"
  },
  "merusdistribution_20261106": {
    "url": "https://meruspower.com/references/merus-ess-20-kv-microgrid-national-frequency-regulation-reserve-markets/",
    "retrieved_at": "2026-11-06T05:30:26.363446+00:00",
    "http_status": 200,
    "sha256": "8f43de3a5be0f6f8695ac996016f503f2789782d81bd61e0fc16c288b9da30b2",
    "bytes": 148041,
    "publisher": "Merus Power",
    "title": "Järvenpää distribution-centre BESS",
    "locator": "Project battery paragraph, Location and Scope of supply",
    "access_method": "original HTTP download",
    "license": "Copyright retained; bounded attributed factual observations only. No full prose, table layout, image or binary redistribution; no open bulk licence asserted.",
    "terms_review_url": "https://meruspower.com/privacy-notice/",
    "terms_assessment": "Publicly linked datasheet/reference or issuer press release; privacy notice concerns personal data and is not a reuse licence. Limited factual extraction only."
  },
  "merussociety_20261106": {
    "url": "https://meruspower.com/references/merus-ess-energy-society-20-kv-microgrid-national-frequency-regulation-reserve-markets/",
    "retrieved_at": "2026-11-06T05:35:47.745559+00:00",
    "http_status": 200,
    "sha256": "8d9f43d43ecd6bba81353ff8ed2fc23d6478e71f2fbe7fd96b1d82b73fcddd92",
    "bytes": 150497,
    "publisher": "Merus Power",
    "title": "Lempäälä Energy Society microgrid BESS",
    "locator": "Project battery paragraph, Location and Scope of supply",
    "access_method": "original HTTP download",
    "license": "Copyright retained; bounded attributed factual observations only. No full prose, table layout, image or binary redistribution; no open bulk licence asserted.",
    "terms_review_url": "https://meruspower.com/privacy-notice/",
    "terms_assessment": "Publicly linked datasheet/reference or issuer press release; privacy notice concerns personal data and is not a reuse licence. Limited factual extraction only."
  },
  "merusboiler_20261106": {
    "url": "https://meruspower.com/references/battery-energy-storage-system-co-operating-with-electric-boiler/",
    "retrieved_at": "2026-11-06T05:35:48.703382+00:00",
    "http_status": 200,
    "sha256": "8a489391351731d15f4b9c93a13f22a696a17770e01e9be7127a0773d148e0bd",
    "bytes": 151586,
    "publisher": "Merus Power",
    "title": "Oravainen BESS co-operating with electric boiler",
    "locator": "7 MW delivery section, sector-coupling and Location",
    "access_method": "original HTTP download",
    "license": "Copyright retained; bounded attributed factual observations only. No full prose, table layout, image or binary redistribution; no open bulk licence asserted.",
    "terms_review_url": "https://meruspower.com/privacy-notice/",
    "terms_assessment": "Publicly linked datasheet/reference or issuer press release; privacy notice concerns personal data and is not a reuse licence. Limited factual extraction only."
  },
  "merusneve_20261106": {
    "url": "https://meruspower.com/news/energy-storage-for-arctic-conditions/",
    "retrieved_at": "2026-11-06T05:30:31.423076+00:00",
    "http_status": 200,
    "sha256": "f1127539eb11aeaff665924aeff1b4983cff4437658350e7bd64082f567bbb77",
    "bytes": 143857,
    "publisher": "Merus Power",
    "title": "Neve Rovaniemi energy storage for Arctic conditions",
    "locator": "Dated opening, scope and service paragraphs",
    "access_method": "original HTTP download",
    "license": "Copyright retained; bounded attributed factual observations only. No full prose, table layout, image or binary redistribution; no open bulk licence asserted.",
    "terms_review_url": "https://meruspower.com/privacy-notice/",
    "terms_assessment": "Publicly linked datasheet/reference or issuer press release; privacy notice concerns personal data and is not a reuse licence. Limited factual extraction only.",
    "publication_date": "2026-01-27"
  },
  "meruslab_20261106": {
    "url": "https://www.sttinfo.fi/tiedote/71040135/merus-power-built-its-own-energy-storage-facility-in-lempaala-finland-mainstay-for-developing-and-testing-new-technology?lang=en&publisherId=69821243",
    "retrieved_at": "2026-11-06T05:35:52.827361+00:00",
    "http_status": 200,
    "sha256": "80dbc7e63a6a6746f45cc20076d8a6dbacbe470664098368488da9dc5405023c",
    "bytes": 151606,
    "publisher": "Merus Power",
    "title": "Merus-owned Lempäälä test facility",
    "locator": "Issuer release opening; ownership, trading and neighbour distinction",
    "access_method": "original HTTP download",
    "license": "Copyright retained; bounded attributed factual observations only. No full prose, table layout, image or binary redistribution; no open bulk licence asserted.",
    "terms_review_url": "https://meruspower.com/privacy-notice/",
    "terms_assessment": "Publicly linked datasheet/reference or issuer press release; privacy notice concerns personal data and is not a reuse licence. Limited factual extraction only.",
    "publication_date": "2025-03-25"
  },
  "meruspoland_20261106": {
    "url": "https://meruspower.com/news/merus-power-strengthens-its-position-in-polands-growing-energy-storage-market/",
    "retrieved_at": "2026-11-06T05:37:37.748563+00:00",
    "http_status": 200,
    "sha256": "661c38f3d54ccbaf499dcd2af7f935fe4a864f230c08a4e9cd58e81b9e6b7ce0",
    "bytes": 144770,
    "publisher": "Merus Power",
    "title": "TYMBARK-MWS battery supply agreement",
    "locator": "Dated opening, consortium and summer2027 commissioning target",
    "access_method": "original HTTP download",
    "license": "Copyright retained; bounded attributed factual observations only. No full prose, table layout, image or binary redistribution; no open bulk licence asserted.",
    "terms_review_url": "https://meruspower.com/privacy-notice/",
    "terms_assessment": "Publicly linked datasheet/reference or issuer press release; privacy notice concerns personal data and is not a reuse licence. Limited factual extraction only.",
    "publication_date": "2026-08-12"
  },
  "meruswind_20261106": {
    "url": "https://meruspower.com/references/merus-ess-20-mw-wind-farm/",
    "retrieved_at": "2026-11-06T05:30:31.366030+00:00",
    "http_status": 200,
    "sha256": "e2a6e0e9f917be1ab489170d3046d56e4230a42f57dbd9fc86defb001712fe86",
    "bytes": 142242,
    "publisher": "Merus Power",
    "title": "Viinamäki wind-linked BESS",
    "locator": "6 MW/6.6 MWh battery paragraph, Scope of supply and Location",
    "access_method": "original HTTP download",
    "license": "Copyright retained; bounded attributed factual observations only. No full prose, table layout, image or binary redistribution; no open bulk licence asserted.",
    "terms_review_url": "https://meruspower.com/privacy-notice/",
    "terms_assessment": "Publicly linked datasheet/reference or issuer press release; privacy notice concerns personal data and is not a reuse licence. Limited factual extraction only."
  },
  "bosgreenlab_20261106": {
    "url": "https://blog.bospower.com/news/bos-power-secures-major-bess-contract-with-eurowind-energy",
    "retrieved_at": "2026-11-06T05:30:09.869522+00:00",
    "http_status": 200,
    "sha256": "8b2407297ce63283a994fea5a4a32d9f196b8bca5dd7009ea8f69d3cc23aad10",
    "bytes": 83128,
    "publisher": "BOS Power",
    "title": "GreenLab BESS supply contract",
    "locator": "Dated opening, battery rating, scope and expected schedule",
    "access_method": "original HTTP download",
    "license": "Copyright retained; bounded attributed factual observations only. No full prose, table layout, image or binary redistribution; no open bulk licence asserted.",
    "terms_review_url": "https://bospower.com/privacy-policy?hsLang=en",
    "terms_assessment": "Publicly linked datasheet/reference or issuer press release; privacy notice concerns personal data and is not a reuse licence. Limited factual extraction only.",
    "publication_date": "2025-03-11"
  },
  "greenlab_lota10_20261106": {
    "url": "https://www.greenlab.dk/become-a-site-partner/lot-a10-in-operation/",
    "publisher": "GreenLab",
    "title": "Lot A10 in operation",
    "retrieved_at": "2026-11-06T05:41:08.309993+00:00",
    "publication_date": null,
    "locator": "Public reader lines35–58 and203–205; named occupant and battery facility",
    "license": "Copyright retained; individual public primary-source factual observation, no bulk reuse licence asserted. No full post, images or source page redistributed.",
    "access_method": "public web reader",
    "sha256": null,
    "checksum_limitation": "Original response bytes unavailable through reader; no HTML checksum claimed. GreenLab direct HTTP returned455 and was not bypassed.",
    "date_qualification": "Undated page / relative social timestamp; no inferred exact publication date or COD",
    "terms_review_url": "https://www.greenlab.dk/media/1861/privacy-policy-13042023.pdf",
    "terms_assessment": "Bounded individually accessed public factual evidence; no logged-in session, automated scraping, contact or access-control circumvention."
  },
  "boscase_20261106": {
    "url": "https://bospower.com/bess-battery-energy-storage-system",
    "retrieved_at": "2026-11-06T05:51:04.738728+00:00",
    "http_status": 200,
    "sha256": "1221a2eada9caae306dce5b4065c41c323dbd7223588598468892d2cf187e57e",
    "bytes": 156001,
    "publisher": "BOS Power",
    "title": "BESS GreenLab Skive project example",
    "locator": "GreenLab project subsection, opening22MW/45MWh sentence; generic subsequent product/services sections excluded",
    "license": "Copyright retained; bounded attributed project facts only; no open bulk licence asserted and no full prose/images redistributed.",
    "terms_review_url": "https://bospower.com/privacy-policy?hsLang=en",
    "access_method": "original HTTP download",
    "publication_date": null
  },
  "pibaward_20261106": {
    "url": "https://www.pib.gov.in/Pressreleaseshare.aspx?PRID=1783446",
    "retrieved_at": "2026-11-06T07:54:53.454704+00:00",
    "http_status": 200,
    "sha256": "0a5cbb9e018c05d0cb0f41dce2239a9a639e9a241a36c3f2c4b345b33ce351b9",
    "title": "SECI awards Rajnandgaon solar and battery contract",
    "publisher": "Government of India / Press Information Bureau",
    "publication_date": "2021-12-20",
    "document_revision": "Release dated 2021-12-20",
    "locator": "Opening project/contract paragraphs",
    "access_method": "Original HTTP HTML download",
    "license": "PIB Copyright Policy permits accurate reuse with prominent attribution, excluding third-party material. Ministry of Power/MNRE, Government of India, via PIB; no photos or third-party prose reused.",
    "terms_review_url": "https://www.pib.gov.in/ContentPage.aspx?lang=2&menuid=102&reg=48"
  },
  "pibgrant_20261106": {
    "url": "https://www.pib.gov.in/Pressreleaseshare.aspx?PRID=1845090",
    "retrieved_at": "2026-11-06T07:59:28.051299+00:00",
    "http_status": 200,
    "sha256": "d4e02098593aa9c5aad3f4ba60d28a78eb077a0e3e3cc81cb5e45b574341b7f5",
    "title": "PSU solar and battery project implementation and grant support",
    "publisher": "Government of India / Press Information Bureau",
    "publication_date": "2022-07-26",
    "document_revision": "Release dated 2022-07-26",
    "locator": "Numbered project list item 1",
    "access_method": "Original HTTP HTML download",
    "license": "PIB Copyright Policy permits accurate reuse with prominent attribution, excluding third-party material. Ministry of Power/MNRE, Government of India, via PIB; no photos or third-party prose reused.",
    "terms_review_url": "https://www.pib.gov.in/ContentPage.aspx?lang=2&menuid=102&reg=48"
  },
  "scatecfirst_20261106": {
    "url": "https://www.scatec.com/en/cod-reached-for-first-phase-of-the-obelisk-project-in-egypt/",
    "retrieved_at": "2026-11-06T07:59:27.503127+00:00",
    "http_status": 200,
    "sha256": "c4d9d03fe1330cd7ae58138efbf96dc277b260596791444bd5a6808fea1b308a",
    "title": "COD reached for first phase of the Obelisk project in Egypt",
    "publisher": "Scatec",
    "publication_date": "2026-02-23",
    "document_revision": "Release dated 2026-02-23",
    "locator": "Opening project/contract paragraphs",
    "access_method": "Original HTTP HTML download",
    "license": "Copyright retained; selected attributed factual regulatory-release observations only. No open bulk licence asserted.",
    "terms_review_url": "https://www.scatec.com/en/privacy-policy/"
  },
  "intilion_mainz_wiesbaden_20261106": {
    "url": "https://intilion.com/pressemitteilungen/intilion-realisiert-zwei-batteriegrossspeicherprojekte-in-mainz-und-wiesbaden/",
    "retrieved_at": "2026-11-06T08:57:51.982902+00:00",
    "http_status": 200,
    "sha256": "aa1b499ea9a9b6a0664bf2200541106101a6b01f4c12ee1f05c2f174dfdc0057",
    "title": "Mainz and Wiesbaden battery supply contracts",
    "publisher": "INTILION",
    "locator": "Site-specific ratings; service agreement; project dates; intended services",
    "document_revision": "Release dated2026-03-24",
    "license": "Copyright retained; bounded attributed factual observations only; no prose, artwork or full documents redistributed; no open bulk licence asserted.",
    "terms_review_url": "https://intilion.com/impressum",
    "access_method": "Original HTTP download; technical table visually reviewed where applicable",
    "publication_date": "2026-03-24"
  },
  "intilion_reference_1_20261106": {
    "url": "https://intilion.com/grossbatterie-fur-die-schweiz-wir-errichten-einen-65-mwh-netzspeicher/?hsLang=de",
    "retrieved_at": "2026-11-06T09:00:43.235724+00:00",
    "http_status": 200,
    "sha256": "e23419d1746fa1f343a87877602758ee6c407e143f2023905db7eb71946f3cb6",
    "publisher": "INTILION",
    "title": "Primeo Energie Kappel BESS — project reference",
    "document_revision": "Undated live reference page; original-byte checksum identifies retrieved edition",
    "locator": "Opening rating block; implementation, operation and customer/site sections",
    "license": "Copyright retained; bounded attributed factual observations only. No open bulk licence asserted; prose/images excluded.",
    "terms_review_url": "https://intilion.com/impressum",
    "access_method": "Original HTML HTTP200, manually reviewed named-site reference"
  },
  "intilion_reference_4_20261106": {
    "url": "https://intilion.com/batteriegro%C3%9Fspeicher-feuchtwangen-20-mwh-f%C3%BCr-kommunale-energiewende?hsLang=de",
    "retrieved_at": "2026-11-06T09:00:48.345130+00:00",
    "http_status": 200,
    "sha256": "7a0f3792687d8f9a5c5b475ec89c5a7317744325fa79dc3a1586626d96fa3a8a",
    "publisher": "INTILION",
    "title": "Stadtwerke Feuchtwangen Schleifmühle BESS — project reference",
    "document_revision": "Undated live reference page; original-byte checksum identifies retrieved edition",
    "locator": "Opening rating block; implementation, operation and customer/site sections",
    "license": "Copyright retained; bounded attributed factual observations only. No open bulk licence asserted; prose/images excluded.",
    "terms_review_url": "https://intilion.com/impressum",
    "access_method": "Original HTML HTTP200, manually reviewed named-site reference"
  },
  "intilion_reference_5_20261106": {
    "url": "https://intilion.com/epc-projekt-20-mwh-batteriespeicher-in-halle-cce-holding?hsLang=de",
    "retrieved_at": "2026-11-06T09:00:54.104144+00:00",
    "http_status": 200,
    "sha256": "bdf6d0755246d8e14bcab5ae65d7377656cf20062c3623b94ba9d24586519b5b",
    "publisher": "INTILION",
    "title": "CCE Halle (Saale) BESS — project reference",
    "document_revision": "Undated live reference page; original-byte checksum identifies retrieved edition",
    "locator": "Opening rating block; implementation, operation and customer/site sections",
    "license": "Copyright retained; bounded attributed factual observations only. No open bulk licence asserted; prose/images excluded.",
    "terms_review_url": "https://intilion.com/impressum",
    "access_method": "Original HTML HTTP200, manually reviewed named-site reference"
  },
  "intilion_reference_6_20261106": {
    "url": "https://intilion.com/batteriespeicher-st%C3%A4rkt-die-daseinsvorsorge-in-dinslaken?hsLang=de",
    "retrieved_at": "2026-11-06T09:00:54.243322+00:00",
    "http_status": 200,
    "sha256": "acdecba401beb3444588354ad6d113031b10d685c910936e007453858e55d835",
    "publisher": "INTILION",
    "title": "Stadtwerke Dinslaken BESS — project reference",
    "document_revision": "Undated live reference page; original-byte checksum identifies retrieved edition",
    "locator": "Opening rating block; implementation, operation and customer/site sections",
    "license": "Copyright retained; bounded attributed factual observations only. No open bulk licence asserted; prose/images excluded.",
    "terms_review_url": "https://intilion.com/impressum",
    "access_method": "Original HTML HTTP200, manually reviewed named-site reference"
  },
  "intilion_reference_7_20261106": {
    "url": "https://intilion.com/regelenergie-und-intradayhandel-fur-mehr-stabilitat-im-stromnetz?hsLang=de",
    "retrieved_at": "2026-11-06T09:00:58.373811+00:00",
    "http_status": 200,
    "sha256": "bb395d75dec5a0a9744cdca9b3dcd1f360729676f3d3e7984c08f942fdcda9f7",
    "publisher": "INTILION",
    "title": "LEW Bayernwerk Natur Meitingen BESS — project reference",
    "document_revision": "Undated live reference page; original-byte checksum identifies retrieved edition",
    "locator": "Opening rating block; implementation, operation and customer/site sections",
    "license": "Copyright retained; bounded attributed factual observations only. No open bulk licence asserted; prose/images excluded.",
    "terms_review_url": "https://intilion.com/impressum",
    "access_method": "Original HTML HTTP200, manually reviewed named-site reference"
  },
  "intilion_reference_8_20261106": {
    "url": "https://intilion.com/mit-wind-und-weitblick-speichern-erhoehung-des-selbstversorgungsgrads-der-stadt-haren?hsLang=de",
    "retrieved_at": "2026-11-06T09:00:58.606737+00:00",
    "http_status": 200,
    "sha256": "f7dcc1b592a7c4bef6a6c31441aea857690ff0bd3d885817e05d7767f52566f6",
    "publisher": "INTILION",
    "title": "CEC Haren Fehndorf-Lindloh battery storage — project reference",
    "document_revision": "Undated live reference page; original-byte checksum identifies retrieved edition",
    "locator": "Opening rating block; implementation, operation and customer/site sections",
    "license": "Copyright retained; bounded attributed factual observations only. No open bulk licence asserted; prose/images excluded.",
    "terms_review_url": "https://intilion.com/impressum",
    "access_method": "Original HTML HTTP200, manually reviewed named-site reference"
  },
  "intilion_reference_9_20261106": {
    "url": "https://intilion.com/regionale-energiewende-grossspeicher-fuer-energiegenossenschaft-in-schleswig-holstein?hsLang=de",
    "retrieved_at": "2026-11-06T09:01:03.207160+00:00",
    "http_status": 200,
    "sha256": "1a04db2f7637186e8a7a5e46e0629502738a3e1f93814c18eb480860c92fabf2",
    "publisher": "INTILION",
    "title": "EGIS Lehe solar-park BESS — project reference",
    "document_revision": "Undated live reference page; original-byte checksum identifies retrieved edition",
    "locator": "Opening rating block; implementation, operation and customer/site sections",
    "license": "Copyright retained; bounded attributed factual observations only. No open bulk licence asserted; prose/images excluded.",
    "terms_review_url": "https://intilion.com/impressum",
    "access_method": "Original HTML HTTP200, manually reviewed named-site reference"
  },
  "intilion_reference_10_20261106": {
    "url": "https://intilion.com/multi-use-im-all-electric-society-park-von-phoenix-contact?hsLang=de",
    "retrieved_at": "2026-11-06T09:01:03.159408+00:00",
    "http_status": 200,
    "sha256": "15919b92a63cd4e7ebc87e6411225f0e119a2b48afe0dce1d6e5613cd7b58331",
    "publisher": "INTILION",
    "title": "Phoenix Contact All Electric Society Park BESS — project reference",
    "document_revision": "Undated live reference page; original-byte checksum identifies retrieved edition",
    "locator": "Opening rating block; implementation, operation and customer/site sections",
    "license": "Copyright retained; bounded attributed factual observations only. No open bulk licence asserted; prose/images excluded.",
    "terms_review_url": "https://intilion.com/impressum",
    "access_method": "Original HTML HTTP200, manually reviewed named-site reference"
  },
  "primeo_intilion_reconciliation_20261106": {
    "url": "https://www.primeo-energie.ch/en/ueber-uns/news/BESS-Kappel-erste-Betriebsmonate-erfolgreich.html",
    "retrieved_at": "2026-11-06T09:08:41.113322+00:00",
    "http_status": 200,
    "sha256": "e653c9ac0322e766b8d78e3e3e486055cdb5e60229b65398251b1891b791aa97",
    "publisher": "Primeo Energie",
    "title": "Kappel battery: first months of operation; page body",
    "locator": "Named battery section and explicit technical/operational paragraphs",
    "document_revision": "Undated live page; original-byte checksum identifies edition",
    "access_method": "Original public HTML; manually reviewed; no personal contacts extracted",
    "terms_review_url": "https://www.primeo-energie.ch/en/ueber-uns/impressum.html",
    "license": "Copyright retained; selected attributed factual observations, not prose/images or a bulk republication. No open licence asserted.",
    "notes": "HTML title is stale electricity-tariff boilerplate; battery-specific page body and URL establish content. Publication date not inferred from title."
  },
  "primeotech_intilion_reconciliation_20261106": {
    "url": "https://www.primeo-energie.ch/en/ueber-uns/batteriespeicher-kappel.html",
    "retrieved_at": "2026-11-06T09:08:41.437295+00:00",
    "http_status": 200,
    "sha256": "f78df61e6bef1fdcad1b972ae1b149e0d2f9bff1e88444a4152777769dc4d7ed",
    "publisher": "Primeo Energie",
    "title": "Battery storage Kappel: components and project sequence",
    "locator": "Named battery section and explicit technical/operational paragraphs",
    "document_revision": "Undated live page; original-byte checksum identifies edition",
    "access_method": "Original public HTML; manually reviewed; no personal contacts extracted",
    "terms_review_url": "https://www.primeo-energie.ch/en/ueber-uns/impressum.html",
    "license": "Copyright retained; selected attributed factual observations, not prose/images or a bulk republication. No open licence asserted."
  },
  "halle_intilion_reconciliation_20261106": {
    "url": "https://intilion.com/pressemitteilungen/halle-20-mwh-batteriespeicher-st%C3%A4rkt-versorgungssicherheit",
    "retrieved_at": "2026-11-06T09:08:45.662755+00:00",
    "http_status": 200,
    "sha256": "098ea2cd452cc57d9e13e475a647092490f5f62da1d8bf19682c9f938f50e617",
    "publisher": "INTILION",
    "title": "Halle: commercial battery operation since January2026",
    "locator": "Named battery section and explicit technical/operational paragraphs",
    "document_revision": "2026-04-08",
    "access_method": "Original public HTML; manually reviewed; no personal contacts extracted",
    "terms_review_url": "https://intilion.com/impressum",
    "license": "Copyright retained; selected attributed factual observations, not prose/images or a bulk republication. No open licence asserted.",
    "publication_date": "2026-04-08"
  },
  "dins_intilion_reconciliation_20261106": {
    "url": "https://www.stadtwerke-dinslaken.de/ueber-uns/innovation/",
    "retrieved_at": "2026-11-06T09:08:52.551959+00:00",
    "http_status": 200,
    "sha256": "59b43e1c8fa89ddb5b95df058942eb9f42b103e04fceb02202dab02ce11ef49c",
    "publisher": "Stadtwerke Dinslaken",
    "title": "Innovation and security of supply: battery section — restricted evidence",
    "locator": "Named battery section and explicit technical/operational paragraphs",
    "document_revision": "Undated live page; original-byte checksum identifies edition",
    "access_method": "Original public HTML; manually reviewed; no personal contacts extracted",
    "terms_review_url": "https://www.stadtwerke-dinslaken.de/impressum/",
    "license": "Reuse of information/data requires prior written permission. Technical observation not reproduced; source retained only as conflict-discovery metadata."
  },
  "meit_intilion_reconciliation_20261106": {
    "url": "https://bayernwerk-ag.mynewsdesk.com/pressreleases/neue-grossbatterie-in-meitingen-bei-augsburg-am-netz-3265657",
    "retrieved_at": "2026-11-06T09:08:53.843106+00:00",
    "http_status": 200,
    "sha256": "f8690817b8f65755c2248ba562ece15cd4bf7ab4cb17573c6c1484b7c9d275da",
    "publisher": "Bayernwerk AG",
    "title": "Neue Großbatterie in Meitingen bei Augsburg am Netz",
    "locator": "Named battery section and explicit technical/operational paragraphs",
    "document_revision": "2023-07-28",
    "access_method": "Original public HTML; manually reviewed; no personal contacts extracted",
    "terms_review_url": "https://www.mynewsdesk.com/about/terms-and-conditions/terms_of_use",
    "license": "Copyright retained; selected attributed factual observations, not prose/images or a bulk republication. No open licence asserted.",
    "publication_date": "2023-07-28"
  },
  "cec_intilion_reconciliation_20261106": {
    "url": "https://cec-haren.de/",
    "retrieved_at": "2026-11-06T09:09:07.382627+00:00",
    "http_status": 200,
    "sha256": "22fc0dbb30b5d1318f50e931af9ef829ff383ecb5a057f99caa3963249a0a756",
    "publisher": "CEC Haren",
    "title": "CEC Haren — generation and storage infrastructure",
    "locator": "Named battery section and explicit technical/operational paragraphs",
    "document_revision": "Undated live page; original-byte checksum identifies edition",
    "access_method": "Original public HTML; manually reviewed; no personal contacts extracted",
    "terms_review_url": "https://cec-haren.de/impressum/",
    "license": "Copyright retained; selected attributed factual observations, not prose/images or a bulk republication. No open licence asserted."
  },
  "lehereg_intilion_reconciliation_20261106": {
    "url": "https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/EinheitDetailDrucken/4571596",
    "retrieved_at": "2026-11-06T09:09:02.169004+00:00",
    "http_status": 200,
    "sha256": "c80395c07e8c3a329d78f0954bef8e5361341cbf8b5be073d21e1b67fc5c43c8",
    "publisher": "Bundesnetzagentur / Marktstammdatenregister",
    "title": "PV Speicher Lehe — public MaStR unit print view",
    "locator": "Unit SEE978524946848: name/operation, WGS84, power, battery, grid operator and SSE storage sections",
    "document_revision": "Unit updated2024-04-17; grid-operator checked2024-05-21; location updated2026-07-21",
    "access_method": "Original public HTML; manually reviewed; no personal contacts extracted",
    "terms_review_url": "https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Monitoringberichte/Marktstammdatenregister/artikel.html",
    "license": "Public register factual record; BNetzA states XML/CSV/web-service data DL-DE/BY-2.0. This original HTML print view is a bounded attributed factual transcription, not an assertion that HTML is separately open licensed."
  },
  "lehe_intilion_reconciliation_20261106": {
    "url": "https://www.maxsolar.com/news/detail/solarpark-mit-batteriespeicher-in-lehe",
    "retrieved_at": "2026-11-06T09:09:00.290911+00:00",
    "http_status": 200,
    "sha256": "65ccd01c07cb3840212decc11b9b243f435f9e7c1b1f1bf8968adb7f6fa14c66",
    "publisher": "MaxSolar",
    "title": "Solarpark mit Batteriespeicher in Lehe",
    "locator": "Named battery section and explicit technical/operational paragraphs",
    "document_revision": "2023-08-21",
    "access_method": "Original public HTML; manually reviewed; no personal contacts extracted",
    "terms_review_url": "https://www.maxsolar.com/impressum",
    "license": "Copyright retained; selected attributed factual observations, not prose/images or a bulk republication. No open licence asserted.",
    "publication_date": "2023-08-21"
  },
  "phoenix_intilion_reconciliation_20261106": {
    "url": "https://www.phoenixcontact.com/de-de/unternehmen/all-electric-society/all-electric-society-park-sektorenkopplung",
    "retrieved_at": "2026-11-06T09:08:56.524604+00:00",
    "http_status": 200,
    "sha256": "4fb283b7d94254bd8e26b660c0553b75a1eb33a3a9d2e82f2ef8fdd7310132f7",
    "publisher": "Phoenix Contact",
    "title": "All Electric Society Park – so gelingt die Sektorenkopplung",
    "locator": "Named battery section and explicit technical/operational paragraphs",
    "document_revision": "2024-08-21",
    "access_method": "Original public HTML; manually reviewed; no personal contacts extracted",
    "terms_review_url": "https://www.phoenixcontact.com/de-de/rechtliche-hinweise",
    "license": "Copyright retained; selected attributed factual observations, not prose/images or a bulk republication. No open licence asserted.",
    "publication_date": "2024-08-21"
  },
  "mastr_storage_20261106_p1_p2": {
    "publisher": "Bundesnetzagentur",
    "title": "MaStR Gesamtdatenexport 2026-11-06 revision 26.2: storage unit/installation partitions 1 and 2",
    "url": "https://download.marktstammdatenregister.de/Gesamtdatenexport_20261106_26.2.zip",
    "published_date": "2026-11-06",
    "retrieved_at": "2026-11-06T09:52:44.560987+00:00",
    "license": "Datenlizenz Deutschland Namensnennung 2.0 (DL-DE/BY-2.0); attribution Bundesnetzagentur / Marktstammdatenregister. XML reuse confirmed on official rights/index pages.",
    "access_method": "downloaded_xml_zip_members_http_range",
    "evidence_note": "Exact member, ordinal row, SEE/SSE/SEL IDs and uncompressed SHA256 in each record. Source documentation revision26.2 dated1October2026: net/gross/inverter ratings in kW, usable storage in kWh. ZIP CRC32 and decompressed size checked; no whole-archive checksum claimed.",
    "members": {
      "EinheitenStromSpeicher_1.xml": {
        "url": "https://download.marktstammdatenregister.de/Gesamtdatenexport_20261106_26.2.zip",
        "member": {
          "name": "EinheitenStromSpeicher_1.xml",
          "crc": 2354922616,
          "compressed": 16415151,
          "size": 319678776,
          "offset": 1846783612,
          "method": 8
        },
        "range": "1846783612-1863198820",
        "retrieved_at": "2026-11-06T09:51:22.671558+00:00",
        "sha256": "0eb8b3ed05462be217c51daad3567caea501ca05470aa38ef80ba3ae9b111855",
        "range_sha256": "d4fddebf5f2a29f50be242a406b622c8393e966cda308618f11fe742f04460e0",
        "headers": {
          "content-type": "application/x-zip-compressed",
          "last-modified": "Fri, 06 Nov 2026 02:33:31 GMT",
          "accept-ranges": "bytes",
          "etag": "\"9b997236976ddd1:0\"",
          "date": "Fri, 06 Nov 2026 09:51:00 GMT",
          "content-range": "bytes 1846783612-1863198820/3276867412",
          "strict-transport-security": "max-age=31536000",
          "vary": "Accept-Encoding",
          "content-encoding": "gzip",
          "x-envoy-upstream-service-time": "174",
          "server": "envoy",
          "transfer-encoding": "chunked"
        }
      },
      "EinheitenStromSpeicher_2.xml": {
        "url": "https://download.marktstammdatenregister.de/Gesamtdatenexport_20261106_26.2.zip",
        "member": {
          "name": "EinheitenStromSpeicher_2.xml",
          "crc": 4121325123,
          "compressed": 16440602,
          "size": 319691866,
          "offset": 2027911810,
          "method": 8
        },
        "range": "2027911810-2044352469",
        "retrieved_at": "2026-11-06T09:52:35.089944+00:00",
        "sha256": "2afe8e21c56e84ef49cd834fc8c328046ef728f063a79ca83246fa9f45b081e5",
        "range_sha256": "a6f44cb0209494377c06509619fe8fe8bc71fcf28f671fb129c2a0842b82283f",
        "headers": {
          "content-type": "application/x-zip-compressed",
          "last-modified": "Fri, 06 Nov 2026 02:33:31 GMT",
          "accept-ranges": "bytes",
          "etag": "\"9b997236976ddd1:0\"",
          "date": "Fri, 06 Nov 2026 09:52:14 GMT",
          "content-range": "bytes 2027911810-2044352469/3276867412",
          "strict-transport-security": "max-age=31536000",
          "vary": "Accept-Encoding",
          "content-encoding": "gzip",
          "x-envoy-upstream-service-time": "202",
          "server": "envoy",
          "transfer-encoding": "chunked"
        }
      },
      "AnlagenStromSpeicher_1.xml": {
        "url": "https://download.marktstammdatenregister.de/Gesamtdatenexport_20261106_26.2.zip",
        "member": {
          "name": "AnlagenStromSpeicher_1.xml",
          "crc": 880119074,
          "compressed": 4162748,
          "size": 82658766,
          "offset": 574328181,
          "method": 8
        },
        "range": "574328181-578490984",
        "retrieved_at": "2026-11-06T09:52:09.138745+00:00",
        "sha256": "f88dfe04a1b58b8e6d9e5cebe7b48a9cdea81009e4114c2f6ff462024c5e6c7b",
        "range_sha256": "d94d13431d88b83ec99b3f725eaab62bec3a8691b46dacccf2eb1e30d4458f13",
        "headers": {
          "content-type": "application/x-zip-compressed",
          "last-modified": "Fri, 06 Nov 2026 02:33:31 GMT",
          "accept-ranges": "bytes",
          "etag": "\"9b997236976ddd1:0\"",
          "date": "Fri, 06 Nov 2026 09:52:04 GMT",
          "content-range": "bytes 574328181-578490984/3276867412",
          "strict-transport-security": "max-age=31536000",
          "vary": "Accept-Encoding",
          "content-encoding": "gzip",
          "x-envoy-upstream-service-time": "167",
          "server": "envoy",
          "transfer-encoding": "chunked"
        }
      },
      "AnlagenStromSpeicher_2.xml": {
        "url": "https://download.marktstammdatenregister.de/Gesamtdatenexport_20261106_26.2.zip",
        "member": {
          "name": "AnlagenStromSpeicher_2.xml",
          "crc": 2712368396,
          "compressed": 4124187,
          "size": 82669500,
          "offset": 618373292,
          "method": 8
        },
        "range": "618373292-622497534",
        "retrieved_at": "2026-11-06T09:52:44.560987+00:00",
        "sha256": "cb7994a47e54ad090199096d515fd298b3c0dc6973835a735b1cba6f12e79985",
        "range_sha256": "fef3efcad5c91c4160fc1c4d330780435679840d9fb50295b14e1d249ca8c7e9",
        "headers": {
          "content-type": "application/x-zip-compressed",
          "last-modified": "Fri, 06 Nov 2026 02:33:31 GMT",
          "accept-ranges": "bytes",
          "etag": "\"9b997236976ddd1:0\"",
          "date": "Fri, 06 Nov 2026 09:52:38 GMT",
          "content-range": "bytes 618373292-622497534/3276867412",
          "strict-transport-security": "max-age=31536000",
          "vary": "Accept-Encoding",
          "content-encoding": "gzip",
          "x-envoy-upstream-service-time": "164",
          "server": "envoy",
          "transfer-encoding": "chunked"
        }
      },
      "Katalogwerte.xml": {
        "url": "https://download.marktstammdatenregister.de/Gesamtdatenexport_20261106_26.2.zip",
        "member": {
          "name": "Katalogwerte.xml",
          "crc": 4120115058,
          "compressed": 28360,
          "size": 414388,
          "offset": 2363479629,
          "method": 8
        },
        "range": "2363479629-2363508034",
        "retrieved_at": "2026-11-06T09:50:56.285520+00:00",
        "sha256": "592dd68b87b80def35d0a35c42d476d4da3498480d322d25bed606caac30091a",
        "range_sha256": "7f8a8a8ab2f108eff019e89667e26887543c44cf080e3e5a68a96e13af82cc00",
        "headers": {
          "content-type": "application/x-zip-compressed",
          "last-modified": "Fri, 06 Nov 2026 02:33:31 GMT",
          "accept-ranges": "bytes",
          "etag": "\"9b997236976ddd1:0\"",
          "date": "Fri, 06 Nov 2026 09:50:55 GMT",
          "content-range": "bytes 2363479629-2363508034/3276867412",
          "strict-transport-security": "max-age=31536000",
          "vary": "Accept-Encoding",
          "content-encoding": "gzip",
          "content-length": "28564",
          "x-envoy-upstream-service-time": "921",
          "server": "envoy"
        }
      },
      "Katalogkategorien.xml": {
        "url": "https://download.marktstammdatenregister.de/Gesamtdatenexport_20261106_26.2.zip",
        "member": {
          "name": "Katalogkategorien.xml",
          "crc": 650863536,
          "compressed": 1852,
          "size": 19842,
          "offset": 2363477726,
          "method": 8
        },
        "range": "2363477726-2363479628",
        "retrieved_at": "2026-11-06T09:50:50.167569+00:00",
        "sha256": "28385d6ac478656fa085f7c30dfd844137f8d78110143471b9919b87d6e916da",
        "range_sha256": "ad55af964f4f8eccd5f8e95202148d2530d9e6a4cc701ead3bde87abb19245f7",
        "headers": {
          "content-type": "application/x-zip-compressed",
          "last-modified": "Fri, 06 Nov 2026 02:33:31 GMT",
          "accept-ranges": "bytes",
          "etag": "\"9b997236976ddd1:0\"",
          "date": "Fri, 06 Nov 2026 09:50:49 GMT",
          "content-range": "bytes 2363477726-2363479628/3276867412",
          "strict-transport-security": "max-age=31536000",
          "vary": "Accept-Encoding",
          "content-encoding": "gzip",
          "content-length": "1941",
          "x-envoy-upstream-service-time": "789",
          "server": "envoy"
        }
      }
    },
    "terms_url": "https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Monitoringberichte/Marktstammdatenregister/artikel.html"
  },
  "mastr_docs_262_20261106": {
    "publisher": "Bundesnetzagentur",
    "title": "MaStR Gesamtdatenexport documentation revision26.2",
    "url": "https://www.marktstammdatenregister.de/MaStRHilfe/files/gesamtdatenexport/Dokumentation%20MaStR%20Gesamtdatenexport.zip",
    "published_date": null,
    "retrieved_at": "2026-11-06T09:52:57.965713+00:00",
    "license": "Official registry documentation; factual schema definitions only.",
    "access_method": "web_page",
    "sha256": "95896811832751c94438b05430b46afd3fb8557fc5b6857ec200e20baac98ddf",
    "evidence_note": "Documentation PDF dated2026-10-01, storage units and storage installation data definitions; archive checksum."
  },
  "mastr_storage_20261106_p3": {
    "publisher": "Bundesnetzagentur",
    "title": "MaStR Gesamtdatenexport 2026-11-06 revision 26.2: storage unit/installation partition 3 with prior partition linkage checks",
    "url": "https://download.marktstammdatenregister.de/Gesamtdatenexport_20261106_26.2.zip",
    "published_date": "2026-11-06",
    "retrieved_at": "2026-11-06T11:52:44.523556+00:00",
    "license": "Datenlizenz Deutschland Namensnennung 2.0 (DL-DE/BY-2.0); attribution Bundesnetzagentur / Marktstammdatenregister. XML reuse confirmed on official rights/index pages.",
    "access_method": "downloaded_xml_zip_members_http_range",
    "evidence_note": "Exact member, ordinal row, SEE/SSE/SEL IDs and uncompressed SHA256 in each record. Source documentation revision26.2 dated1October2026: net/gross/inverter ratings in kW, usable storage in kWh. ZIP CRC32 and decompressed size checked; no whole-archive checksum claimed.",
    "members": {
      "EinheitenStromSpeicher_1.xml": {
        "url": "https://download.marktstammdatenregister.de/Gesamtdatenexport_20261106_26.2.zip",
        "member": {
          "name": "EinheitenStromSpeicher_1.xml",
          "crc": 2354922616,
          "compressed": 16415151,
          "size": 319678776,
          "offset": 1846783612,
          "method": 8
        },
        "range": "1846783612-1863198820",
        "retrieved_at": "2026-11-06T09:51:22.671558+00:00",
        "sha256": "0eb8b3ed05462be217c51daad3567caea501ca05470aa38ef80ba3ae9b111855",
        "range_sha256": "d4fddebf5f2a29f50be242a406b622c8393e966cda308618f11fe742f04460e0",
        "headers": {
          "content-type": "application/x-zip-compressed",
          "last-modified": "Fri, 06 Nov 2026 02:33:31 GMT",
          "accept-ranges": "bytes",
          "etag": "\"9b997236976ddd1:0\"",
          "date": "Fri, 06 Nov 2026 09:51:00 GMT",
          "content-range": "bytes 1846783612-1863198820/3276867412",
          "strict-transport-security": "max-age=31536000",
          "vary": "Accept-Encoding",
          "content-encoding": "gzip",
          "x-envoy-upstream-service-time": "174",
          "server": "envoy",
          "transfer-encoding": "chunked"
        }
      },
      "EinheitenStromSpeicher_2.xml": {
        "url": "https://download.marktstammdatenregister.de/Gesamtdatenexport_20261106_26.2.zip",
        "member": {
          "name": "EinheitenStromSpeicher_2.xml",
          "crc": 4121325123,
          "compressed": 16440602,
          "size": 319691866,
          "offset": 2027911810,
          "method": 8
        },
        "range": "2027911810-2044352469",
        "retrieved_at": "2026-11-06T09:52:35.089944+00:00",
        "sha256": "2afe8e21c56e84ef49cd834fc8c328046ef728f063a79ca83246fa9f45b081e5",
        "range_sha256": "a6f44cb0209494377c06509619fe8fe8bc71fcf28f671fb129c2a0842b82283f",
        "headers": {
          "content-type": "application/x-zip-compressed",
          "last-modified": "Fri, 06 Nov 2026 02:33:31 GMT",
          "accept-ranges": "bytes",
          "etag": "\"9b997236976ddd1:0\"",
          "date": "Fri, 06 Nov 2026 09:52:14 GMT",
          "content-range": "bytes 2027911810-2044352469/3276867412",
          "strict-transport-security": "max-age=31536000",
          "vary": "Accept-Encoding",
          "content-encoding": "gzip",
          "x-envoy-upstream-service-time": "202",
          "server": "envoy",
          "transfer-encoding": "chunked"
        }
      },
      "EinheitenStromSpeicher_3.xml": {
        "url": "https://download.marktstammdatenregister.de/Gesamtdatenexport_20261106_26.2.zip",
        "member": {
          "name": "EinheitenStromSpeicher_3.xml",
          "crc": 3796977852,
          "compressed": 16204159,
          "size": 319594576,
          "offset": 2209277972,
          "method": 8
        },
        "range": "2209277972-2225482188",
        "retrieved_at": "2026-11-06T11:52:34.695031+00:00",
        "sha256": "b01d42298e0f027958a5b647fa0db77e2980b9529ed083b8fa738245f3e7c1ad",
        "range_sha256": "55f55e8a6eabcb847a21453e2ad8c15e18a7527437647dcfb217a59814151a25",
        "headers": {
          "content-type": "application/x-zip-compressed",
          "last-modified": "Fri, 06 Nov 2026 02:33:31 GMT",
          "accept-ranges": "bytes",
          "etag": "\"9b997236976ddd1:0\"",
          "date": "Fri, 06 Nov 2026 11:52:13 GMT",
          "content-range": "bytes 2209277972-2225482188/3276867412",
          "strict-transport-security": "max-age=31536000",
          "vary": "Accept-Encoding",
          "content-encoding": "gzip",
          "x-envoy-upstream-service-time": "682",
          "server": "envoy",
          "transfer-encoding": "chunked"
        }
      },
      "AnlagenStromSpeicher_1.xml": {
        "url": "https://download.marktstammdatenregister.de/Gesamtdatenexport_20261106_26.2.zip",
        "member": {
          "name": "AnlagenStromSpeicher_1.xml",
          "crc": 880119074,
          "compressed": 4162748,
          "size": 82658766,
          "offset": 574328181,
          "method": 8
        },
        "range": "574328181-578490984",
        "retrieved_at": "2026-11-06T09:52:09.138745+00:00",
        "sha256": "f88dfe04a1b58b8e6d9e5cebe7b48a9cdea81009e4114c2f6ff462024c5e6c7b",
        "range_sha256": "d94d13431d88b83ec99b3f725eaab62bec3a8691b46dacccf2eb1e30d4458f13",
        "headers": {
          "content-type": "application/x-zip-compressed",
          "last-modified": "Fri, 06 Nov 2026 02:33:31 GMT",
          "accept-ranges": "bytes",
          "etag": "\"9b997236976ddd1:0\"",
          "date": "Fri, 06 Nov 2026 09:52:04 GMT",
          "content-range": "bytes 574328181-578490984/3276867412",
          "strict-transport-security": "max-age=31536000",
          "vary": "Accept-Encoding",
          "content-encoding": "gzip",
          "x-envoy-upstream-service-time": "167",
          "server": "envoy",
          "transfer-encoding": "chunked"
        }
      },
      "AnlagenStromSpeicher_2.xml": {
        "url": "https://download.marktstammdatenregister.de/Gesamtdatenexport_20261106_26.2.zip",
        "member": {
          "name": "AnlagenStromSpeicher_2.xml",
          "crc": 2712368396,
          "compressed": 4124187,
          "size": 82669500,
          "offset": 618373292,
          "method": 8
        },
        "range": "618373292-622497534",
        "retrieved_at": "2026-11-06T09:52:44.560987+00:00",
        "sha256": "cb7994a47e54ad090199096d515fd298b3c0dc6973835a735b1cba6f12e79985",
        "range_sha256": "fef3efcad5c91c4160fc1c4d330780435679840d9fb50295b14e1d249ca8c7e9",
        "headers": {
          "content-type": "application/x-zip-compressed",
          "last-modified": "Fri, 06 Nov 2026 02:33:31 GMT",
          "accept-ranges": "bytes",
          "etag": "\"9b997236976ddd1:0\"",
          "date": "Fri, 06 Nov 2026 09:52:38 GMT",
          "content-range": "bytes 618373292-622497534/3276867412",
          "strict-transport-security": "max-age=31536000",
          "vary": "Accept-Encoding",
          "content-encoding": "gzip",
          "x-envoy-upstream-service-time": "164",
          "server": "envoy",
          "transfer-encoding": "chunked"
        }
      },
      "AnlagenStromSpeicher_3.xml": {
        "url": "https://download.marktstammdatenregister.de/Gesamtdatenexport_20261106_26.2.zip",
        "member": {
          "name": "AnlagenStromSpeicher_3.xml",
          "crc": 3184300839,
          "compressed": 4097310,
          "size": 82682650,
          "offset": 661131171,
          "method": 8
        },
        "range": "661131171-665228536",
        "retrieved_at": "2026-11-06T11:52:44.523556+00:00",
        "sha256": "5dca4966e75e2216ee409dc82f118980381422393c4f91369940545002ed00f1",
        "range_sha256": "078e2149765a294ee3481df84144a0c696a9f2acbec475282afcd506469e3bd5",
        "headers": {
          "content-type": "application/x-zip-compressed",
          "last-modified": "Fri, 06 Nov 2026 02:33:31 GMT",
          "accept-ranges": "bytes",
          "etag": "\"9b997236976ddd1:0\"",
          "date": "Fri, 06 Nov 2026 11:52:38 GMT",
          "content-range": "bytes 661131171-665228536/3276867412",
          "strict-transport-security": "max-age=31536000",
          "vary": "Accept-Encoding",
          "content-encoding": "gzip",
          "x-envoy-upstream-service-time": "170",
          "server": "envoy",
          "transfer-encoding": "chunked"
        }
      },
      "Katalogwerte.xml": {
        "url": "https://download.marktstammdatenregister.de/Gesamtdatenexport_20261106_26.2.zip",
        "member": {
          "name": "Katalogwerte.xml",
          "crc": 4120115058,
          "compressed": 28360,
          "size": 414388,
          "offset": 2363479629,
          "method": 8
        },
        "range": "2363479629-2363508034",
        "retrieved_at": "2026-11-06T09:50:56.285520+00:00",
        "sha256": "592dd68b87b80def35d0a35c42d476d4da3498480d322d25bed606caac30091a",
        "range_sha256": "7f8a8a8ab2f108eff019e89667e26887543c44cf080e3e5a68a96e13af82cc00",
        "headers": {
          "content-type": "application/x-zip-compressed",
          "last-modified": "Fri, 06 Nov 2026 02:33:31 GMT",
          "accept-ranges": "bytes",
          "etag": "\"9b997236976ddd1:0\"",
          "date": "Fri, 06 Nov 2026 09:50:55 GMT",
          "content-range": "bytes 2363479629-2363508034/3276867412",
          "strict-transport-security": "max-age=31536000",
          "vary": "Accept-Encoding",
          "content-encoding": "gzip",
          "content-length": "28564",
          "x-envoy-upstream-service-time": "921",
          "server": "envoy"
        }
      }
    },
    "terms_url": "https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Monitoringberichte/Marktstammdatenregister/artikel.html"
  },
  "mastr_storage_20261106_p4": {
    "publisher": "Bundesnetzagentur",
    "title": "MaStR Gesamtdatenexport 2026-11-06 revision 26.2: storage unit/installation partition 4 with prior partition linkage checks",
    "url": "https://download.marktstammdatenregister.de/Gesamtdatenexport_20261106_26.2.zip",
    "published_date": "2026-11-06",
    "retrieved_at": "2026-11-06T11:59:45.242147+00:00",
    "license": "Datenlizenz Deutschland Namensnennung 2.0 (DL-DE/BY-2.0); attribution Bundesnetzagentur / Marktstammdatenregister. XML reuse confirmed on official rights/index pages.",
    "access_method": "downloaded_xml_zip_members_http_range",
    "evidence_note": "Exact member, ordinal row, SEE/SSE/SEL IDs and uncompressed SHA256 in each record. Source documentation revision26.2 dated1October2026: net/gross/inverter ratings in kW, usable storage in kWh. ZIP CRC32 and decompressed size checked; no whole-archive checksum claimed.",
    "members": {
      "EinheitenStromSpeicher_1.xml": {
        "url": "https://download.marktstammdatenregister.de/Gesamtdatenexport_20261106_26.2.zip",
        "member": {
          "name": "EinheitenStromSpeicher_1.xml",
          "crc": 2354922616,
          "compressed": 16415151,
          "size": 319678776,
          "offset": 1846783612,
          "method": 8
        },
        "range": "1846783612-1863198820",
        "retrieved_at": "2026-11-06T09:51:22.671558+00:00",
        "sha256": "0eb8b3ed05462be217c51daad3567caea501ca05470aa38ef80ba3ae9b111855",
        "range_sha256": "d4fddebf5f2a29f50be242a406b622c8393e966cda308618f11fe742f04460e0",
        "headers": {
          "content-type": "application/x-zip-compressed",
          "last-modified": "Fri, 06 Nov 2026 02:33:31 GMT",
          "accept-ranges": "bytes",
          "etag": "\"9b997236976ddd1:0\"",
          "date": "Fri, 06 Nov 2026 09:51:00 GMT",
          "content-range": "bytes 1846783612-1863198820/3276867412",
          "strict-transport-security": "max-age=31536000",
          "vary": "Accept-Encoding",
          "content-encoding": "gzip",
          "x-envoy-upstream-service-time": "174",
          "server": "envoy",
          "transfer-encoding": "chunked"
        }
      },
      "EinheitenStromSpeicher_2.xml": {
        "url": "https://download.marktstammdatenregister.de/Gesamtdatenexport_20261106_26.2.zip",
        "member": {
          "name": "EinheitenStromSpeicher_2.xml",
          "crc": 4121325123,
          "compressed": 16440602,
          "size": 319691866,
          "offset": 2027911810,
          "method": 8
        },
        "range": "2027911810-2044352469",
        "retrieved_at": "2026-11-06T09:52:35.089944+00:00",
        "sha256": "2afe8e21c56e84ef49cd834fc8c328046ef728f063a79ca83246fa9f45b081e5",
        "range_sha256": "a6f44cb0209494377c06509619fe8fe8bc71fcf28f671fb129c2a0842b82283f",
        "headers": {
          "content-type": "application/x-zip-compressed",
          "last-modified": "Fri, 06 Nov 2026 02:33:31 GMT",
          "accept-ranges": "bytes",
          "etag": "\"9b997236976ddd1:0\"",
          "date": "Fri, 06 Nov 2026 09:52:14 GMT",
          "content-range": "bytes 2027911810-2044352469/3276867412",
          "strict-transport-security": "max-age=31536000",
          "vary": "Accept-Encoding",
          "content-encoding": "gzip",
          "x-envoy-upstream-service-time": "202",
          "server": "envoy",
          "transfer-encoding": "chunked"
        }
      },
      "EinheitenStromSpeicher_3.xml": {
        "url": "https://download.marktstammdatenregister.de/Gesamtdatenexport_20261106_26.2.zip",
        "member": {
          "name": "EinheitenStromSpeicher_3.xml",
          "crc": 3796977852,
          "compressed": 16204159,
          "size": 319594576,
          "offset": 2209277972,
          "method": 8
        },
        "range": "2209277972-2225482188",
        "retrieved_at": "2026-11-06T11:52:34.695031+00:00",
        "sha256": "b01d42298e0f027958a5b647fa0db77e2980b9529ed083b8fa738245f3e7c1ad",
        "range_sha256": "55f55e8a6eabcb847a21453e2ad8c15e18a7527437647dcfb217a59814151a25",
        "headers": {
          "content-type": "application/x-zip-compressed",
          "last-modified": "Fri, 06 Nov 2026 02:33:31 GMT",
          "accept-ranges": "bytes",
          "etag": "\"9b997236976ddd1:0\"",
          "date": "Fri, 06 Nov 2026 11:52:13 GMT",
          "content-range": "bytes 2209277972-2225482188/3276867412",
          "strict-transport-security": "max-age=31536000",
          "vary": "Accept-Encoding",
          "content-encoding": "gzip",
          "x-envoy-upstream-service-time": "682",
          "server": "envoy",
          "transfer-encoding": "chunked"
        }
      },
      "EinheitenStromSpeicher_4.xml": {
        "url": "https://download.marktstammdatenregister.de/Gesamtdatenexport_20261106_26.2.zip",
        "member": {
          "name": "EinheitenStromSpeicher_4.xml",
          "crc": 4002709364,
          "compressed": 16205696,
          "size": 319234710,
          "offset": 2229680058,
          "method": 8
        },
        "range": "2229680058-2245885811",
        "retrieved_at": "2026-11-06T11:59:34.398746+00:00",
        "sha256": "62f3ed6233893ebadcd693e5ccfe7443a7d8fd2eace5740bb2babb01439436ba",
        "range_sha256": "0a32308a1ed857d9a36c09c22a670c971e058380268b9726d5b5309882fdce35",
        "headers": {
          "content-type": "application/x-zip-compressed",
          "last-modified": "Fri, 06 Nov 2026 02:33:31 GMT",
          "accept-ranges": "bytes",
          "etag": "\"9b997236976ddd1:0\"",
          "date": "Fri, 06 Nov 2026 11:59:14 GMT",
          "content-range": "bytes 2229680058-2245885811/3276867412",
          "strict-transport-security": "max-age=31536000",
          "vary": "Accept-Encoding",
          "content-encoding": "gzip",
          "x-envoy-upstream-service-time": "618",
          "server": "envoy",
          "transfer-encoding": "chunked"
        }
      },
      "AnlagenStromSpeicher_1.xml": {
        "url": "https://download.marktstammdatenregister.de/Gesamtdatenexport_20261106_26.2.zip",
        "member": {
          "name": "AnlagenStromSpeicher_1.xml",
          "crc": 880119074,
          "compressed": 4162748,
          "size": 82658766,
          "offset": 574328181,
          "method": 8
        },
        "range": "574328181-578490984",
        "retrieved_at": "2026-11-06T09:52:09.138745+00:00",
        "sha256": "f88dfe04a1b58b8e6d9e5cebe7b48a9cdea81009e4114c2f6ff462024c5e6c7b",
        "range_sha256": "d94d13431d88b83ec99b3f725eaab62bec3a8691b46dacccf2eb1e30d4458f13",
        "headers": {
          "content-type": "application/x-zip-compressed",
          "last-modified": "Fri, 06 Nov 2026 02:33:31 GMT",
          "accept-ranges": "bytes",
          "etag": "\"9b997236976ddd1:0\"",
          "date": "Fri, 06 Nov 2026 09:52:04 GMT",
          "content-range": "bytes 574328181-578490984/3276867412",
          "strict-transport-security": "max-age=31536000",
          "vary": "Accept-Encoding",
          "content-encoding": "gzip",
          "x-envoy-upstream-service-time": "167",
          "server": "envoy",
          "transfer-encoding": "chunked"
        }
      },
      "AnlagenStromSpeicher_2.xml": {
        "url": "https://download.marktstammdatenregister.de/Gesamtdatenexport_20261106_26.2.zip",
        "member": {
          "name": "AnlagenStromSpeicher_2.xml",
          "crc": 2712368396,
          "compressed": 4124187,
          "size": 82669500,
          "offset": 618373292,
          "method": 8
        },
        "range": "618373292-622497534",
        "retrieved_at": "2026-11-06T09:52:44.560987+00:00",
        "sha256": "cb7994a47e54ad090199096d515fd298b3c0dc6973835a735b1cba6f12e79985",
        "range_sha256": "fef3efcad5c91c4160fc1c4d330780435679840d9fb50295b14e1d249ca8c7e9",
        "headers": {
          "content-type": "application/x-zip-compressed",
          "last-modified": "Fri, 06 Nov 2026 02:33:31 GMT",
          "accept-ranges": "bytes",
          "etag": "\"9b997236976ddd1:0\"",
          "date": "Fri, 06 Nov 2026 09:52:38 GMT",
          "content-range": "bytes 618373292-622497534/3276867412",
          "strict-transport-security": "max-age=31536000",
          "vary": "Accept-Encoding",
          "content-encoding": "gzip",
          "x-envoy-upstream-service-time": "164",
          "server": "envoy",
          "transfer-encoding": "chunked"
        }
      },
      "AnlagenStromSpeicher_3.xml": {
        "url": "https://download.marktstammdatenregister.de/Gesamtdatenexport_20261106_26.2.zip",
        "member": {
          "name": "AnlagenStromSpeicher_3.xml",
          "crc": 3184300839,
          "compressed": 4097310,
          "size": 82682650,
          "offset": 661131171,
          "method": 8
        },
        "range": "661131171-665228536",
        "retrieved_at": "2026-11-06T11:52:44.523556+00:00",
        "sha256": "5dca4966e75e2216ee409dc82f118980381422393c4f91369940545002ed00f1",
        "range_sha256": "078e2149765a294ee3481df84144a0c696a9f2acbec475282afcd506469e3bd5",
        "headers": {
          "content-type": "application/x-zip-compressed",
          "last-modified": "Fri, 06 Nov 2026 02:33:31 GMT",
          "accept-ranges": "bytes",
          "etag": "\"9b997236976ddd1:0\"",
          "date": "Fri, 06 Nov 2026 11:52:38 GMT",
          "content-range": "bytes 661131171-665228536/3276867412",
          "strict-transport-security": "max-age=31536000",
          "vary": "Accept-Encoding",
          "content-encoding": "gzip",
          "x-envoy-upstream-service-time": "170",
          "server": "envoy",
          "transfer-encoding": "chunked"
        }
      },
      "AnlagenStromSpeicher_4.xml": {
        "url": "https://download.marktstammdatenregister.de/Gesamtdatenexport_20261106_26.2.zip",
        "member": {
          "name": "AnlagenStromSpeicher_4.xml",
          "crc": 2955675762,
          "compressed": 4091028,
          "size": 82689420,
          "offset": 666181489,
          "method": 8
        },
        "range": "666181489-670272572",
        "retrieved_at": "2026-11-06T11:59:45.242147+00:00",
        "sha256": "59b6b368e5827b3ecdd9d6110ac33849c0beac061493d7088134a064bb690b49",
        "range_sha256": "682d803453f849b0f77f15ad9827e8c23cf0ee52d34673c5d9dd1bb0c153d3b0",
        "headers": {
          "content-type": "application/x-zip-compressed",
          "last-modified": "Fri, 06 Nov 2026 02:33:31 GMT",
          "accept-ranges": "bytes",
          "etag": "\"9b997236976ddd1:0\"",
          "date": "Fri, 06 Nov 2026 11:59:39 GMT",
          "content-range": "bytes 666181489-670272572/3276867412",
          "strict-transport-security": "max-age=31536000",
          "vary": "Accept-Encoding",
          "content-encoding": "gzip",
          "x-envoy-upstream-service-time": "625",
          "server": "envoy",
          "transfer-encoding": "chunked"
        }
      },
      "Katalogwerte.xml": {
        "url": "https://download.marktstammdatenregister.de/Gesamtdatenexport_20261106_26.2.zip",
        "member": {
          "name": "Katalogwerte.xml",
          "crc": 4120115058,
          "compressed": 28360,
          "size": 414388,
          "offset": 2363479629,
          "method": 8
        },
        "range": "2363479629-2363508034",
        "retrieved_at": "2026-11-06T09:50:56.285520+00:00",
        "sha256": "592dd68b87b80def35d0a35c42d476d4da3498480d322d25bed606caac30091a",
        "range_sha256": "7f8a8a8ab2f108eff019e89667e26887543c44cf080e3e5a68a96e13af82cc00",
        "headers": {
          "content-type": "application/x-zip-compressed",
          "last-modified": "Fri, 06 Nov 2026 02:33:31 GMT",
          "accept-ranges": "bytes",
          "etag": "\"9b997236976ddd1:0\"",
          "date": "Fri, 06 Nov 2026 09:50:55 GMT",
          "content-range": "bytes 2363479629-2363508034/3276867412",
          "strict-transport-security": "max-age=31536000",
          "vary": "Accept-Encoding",
          "content-encoding": "gzip",
          "content-length": "28564",
          "x-envoy-upstream-service-time": "921",
          "server": "envoy"
        }
      }
    },
    "terms_url": "https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Monitoringberichte/Marktstammdatenregister/artikel.html"
  },
  "mastr_storage_20261106_p5_p8": {
    "publisher": "Bundesnetzagentur",
    "title": "MaStR Gesamtdatenexport 2026-11-06 revision 26.2: storage unit/installation partitions 5–8, with earlier partition identity checks",
    "url": "https://download.marktstammdatenregister.de/Gesamtdatenexport_20261106_26.2.zip",
    "published_date": "2026-11-06",
    "retrieved_at": "2026-11-06T12:57:11.393300+00:00",
    "license": "Datenlizenz Deutschland Namensnennung 2.0 (DL-DE/BY-2.0); attribution Bundesnetzagentur / Marktstammdatenregister. XML reuse confirmed on official rights/index pages.",
    "access_method": "downloaded_xml_zip_members_http_range",
    "evidence_note": "Exact member, ordinal row, SEE/SSE/SEL IDs and uncompressed SHA256 in each record. Source documentation revision26.2 dated1October2026: net/gross/inverter ratings in kW, usable storage in kWh. ZIP CRC32 and decompressed size checked; no whole-archive checksum claimed.",
    "members": {
      "EinheitenStromSpeicher_1.xml": {
        "url": "https://download.marktstammdatenregister.de/Gesamtdatenexport_20261106_26.2.zip",
        "member": {
          "name": "EinheitenStromSpeicher_1.xml",
          "crc": 2354922616,
          "compressed": 16415151,
          "size": 319678776,
          "offset": 1846783612,
          "method": 8
        },
        "range": "1846783612-1863198820",
        "retrieved_at": "2026-11-06T09:51:22.671558+00:00",
        "sha256": "0eb8b3ed05462be217c51daad3567caea501ca05470aa38ef80ba3ae9b111855",
        "range_sha256": "d4fddebf5f2a29f50be242a406b622c8393e966cda308618f11fe742f04460e0",
        "headers": {
          "content-type": "application/x-zip-compressed",
          "last-modified": "Fri, 06 Nov 2026 02:33:31 GMT",
          "accept-ranges": "bytes",
          "etag": "\"9b997236976ddd1:0\"",
          "date": "Fri, 06 Nov 2026 09:51:00 GMT",
          "content-range": "bytes 1846783612-1863198820/3276867412",
          "strict-transport-security": "max-age=31536000",
          "vary": "Accept-Encoding",
          "content-encoding": "gzip",
          "x-envoy-upstream-service-time": "174",
          "server": "envoy",
          "transfer-encoding": "chunked"
        }
      },
      "AnlagenStromSpeicher_1.xml": {
        "url": "https://download.marktstammdatenregister.de/Gesamtdatenexport_20261106_26.2.zip",
        "member": {
          "name": "AnlagenStromSpeicher_1.xml",
          "crc": 880119074,
          "compressed": 4162748,
          "size": 82658766,
          "offset": 574328181,
          "method": 8
        },
        "range": "574328181-578490984",
        "retrieved_at": "2026-11-06T09:52:09.138745+00:00",
        "sha256": "f88dfe04a1b58b8e6d9e5cebe7b48a9cdea81009e4114c2f6ff462024c5e6c7b",
        "range_sha256": "d94d13431d88b83ec99b3f725eaab62bec3a8691b46dacccf2eb1e30d4458f13",
        "headers": {
          "content-type": "application/x-zip-compressed",
          "last-modified": "Fri, 06 Nov 2026 02:33:31 GMT",
          "accept-ranges": "bytes",
          "etag": "\"9b997236976ddd1:0\"",
          "date": "Fri, 06 Nov 2026 09:52:04 GMT",
          "content-range": "bytes 574328181-578490984/3276867412",
          "strict-transport-security": "max-age=31536000",
          "vary": "Accept-Encoding",
          "content-encoding": "gzip",
          "x-envoy-upstream-service-time": "167",
          "server": "envoy",
          "transfer-encoding": "chunked"
        }
      },
      "EinheitenStromSpeicher_2.xml": {
        "url": "https://download.marktstammdatenregister.de/Gesamtdatenexport_20261106_26.2.zip",
        "member": {
          "name": "EinheitenStromSpeicher_2.xml",
          "crc": 4121325123,
          "compressed": 16440602,
          "size": 319691866,
          "offset": 2027911810,
          "method": 8
        },
        "range": "2027911810-2044352469",
        "retrieved_at": "2026-11-06T09:52:35.089944+00:00",
        "sha256": "2afe8e21c56e84ef49cd834fc8c328046ef728f063a79ca83246fa9f45b081e5",
        "range_sha256": "a6f44cb0209494377c06509619fe8fe8bc71fcf28f671fb129c2a0842b82283f",
        "headers": {
          "content-type": "application/x-zip-compressed",
          "last-modified": "Fri, 06 Nov 2026 02:33:31 GMT",
          "accept-ranges": "bytes",
          "etag": "\"9b997236976ddd1:0\"",
          "date": "Fri, 06 Nov 2026 09:52:14 GMT",
          "content-range": "bytes 2027911810-2044352469/3276867412",
          "strict-transport-security": "max-age=31536000",
          "vary": "Accept-Encoding",
          "content-encoding": "gzip",
          "x-envoy-upstream-service-time": "202",
          "server": "envoy",
          "transfer-encoding": "chunked"
        }
      },
      "AnlagenStromSpeicher_2.xml": {
        "url": "https://download.marktstammdatenregister.de/Gesamtdatenexport_20261106_26.2.zip",
        "member": {
          "name": "AnlagenStromSpeicher_2.xml",
          "crc": 2712368396,
          "compressed": 4124187,
          "size": 82669500,
          "offset": 618373292,
          "method": 8
        },
        "range": "618373292-622497534",
        "retrieved_at": "2026-11-06T09:52:44.560987+00:00",
        "sha256": "cb7994a47e54ad090199096d515fd298b3c0dc6973835a735b1cba6f12e79985",
        "range_sha256": "fef3efcad5c91c4160fc1c4d330780435679840d9fb50295b14e1d249ca8c7e9",
        "headers": {
          "content-type": "application/x-zip-compressed",
          "last-modified": "Fri, 06 Nov 2026 02:33:31 GMT",
          "accept-ranges": "bytes",
          "etag": "\"9b997236976ddd1:0\"",
          "date": "Fri, 06 Nov 2026 09:52:38 GMT",
          "content-range": "bytes 618373292-622497534/3276867412",
          "strict-transport-security": "max-age=31536000",
          "vary": "Accept-Encoding",
          "content-encoding": "gzip",
          "x-envoy-upstream-service-time": "164",
          "server": "envoy",
          "transfer-encoding": "chunked"
        }
      },
      "EinheitenStromSpeicher_3.xml": {
        "url": "https://download.marktstammdatenregister.de/Gesamtdatenexport_20261106_26.2.zip",
        "member": {
          "name": "EinheitenStromSpeicher_3.xml",
          "crc": 3796977852,
          "compressed": 16204159,
          "size": 319594576,
          "offset": 2209277972,
          "method": 8
        },
        "range": "2209277972-2225482188",
        "retrieved_at": "2026-11-06T11:52:34.695031+00:00",
        "sha256": "b01d42298e0f027958a5b647fa0db77e2980b9529ed083b8fa738245f3e7c1ad",
        "range_sha256": "55f55e8a6eabcb847a21453e2ad8c15e18a7527437647dcfb217a59814151a25",
        "headers": {
          "content-type": "application/x-zip-compressed",
          "last-modified": "Fri, 06 Nov 2026 02:33:31 GMT",
          "accept-ranges": "bytes",
          "etag": "\"9b997236976ddd1:0\"",
          "date": "Fri, 06 Nov 2026 11:52:13 GMT",
          "content-range": "bytes 2209277972-2225482188/3276867412",
          "strict-transport-security": "max-age=31536000",
          "vary": "Accept-Encoding",
          "content-encoding": "gzip",
          "x-envoy-upstream-service-time": "682",
          "server": "envoy",
          "transfer-encoding": "chunked"
        }
      },
      "AnlagenStromSpeicher_3.xml": {
        "url": "https://download.marktstammdatenregister.de/Gesamtdatenexport_20261106_26.2.zip",
        "member": {
          "name": "AnlagenStromSpeicher_3.xml",
          "crc": 3184300839,
          "compressed": 4097310,
          "size": 82682650,
          "offset": 661131171,
          "method": 8
        },
        "range": "661131171-665228536",
        "retrieved_at": "2026-11-06T11:52:44.523556+00:00",
        "sha256": "5dca4966e75e2216ee409dc82f118980381422393c4f91369940545002ed00f1",
        "range_sha256": "078e2149765a294ee3481df84144a0c696a9f2acbec475282afcd506469e3bd5",
        "headers": {
          "content-type": "application/x-zip-compressed",
          "last-modified": "Fri, 06 Nov 2026 02:33:31 GMT",
          "accept-ranges": "bytes",
          "etag": "\"9b997236976ddd1:0\"",
          "date": "Fri, 06 Nov 2026 11:52:38 GMT",
          "content-range": "bytes 661131171-665228536/3276867412",
          "strict-transport-security": "max-age=31536000",
          "vary": "Accept-Encoding",
          "content-encoding": "gzip",
          "x-envoy-upstream-service-time": "170",
          "server": "envoy",
          "transfer-encoding": "chunked"
        }
      },
      "EinheitenStromSpeicher_4.xml": {
        "url": "https://download.marktstammdatenregister.de/Gesamtdatenexport_20261106_26.2.zip",
        "member": {
          "name": "EinheitenStromSpeicher_4.xml",
          "crc": 4002709364,
          "compressed": 16205696,
          "size": 319234710,
          "offset": 2229680058,
          "method": 8
        },
        "range": "2229680058-2245885811",
        "retrieved_at": "2026-11-06T11:59:34.398746+00:00",
        "sha256": "62f3ed6233893ebadcd693e5ccfe7443a7d8fd2eace5740bb2babb01439436ba",
        "range_sha256": "0a32308a1ed857d9a36c09c22a670c971e058380268b9726d5b5309882fdce35",
        "headers": {
          "content-type": "application/x-zip-compressed",
          "last-modified": "Fri, 06 Nov 2026 02:33:31 GMT",
          "accept-ranges": "bytes",
          "etag": "\"9b997236976ddd1:0\"",
          "date": "Fri, 06 Nov 2026 11:59:14 GMT",
          "content-range": "bytes 2229680058-2245885811/3276867412",
          "strict-transport-security": "max-age=31536000",
          "vary": "Accept-Encoding",
          "content-encoding": "gzip",
          "x-envoy-upstream-service-time": "618",
          "server": "envoy",
          "transfer-encoding": "chunked"
        }
      },
      "AnlagenStromSpeicher_4.xml": {
        "url": "https://download.marktstammdatenregister.de/Gesamtdatenexport_20261106_26.2.zip",
        "member": {
          "name": "AnlagenStromSpeicher_4.xml",
          "crc": 2955675762,
          "compressed": 4091028,
          "size": 82689420,
          "offset": 666181489,
          "method": 8
        },
        "range": "666181489-670272572",
        "retrieved_at": "2026-11-06T11:59:45.242147+00:00",
        "sha256": "59b6b368e5827b3ecdd9d6110ac33849c0beac061493d7088134a064bb690b49",
        "range_sha256": "682d803453f849b0f77f15ad9827e8c23cf0ee52d34673c5d9dd1bb0c153d3b0",
        "headers": {
          "content-type": "application/x-zip-compressed",
          "last-modified": "Fri, 06 Nov 2026 02:33:31 GMT",
          "accept-ranges": "bytes",
          "etag": "\"9b997236976ddd1:0\"",
          "date": "Fri, 06 Nov 2026 11:59:39 GMT",
          "content-range": "bytes 666181489-670272572/3276867412",
          "strict-transport-security": "max-age=31536000",
          "vary": "Accept-Encoding",
          "content-encoding": "gzip",
          "x-envoy-upstream-service-time": "625",
          "server": "envoy",
          "transfer-encoding": "chunked"
        }
      },
      "EinheitenStromSpeicher_5.xml": {
        "url": "https://download.marktstammdatenregister.de/Gesamtdatenexport_20261106_26.2.zip",
        "member": {
          "name": "EinheitenStromSpeicher_5.xml",
          "crc": 3553584856,
          "compressed": 16202775,
          "size": 318657578,
          "offset": 2245885812,
          "method": 8
        },
        "range": "2245885812-2262088644",
        "retrieved_at": "2026-11-06T12:53:25.166726+00:00",
        "sha256": "6a274b82e540d69ba709f183400309c132f9ecf99024a2dc93bf0ca8e535d1d6",
        "range_sha256": "719d7da04f043167dad69abb15d516ec3bb5ab52ee65baebbaaf1418b4d77d78",
        "headers": {
          "content-type": "application/x-zip-compressed",
          "last-modified": "Fri, 06 Nov 2026 02:33:31 GMT",
          "accept-ranges": "bytes",
          "etag": "\"9b997236976ddd1:0\"",
          "date": "Fri, 06 Nov 2026 12:52:58 GMT",
          "content-range": "bytes 2245885812-2262088644/3276867412",
          "strict-transport-security": "max-age=31536000",
          "vary": "Accept-Encoding",
          "content-encoding": "gzip",
          "x-envoy-upstream-service-time": "910",
          "server": "envoy",
          "transfer-encoding": "chunked"
        }
      },
      "AnlagenStromSpeicher_5.xml": {
        "url": "https://download.marktstammdatenregister.de/Gesamtdatenexport_20261106_26.2.zip",
        "member": {
          "name": "AnlagenStromSpeicher_5.xml",
          "crc": 3042354898,
          "compressed": 4110057,
          "size": 82693810,
          "offset": 670272573,
          "method": 8
        },
        "range": "670272573-674382685",
        "retrieved_at": "2026-11-06T12:53:38.743508+00:00",
        "sha256": "216daa641fe0a5b55e2d7a4c5b17e0ec8a688e0e53efb372de5fdadb2ef4b4ff",
        "range_sha256": "7d544fdc4edbb8dde18492365eb97ca324ddf2238dcef06b07043de3a1894a68",
        "headers": {
          "content-type": "application/x-zip-compressed",
          "last-modified": "Fri, 06 Nov 2026 02:33:31 GMT",
          "accept-ranges": "bytes",
          "etag": "\"9b997236976ddd1:0\"",
          "date": "Fri, 06 Nov 2026 12:53:31 GMT",
          "content-range": "bytes 670272573-674382685/3276867412",
          "strict-transport-security": "max-age=31536000",
          "vary": "Accept-Encoding",
          "content-encoding": "gzip",
          "x-envoy-upstream-service-time": "691",
          "server": "envoy",
          "transfer-encoding": "chunked"
        }
      },
      "EinheitenStromSpeicher_6.xml": {
        "url": "https://download.marktstammdatenregister.de/Gesamtdatenexport_20261106_26.2.zip",
        "member": {
          "name": "EinheitenStromSpeicher_6.xml",
          "crc": 660962632,
          "compressed": 15755982,
          "size": 314514616,
          "offset": 2262088645,
          "method": 8
        },
        "range": "2262088645-2277844684",
        "retrieved_at": "2026-11-06T12:54:07.541338+00:00",
        "sha256": "d8e7110ce87e1fcbfd4a1c8dfc092cfe89cab5f7a0a47097689d7fde1f8572a7",
        "range_sha256": "1bb43d96dfe3c3d66ed0ddd95454f83fb1538663b38cb34b60ae923c288ee90c",
        "headers": {
          "content-type": "application/x-zip-compressed",
          "last-modified": "Fri, 06 Nov 2026 02:33:31 GMT",
          "accept-ranges": "bytes",
          "etag": "\"9b997236976ddd1:0\"",
          "date": "Fri, 06 Nov 2026 12:53:43 GMT",
          "content-range": "bytes 2262088645-2277844684/3276867412",
          "strict-transport-security": "max-age=31536000",
          "vary": "Accept-Encoding",
          "content-encoding": "gzip",
          "x-envoy-upstream-service-time": "213",
          "server": "envoy",
          "transfer-encoding": "chunked"
        }
      },
      "AnlagenStromSpeicher_6.xml": {
        "url": "https://download.marktstammdatenregister.de/Gesamtdatenexport_20261106_26.2.zip",
        "member": {
          "name": "AnlagenStromSpeicher_6.xml",
          "crc": 4017154622,
          "compressed": 4081854,
          "size": 82694674,
          "offset": 674382686,
          "method": 8
        },
        "range": "674382686-678464595",
        "retrieved_at": "2026-11-06T12:54:18.605099+00:00",
        "sha256": "57e12fc208043ebfca86ba5facfa95756eb14bf7b5a35d81b79cb202ac2968ec",
        "range_sha256": "813dd9a98f67574466aeb41fce4ef869ab1b88c2ae59554aec7b232452cdd323",
        "headers": {
          "content-type": "application/x-zip-compressed",
          "last-modified": "Fri, 06 Nov 2026 02:33:31 GMT",
          "accept-ranges": "bytes",
          "etag": "\"9b997236976ddd1:0\"",
          "date": "Fri, 06 Nov 2026 12:54:11 GMT",
          "content-range": "bytes 674382686-678464595/3276867412",
          "strict-transport-security": "max-age=31536000",
          "vary": "Accept-Encoding",
          "content-encoding": "gzip",
          "x-envoy-upstream-service-time": "221",
          "server": "envoy",
          "transfer-encoding": "chunked"
        }
      },
      "EinheitenStromSpeicher_7.xml": {
        "url": "https://download.marktstammdatenregister.de/Gesamtdatenexport_20261106_26.2.zip",
        "member": {
          "name": "EinheitenStromSpeicher_7.xml",
          "crc": 974517908,
          "compressed": 15233784,
          "size": 310574762,
          "offset": 2277844685,
          "method": 8
        },
        "range": "2277844685-2293078526",
        "retrieved_at": "2026-11-06T12:56:15.667702+00:00",
        "sha256": "2c7f25bc68a98f7519c473bbb8024d43ddd75aed690306da629963f050bb5972",
        "range_sha256": "c485159a86a77f26e02367f67f7a36856d80c31f1e2513a2b82f741640a2396b",
        "headers": {
          "content-type": "application/x-zip-compressed",
          "last-modified": "Fri, 06 Nov 2026 02:33:31 GMT",
          "accept-ranges": "bytes",
          "etag": "\"9b997236976ddd1:0\"",
          "date": "Fri, 06 Nov 2026 12:55:49 GMT",
          "content-range": "bytes 2277844685-2293078526/3276867412",
          "strict-transport-security": "max-age=31536000",
          "vary": "Accept-Encoding",
          "content-encoding": "gzip",
          "x-envoy-upstream-service-time": "158",
          "server": "envoy",
          "transfer-encoding": "chunked"
        }
      },
      "AnlagenStromSpeicher_7.xml": {
        "url": "https://download.marktstammdatenregister.de/Gesamtdatenexport_20261106_26.2.zip",
        "member": {
          "name": "AnlagenStromSpeicher_7.xml",
          "crc": 2537661302,
          "compressed": 4058652,
          "size": 82691658,
          "offset": 678464596,
          "method": 8
        },
        "range": "678464596-682523303",
        "retrieved_at": "2026-11-06T12:56:28.760550+00:00",
        "sha256": "0bd12ada5171023be22062f0bb343102a45ca37d7c189ad3548e1b3b67e42b50",
        "range_sha256": "2b59f3d22dbfbfa156fe56e9330e74e0fa4167467a8f4144665dbecd454f528e",
        "headers": {
          "content-type": "application/x-zip-compressed",
          "last-modified": "Fri, 06 Nov 2026 02:33:31 GMT",
          "accept-ranges": "bytes",
          "etag": "\"9b997236976ddd1:0\"",
          "date": "Fri, 06 Nov 2026 12:56:20 GMT",
          "content-range": "bytes 678464596-682523303/3276867412",
          "strict-transport-security": "max-age=31536000",
          "vary": "Accept-Encoding",
          "content-encoding": "gzip",
          "x-envoy-upstream-service-time": "511",
          "server": "envoy",
          "transfer-encoding": "chunked"
        }
      },
      "EinheitenStromSpeicher_8.xml": {
        "url": "https://download.marktstammdatenregister.de/Gesamtdatenexport_20261106_26.2.zip",
        "member": {
          "name": "EinheitenStromSpeicher_8.xml",
          "crc": 2133725443,
          "compressed": 15194511,
          "size": 310243198,
          "offset": 2293078527,
          "method": 8
        },
        "range": "2293078527-2308273095",
        "retrieved_at": "2026-11-06T12:57:00.242497+00:00",
        "sha256": "8b09ba933cfd2eb022e64ade88bf31fe49d35b69214a97422d9a07992388f2d1",
        "range_sha256": "d63c00940144d2872c45f9893414250a1b94c2e65be07afdcf2ade6987af092e",
        "headers": {
          "content-type": "application/x-zip-compressed",
          "last-modified": "Fri, 06 Nov 2026 02:33:31 GMT",
          "accept-ranges": "bytes",
          "etag": "\"9b997236976ddd1:0\"",
          "date": "Fri, 06 Nov 2026 12:56:32 GMT",
          "content-range": "bytes 2293078527-2308273095/3276867412",
          "strict-transport-security": "max-age=31536000",
          "vary": "Accept-Encoding",
          "content-encoding": "gzip",
          "x-envoy-upstream-service-time": "178",
          "server": "envoy",
          "transfer-encoding": "chunked"
        }
      },
      "AnlagenStromSpeicher_8.xml": {
        "url": "https://download.marktstammdatenregister.de/Gesamtdatenexport_20261106_26.2.zip",
        "member": {
          "name": "AnlagenStromSpeicher_8.xml",
          "crc": 1878097869,
          "compressed": 4051177,
          "size": 82689356,
          "offset": 682523304,
          "method": 8
        },
        "range": "682523304-686574536",
        "retrieved_at": "2026-11-06T12:57:11.393300+00:00",
        "sha256": "519e4a8f16eb3a83b3f31d0bff7cdd16f0e001202e3466f3e92b1f134b577254",
        "range_sha256": "7f3339f7ed54f0054983d1ab287df1d5eabfddfd5448e8b4d3d1de0117f9f251",
        "headers": {
          "content-type": "application/x-zip-compressed",
          "last-modified": "Fri, 06 Nov 2026 02:33:31 GMT",
          "accept-ranges": "bytes",
          "etag": "\"9b997236976ddd1:0\"",
          "date": "Fri, 06 Nov 2026 12:57:04 GMT",
          "content-range": "bytes 682523304-686574536/3276867412",
          "strict-transport-security": "max-age=31536000",
          "vary": "Accept-Encoding",
          "content-encoding": "gzip",
          "x-envoy-upstream-service-time": "208",
          "server": "envoy",
          "transfer-encoding": "chunked"
        }
      },
      "Katalogwerte.xml": {
        "url": "https://download.marktstammdatenregister.de/Gesamtdatenexport_20261106_26.2.zip",
        "member": {
          "name": "Katalogwerte.xml",
          "crc": 4120115058,
          "compressed": 28360,
          "size": 414388,
          "offset": 2363479629,
          "method": 8
        },
        "range": "2363479629-2363508034",
        "retrieved_at": "2026-11-06T09:50:56.285520+00:00",
        "sha256": "592dd68b87b80def35d0a35c42d476d4da3498480d322d25bed606caac30091a",
        "range_sha256": "7f8a8a8ab2f108eff019e89667e26887543c44cf080e3e5a68a96e13af82cc00",
        "headers": {
          "content-type": "application/x-zip-compressed",
          "last-modified": "Fri, 06 Nov 2026 02:33:31 GMT",
          "accept-ranges": "bytes",
          "etag": "\"9b997236976ddd1:0\"",
          "date": "Fri, 06 Nov 2026 09:50:55 GMT",
          "content-range": "bytes 2363479629-2363508034/3276867412",
          "strict-transport-security": "max-age=31536000",
          "vary": "Accept-Encoding",
          "content-encoding": "gzip",
          "content-length": "28564",
          "x-envoy-upstream-service-time": "921",
          "server": "envoy"
        }
      }
    },
    "terms_url": "https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Monitoringberichte/Marktstammdatenregister/artikel.html"
  },
  "ntpc_bess_lot1_ifb_20250930": {
    "url": "https://ntpctender.ntpc.co.in/Uploads/job_44700.pdf",
    "sha256": "ce47736bdc7159ed62377fb6a234671b87112f2a2c5b592678b3a733360db576",
    "retrieved_at": "2026-11-07T08:05:52.652159+00:00",
    "publisher": "NTPC Limited",
    "title": "EPC Package for BESS Implementation at NTPC Thermal Power Stations (Lot-1)",
    "published_date": "2025-09-30",
    "document_revision": "CS-0011-171A-9 / 2025_NTPC_100673_1",
    "license": "Copyright retained by publisher; bounded manual factual transcription with attribution. No open/bulk-reuse licence asserted; no source PDF, prose, images or logos redistributed.",
    "access_method": "downloaded_pdf",
    "evidence_note": "PDF page 1 section 1.0: seven battery MWh rows; sections 2–3 procurement scope and financing intention. Copyright policy reviewed at https://ntpctender.ntpc.co.in/Index/CopyrightPolicy; no explicit open licence."
  },
  "ntpc_bess_lot2_ifb_20251106": {
    "url": "https://ntpctender.ntpc.co.in/Uploads/job_44817.pdf",
    "sha256": "e94a1e9d044421ea2188e9bb33f42af6229994daaf56b05fe4bb45ed3a261c07",
    "retrieved_at": "2026-11-07T08:06:09.834156+00:00",
    "publisher": "NTPC Limited",
    "title": "EPC Package for BESS Implementation at NTPC Thermal Power Stations (Lot-2)",
    "published_date": "2025-11-06",
    "document_revision": "CS-0011-171B-9 / 2025_NTPC_101702_1",
    "license": "Copyright retained by publisher; bounded manual factual transcription with attribution. No open/bulk-reuse licence asserted; no source PDF, prose, images or logos redistributed.",
    "access_method": "downloaded_pdf",
    "evidence_note": "PDF page 1 section 1.0: nine battery MWh rows; page 2 notice date and individual price-bid IDs. Same tender copyright assessment as Lot-1."
  },
  "solarworld_annual_202526_bess": {
    "url": "https://worldsolar.in/wp-content/uploads/2026/09/Intimation_Annual-Report_2025-26.pdf",
    "sha256": "1a465124d4667edd2d9e6cccd5f3cbf00ed16df412c11440fb84f9ef291f4b1d",
    "retrieved_at": "2026-11-07T08:07:02.355168+00:00",
    "publisher": "Solarworld Energy Solutions Limited",
    "title": "Annual Report 2025–26; stock-exchange filing",
    "published_date": "2026-09-08",
    "document_revision": "FY2025–26",
    "license": "Copyright retained by publisher; bounded manual factual transcription with attribution. No open/bulk-reuse licence asserted; no source PDF, prose, images or logos redistributed.",
    "access_method": "downloaded_pdf",
    "evidence_note": "PDF page 7 / printed pages 10–11, 2026 milestones: three named EPC Notifications of Award, explicitly separate Solapur Lot-1 and Lot-2. No construction/COD inferred. Copyright publication; factual award/capacity observations only."
  },
  "ntpc_mouda_ifb_20260926": {
    "url": "https://ntpctender.ntpc.co.in/Uploads/job_45948.pdf",
    "sha256": "1e62c43cc7dd944131b222457a237f33453b532cf8efefd9bbb35b3ee8521bd8",
    "retrieved_at": "2026-11-07T08:09:02.615254+00:00",
    "publisher": "NTPC Limited",
    "title": "BESS (400MWh) Implementation at NTPC Mouda Super Thermal Power Station",
    "published_date": "2026-09-26",
    "document_revision": "CS-9575-171C-9 / 2026_NTPC_112216_1",
    "license": "Copyright retained by publisher; bounded manual factual transcription with attribution. No open/bulk-reuse licence asserted; no source PDF, prose, images or logos redistributed.",
    "access_method": "downloaded_pdf",
    "evidence_note": "PDF page 1: later tender at same Mouda site, not another project or evidence of operation."
  },
  "ntpc_mouda_scope_20260926": {
    "url": "https://ntpctender.ntpc.co.in/Uploads/tech_job_45948.pdf",
    "sha256": "6d543a71b1b9967d3491f8c598db29530722d0af2a39fa2c7dc4c7a911d8ed55",
    "retrieved_at": "2026-11-07T08:09:08.715802+00:00",
    "publisher": "NTPC Limited",
    "title": "BESS (400MWh) Implementation at NTPC Mouda Super Thermal Power Station — Brief Scope",
    "published_date": null,
    "document_revision": null,
    "license": "Copyright retained by publisher; bounded manual factual transcription with attribution. No open/bulk-reuse licence asserted; no source PDF, prose, images or logos redistributed.",
    "access_method": "downloaded_pdf",
    "evidence_note": "One-page attachment linked from https://ntpctender.ntpc.co.in/NITDetails/NITs/30303 (26 September 2026 notice); attachment itself undated. Design requirements, not measured performance."
  },
  "ntpc_station_states_20261107": {
    "url": "https://ntpc.co.in/power-generation/coal-stations",
    "sha256": "59beffaa69cbd3f73a990fee869c31d49f3af7872141da6b75877b5db00cf3cf",
    "retrieved_at": "2026-11-07T08:16:18.711837+00:00",
    "publisher": "NTPC Limited",
    "title": "Coal Stations — station/state tables",
    "published_date": null,
    "access_method": "downloaded_html",
    "license": "Copyright NTPC; bounded factual station/state reconciliation only. No open/bulk-reuse licence asserted. Disclaimer https://ntpc.co.in/disclaimer restricts photographs/images and Contracts Concluded statements; neither is reproduced or used here.",
    "evidence_note": "NTPC Owned station/state table and JV/Subsidiaries Vallur row. Undated table; site footer last-updated date is not a table reporting date. Thermal generation MW and thermal ownership do not populate battery ratings or battery ownership."
  },
  "mastr_storage_20261107_p9_p14": {
    "url": "https://download.marktstammdatenregister.de/Gesamtdatenexport_20261107_26.2.zip",
    "publisher": "Bundesnetzagentur / Marktstammdatenregister",
    "title": "MaStR full export 7 November 2026, storage unit and installation partitions 9–14",
    "published_date": "2026-11-07",
    "document_revision": "26.2",
    "retrieved_at": "2026-11-07T20:15:40.505888+00:00",
    "license": "Datenlizenz Deutschland – Namensnennung – Version 2.0 (DL-DE/BY-2.0); Bundesnetzagentur, Marktstammdatenregister. https://www.govdata.de/dl-de/by-2-0",
    "access_method": "HTTP Range ZIP members; CRC and length verified; no whole-archive checksum asserted",
    "evidence_note": "Official download index and terms reviewed before extraction. Six full unit partitions (600000 rows), matching installation partitions and Katalogwerte; individual SHA256 and row locators in observations/capture manifest. Only >=1000 kW candidates staged. Incomplete national partition coverage; no national capacity sum."
  },
  "porsche_leipzig_second_life_20261107": {
    "url": "https://newsroom.porsche.com/en/2024/innovation/porsche-plant-leipzig-taycan-batteries-energy-storage-system-37011.html",
    "publisher": "Porsche AG",
    "title": "Taycan batteries at the Porsche plant in Leipzig",
    "published_date": "2024-08-06",
    "retrieved_at": "2026-11-07T20:11:37.414480+00:00",
    "sha256": "df1baa8aad7d522ef39ac51a11348ecf2c31f8ae91892ac5395fdc8532f81032",
    "license": "Copyright Porsche; bounded factual transcription, no open bulk licence or source republication. Legal notice reviewed: https://newsroom.porsche.com/en/legal-notice.html",
    "access_method": "downloaded_html",
    "evidence_note": "Article paragraphs under Second-life batteries: a new life after the car and Four battery containers; no images or prose redistributed."
  },
  "rwe_hamm_neurath_reconciliation_20261107": {
    "url": "https://www.rwe.com/en/press/rwe-generation/2025-02-14-220-megawatts-of-power-to-stabilise-the-grid-new-battery-storage-systems/",
    "publisher": "RWE",
    "title": "220 megawatts of power to stabilise the grid: new battery storage systems in operation",
    "published_date": "2025-02-14",
    "retrieved_at": "2026-11-07T20:15:40.505888+00:00",
    "license": "Copyright RWE; bounded factual reconciliation, no bulk licence asserted.",
    "access_method": "web_reader",
    "evidence_note": "Owner press release: separate Hamm 140MW/151MWh and Neurath 80MW/84MWh sites; 110kV connection and balancing/trading. Direct HTML request 403, so no original-byte hash asserted. 690 cabinets is combined, not per site."
  },
  "elum_dartel_20261108": {
    "url": "https://elum-energy.com/references/dartel-new-distribution-center-chile/",
    "retrieved_at": "2026-11-08T08:10:04.354344+00:00",
    "sha256": "e6df50d106fce6134970e5116c5d6e1f3f2857b6111fa22da2bfe8ef332fab90",
    "publisher": "Elum Energy",
    "title": "Dartel new distribution center - Chile",
    "published_date": null,
    "document_revision": null,
    "access_method": "downloaded_html",
    "license": "Copyright publisher. Bounded manual factual extraction from individual public case studies; no open bulk licence asserted and no source prose/images redistributed.",
    "evidence_note": "Named heading, Context and Layout sections; undated. https://elum-energy.com/conditions/ reviewed: service/equipment contractual terms, not an open-data grant. No download form submitted."
  },
  "elum_0_20261108": {
    "url": "https://elum-energy.com/references/solar-battery-diesel-integration-of-cossma-yabucoa-clinic-in-puerto-rico/",
    "retrieved_at": "2026-11-08T08:10:43.974472+00:00",
    "sha256": "b1f262471a6472b0b3205332595b95ea97a3293ebc00a69dfe32f0f6f67abd22",
    "publisher": "Elum Energy",
    "title": "Solar, Battery, Diesel Integration of COSSMA YABUCOA Clinic",
    "published_date": null,
    "document_revision": null,
    "access_method": "downloaded_html",
    "license": "Copyright publisher. Bounded manual factual extraction from individual public case studies; no open bulk licence asserted and no source prose/images redistributed.",
    "evidence_note": "Named heading, Context and Layout sections; undated. https://elum-energy.com/conditions/ reviewed: service/equipment contractual terms, not an open-data grant. No download form submitted."
  },
  "elum_2_20261108": {
    "url": "https://elum-energy.com/references/utility-scale-bess-project-in-peru/",
    "retrieved_at": "2026-11-08T08:10:43.870369+00:00",
    "sha256": "ab681dba292db981814a74e55503c51b61e77a4b795cd7e9b77a71558ed389b0",
    "publisher": "Elum Energy",
    "title": "BESS Project Optimizes Peak Shaving for a Mine in Peru",
    "published_date": null,
    "document_revision": null,
    "access_method": "downloaded_html",
    "license": "Copyright publisher. Bounded manual factual extraction from individual public case studies; no open bulk licence asserted and no source prose/images redistributed.",
    "evidence_note": "Named heading, Context and Layout sections; undated. https://elum-energy.com/conditions/ reviewed: service/equipment contractual terms, not an open-data grant. No download form submitted."
  },
  "elum_4_20261108": {
    "url": "https://elum-energy.com/references/battery-storage-integration-of-kulara-water-in-cambodia/",
    "retrieved_at": "2026-11-08T08:10:52.377982+00:00",
    "sha256": "06d1a198a8d22390637743fedce57b6b5d962f9ce1db719a7d0b9791dc72b945",
    "publisher": "Elum Energy",
    "title": "Battery Storage Integration of Kulara Water Factory",
    "published_date": null,
    "document_revision": null,
    "access_method": "downloaded_html",
    "license": "Copyright publisher. Bounded manual factual extraction from individual public case studies; no open bulk licence asserted and no source prose/images redistributed.",
    "evidence_note": "Named heading, Context and Layout sections; undated. https://elum-energy.com/conditions/ reviewed: service/equipment contractual terms, not an open-data grant. No download form submitted."
  },
  "elum_5_20261108": {
    "url": "https://elum-energy.com/references/utility-scale-solar-bess-genset-plant-in-chad/",
    "retrieved_at": "2026-11-08T08:10:52.338500+00:00",
    "sha256": "6f365b3af4fd85851d8d44d90925a1570baf8bd30f31c840c6e1d3a4d8357977",
    "publisher": "Elum Energy",
    "title": "Solar, BESS, Genset Power Plant in Chad",
    "published_date": null,
    "document_revision": null,
    "access_method": "downloaded_html",
    "license": "Copyright publisher. Bounded manual factual extraction from individual public case studies; no open bulk licence asserted and no source prose/images redistributed.",
    "evidence_note": "Named heading, Context and Layout sections; undated. https://elum-energy.com/conditions/ reviewed: service/equipment contractual terms, not an open-data grant. No download form submitted."
  },
  "elum_8_20261108": {
    "url": "https://elum-energy.com/references/sustainable-energy-management-for-hospitality-facilities-in-owerri-nigeria/",
    "retrieved_at": "2026-11-08T08:10:59.305575+00:00",
    "sha256": "d05f942cc8627c4b28bca6a61e581ae86350b8698b15d2eaea48dab6814c6646",
    "publisher": "Elum Energy",
    "title": "Sustainable energy management for hospitality facilities in Owerri, Nigeria",
    "published_date": null,
    "document_revision": null,
    "access_method": "downloaded_html",
    "license": "Copyright publisher. Bounded manual factual extraction from individual public case studies; no open bulk licence asserted and no source prose/images redistributed.",
    "evidence_note": "Named heading, Context and Layout sections; undated. https://elum-energy.com/conditions/ reviewed: service/equipment contractual terms, not an open-data grant. No download form submitted."
  },
  "mastr_storage_20261108_p15_p20": {
    "url": "https://download.marktstammdatenregister.de/Gesamtdatenexport_20261108_26.2.zip",
    "publisher": "Bundesnetzagentur / Marktstammdatenregister",
    "title": "MaStR full export 8 November 2026, storage unit and installation partitions 15–20",
    "published_date": "2026-11-08",
    "document_revision": "26.2",
    "retrieved_at": "2026-11-08T08:19:50.132081+00:00",
    "license": "Datenlizenz Deutschland – Namensnennung – Version 2.0 (DL-DE/BY-2.0); Bundesnetzagentur, Marktstammdatenregister. https://www.govdata.de/dl-de/by-2-0",
    "access_method": "HTTP Range ZIP members; CRC and length verified; no whole-archive checksum asserted",
    "evidence_note": "Official download index and terms reviewed before extraction. Six full unit partitions (600000 rows), matching installation partitions and Katalogwerte; individual SHA256 and row locators in observations/capture manifest. Only >=1000 kW candidates staged. Incomplete national partition coverage; no national capacity sum."
  },
  "cce_halle_ratings_20261108": {
    "url": "https://www.cce-holding.com/en/projects/erstes-batteriespeicherprojekt-realisiert-bess-halle-mit-22-8-mwh/",
    "retrieved_at": "2026-11-08T08:14:28.581020+00:00",
    "sha256": "cfe053791c33aec3ca7e8d0d1476f39707ee0a67034a9a67ca5f3e834702656b",
    "publisher": "CCE Holding",
    "title": "First battery storage project implemented: BESS Halle with 22.8 MWh",
    "published_date": null,
    "document_revision": null,
    "license": "Copyright CCE; bounded manual factual extraction, no open bulk licence asserted and no original prose/images redistributed.",
    "access_method": "downloaded_html",
    "evidence_note": "Undated project overview and technical details: installed ratings versus guaranteed performance; footer rights reviewed."
  },
  "mastr_storage_20261108_p21_p22": {
    "url": "https://download.marktstammdatenregister.de/Gesamtdatenexport_20261108_26.2.zip",
    "publisher": "Bundesnetzagentur / Marktstammdatenregister",
    "title": "MaStR full export 8 November 2026, release 26.2, storage partitions 21–22",
    "document_revision": "26.2",
    "retrieved_at": "2026-11-08T20:07:08.498800+00:00",
    "license": "Datenlizenz Deutschland – Namensnennung – Version 2.0 (DL-DE/BY-2.0); Bundesnetzagentur, Marktstammdatenregister. https://www.govdata.de/dl-de/by-2-0",
    "access_method": "HTTP Range ZIP members; CRC and length verified; no whole-archive checksum asserted",
    "locator": "EinheitenStromSpeicher_21/22 and AnlagenStromSpeicher_21/22 XML; exact member/row/checksum in each record",
    "partition_scope": "21–22 only; all 200000 unit rows screened for shared locations; >=1000 kW candidates manually reviewed"
  },
  "kulara_kulara_20261108": {
    "url": "https://solar.totalenergies.asia/totalenergies-installs-first-of-a-kind-solar-and-energy-storage-system-for-kulara-water-in-cambodia/",
    "publisher": "TotalEnergies",
    "title": "TotalEnergies installs first-of-a-kind solar and energy storage system for Kulara Water in Cambodia",
    "retrieved_at": "2026-11-08T20:01:57.901951+00:00",
    "sha256": "b5af87928188c43ac84aa8821798096e9c900812ac5c3b897108b927e89fbc13",
    "source_type": "primary",
    "access_method": "public_html_manual_factual_table_review",
    "license": "Publisher copyright retained; no open-data or bulk-reuse licence established. Bounded factual extraction with attribution only; source prose, HTML and images are not redistributed.",
    "document_revision": null,
    "locator": "Release paragraphs 1–4: Siem Reap, 650 kWp / 896 kWh, completion 3 January 2022, fifteen-year partnership",
    "access_notes": "Public HTML read without registration. Download forms not submitted. No gated datasheet retrieved.",
    "publication_date": "2022-01-20"
  },
  "kulara_owner_20261108": {
    "url": "https://eaukulen.com/sustainability-csr/",
    "publisher": "Kulara Water Co., Ltd.",
    "title": "Sustainability and CSR: green energy transition",
    "retrieved_at": "2026-11-08T20:02:05.737827+00:00",
    "sha256": "4423210a465bac99e943b10a1cd6b1c1cee34a61d398425873b88ace7a7640df",
    "source_type": "primary",
    "access_method": "public_html_manual_factual_table_review",
    "license": "Publisher copyright retained; no open-data or bulk-reuse licence established. Bounded factual extraction with attribution only; source prose, HTML and images are not redistributed.",
    "document_revision": null,
    "locator": "Green Energy Transition & Carbon Footprint Reduction section",
    "access_notes": "Public HTML read without registration. Download forms not submitted. No gated datasheet retrieved."
  },
  "mastr_storage_20261108_p23_p26": {
    "url": "https://download.marktstammdatenregister.de/Gesamtdatenexport_20261108_26.2.zip",
    "publisher": "Bundesnetzagentur / Marktstammdatenregister",
    "title": "MaStR full export 8 November 2026, release 26.2, storage partitions 23–26",
    "document_revision": "26.2",
    "retrieved_at": "2026-11-08T20:43:45.136784+00:00",
    "license": "Datenlizenz Deutschland – Namensnennung – Version 2.0 (DL-DE/BY-2.0); Bundesnetzagentur, Marktstammdatenregister. https://www.govdata.de/dl-de/by-2-0",
    "access_method": "HTTP Range ZIP members; CRC and length verified; no whole-archive checksum asserted",
    "locator": "EinheitenStromSpeicher_23–26 and AnlagenStromSpeicher_23–26 XML; exact member/row/checksum in each record",
    "partition_scope": "23–26 only; all 400000 unit rows screened for shared locations; >=1000 kW candidates manually reviewed"
  },
  "scatec_obelisk_equity_20260506_20261108": {
    "url": "https://www.scatec.com/en/scatec-signs-equity-partnership-agreement-for-obelisk-in-egypt/",
    "publisher": "Scatec ASA",
    "title": "Scatec signs equity partnership agreement for Obelisk in Egypt",
    "publication_date": "2026-05-06",
    "retrieved_at": "2026-11-08T20:44:52.043556+00:00",
    "sha256": "99e994ce9cb31e915cce6cc46d093770d31da94610b364778b98052704c27ead",
    "source_type": "primary",
    "access_method": "public_html_manual_factual_review",
    "locator": "Regulatory release, opening and transaction/economic-interest paragraphs",
    "license": "Publisher copyright retained. Bounded factual extraction with attribution; no open bulk-reuse licence established and no source prose redistributed.",
    "document_revision": null,
    "access_notes": "Public regulatory disclosure; privacy policy inspected, not an open-data licence. No subscription, contact or PDF gate used."
  },
  "botswana_maun_groundbreaking_20260416_20261108": {
    "url": "https://www.gov.bw/botswana-breaks-ground-landmark-500mw-maun-solar-project",
    "publisher": "Government of Botswana",
    "title": "Botswana breaks ground on landmark 500MW Maun solar project",
    "publication_date": "2026-04-16",
    "retrieved_at": "2026-11-08T20:48:30.261773+00:00",
    "sha256": "912bf20f25e9bc8f2240fb168acf31df289856bbf19e26049bb426f220dba1f3",
    "source_type": "primary",
    "access_method": "public_html_manual_factual_review",
    "locator": "Opening, project-execution, BESS and PPA paragraphs",
    "license": "Government site footer: all rights reserved. No open bulk-reuse licence established; bounded factual extraction with attribution only, no source prose or images redistributed.",
    "document_revision": null,
    "access_notes": "Public government announcement fetched directly. Footer inspected; guessed terms route unavailable. No inference of an open-data licence."
  },
  "wb_eskom_icr_20240627_20261108": {
    "url": "https://documents1.worldbank.org/curated/en/099073124153031964/pdf/BOSIB-15ad5625-79d2-4048-8989-500d05ff6772.pdf",
    "final_url": "https://documents1.worldbank.org/curated/en/099073124153031964/pdf/BOSIB-15ad5625-79d2-4048-8989-500d05ff6772.pdf",
    "status": 200,
    "sha256": "6f05d5df8ead81306838e869f523675c4bbfa5bd6f0ef7115874e3cd4e410cda",
    "retrieved_at": "2026-11-08T21:20:38.493340+00:00",
    "bytes": 1071462,
    "publisher": "World Bank",
    "title": "South Africa — Eskom Renewables Support Project: Implementation Completion and Results Report, ICR00006633",
    "publication_date": "2024-06-27",
    "document_revision": "ICR00006633 / TF10690-ZA",
    "source_type": "primary",
    "access_method": "original_lender_pdf_text_and_visual_review",
    "locator": "PDF p14 / printed10 para10; PDF p23 / printed19 para50; PDF p38 / printed34 Annex4 and footnote16",
    "license": "Publicly disclosed original World Bank appraisal of implementation, not an Eskom report mirror. Bounded attributed factual observations only; no open bulk-reuse licence asserted or report redistributed. Public Disclosure Authorized stamp checked against World Bank Documents & Reports FAQ.",
    "disclosure_explanation_url": "https://documents.worldbank.org/en/publication/documents-reports/faqs"
  },
  "mastr_storage_20261108_p27_p30": {
    "url": "https://download.marktstammdatenregister.de/Gesamtdatenexport_20261108_26.2.zip",
    "publisher": "Bundesnetzagentur / Marktstammdatenregister",
    "title": "MaStR full export 8 November 2026, release26.2, final storage partitions27–30",
    "document_revision": "26.2",
    "retrieved_at": "2026-11-08T21:30:52.778202+00:00",
    "license": "Datenlizenz Deutschland – Namensnennung – Version 2.0 (DL-DE/BY-2.0); Bundesnetzagentur, Marktstammdatenregister. https://www.govdata.de/dl-de/by-2-0",
    "access_method": "HTTP Range ZIP members; CRC and length verified; no whole-archive checksum asserted",
    "locator": "EinheitenStromSpeicher_27–30 and AnlagenStromSpeicher_27–30 XML; exact member/row/SHA256 in each record",
    "partition_scope": "Final four storage partitions;329959 unit rows screened;>=1000kW candidates manually reviewed. Archive contains no partition31.",
    "capture_method": "Bounded HTTPRange ZIP member streaming; CRC and uncompressed length checked; member SHA256 only, no whole-ZIP hash"
  },
  "meridian_20261109": {
    "url": "https://www.meridianenergy.co.nz/news-and-events/completion-of-ruakaka-battery-energy-storage-system",
    "sha256": "31f561d2bda434d2243d8e9f15299a9ced59a40e8887546a6df963d51b16e030",
    "retrieved_at": "2026-11-09T08:12:42.628656+00:00",
    "title": "Completion of Ruakaka BESS",
    "publisher": "Meridian Energy",
    "license": "Copyright retained. No open bulk-reuse licence asserted. Bounded manually reviewed factual observations; source bytes/prose not redistributed. Legal/footer links inspected.",
    "access_method": "original_public_html",
    "publication_date": "2025-05-23",
    "evidence_note": "BESS section and completion release paragraphs on construction, capital envelope and partners"
  },
  "meridian_park_20261109": {
    "url": "https://www.meridianenergy.co.nz/new-projects/ruakaka-energy-park",
    "sha256": "3f375d722ac1021bfe248bc5653ecf9be0cfad6aa200449a02cff9f59674d583",
    "retrieved_at": "2026-11-09T08:12:43.200693+00:00",
    "title": "Ruakaka Energy Park",
    "publisher": "Meridian Energy",
    "license": "Copyright retained. No open bulk-reuse licence asserted. Bounded manually reviewed factual observations; source bytes/prose not redistributed. Legal/footer links inspected.",
    "access_method": "original_public_html",
    "publication_date": null,
    "evidence_note": "BESS section and completion release paragraphs on construction, capital envelope and partners"
  },
  "mulilo_mercury_fc_20260410": {
    "url": "https://www.mulilo.com/news/2026/mulilo-powers-ahead-with-financial-close-on-flagship-mercury-bess-project-in-free-state/",
    "publisher": "Mulilo",
    "title": "Mulilo powers ahead with financial close on flagship Mercury BESS project in Free State",
    "publication_date": "2026-04-10",
    "retrieved_at": "2026-11-09T20:04:21.683164+00:00",
    "access_method": "original_web_reader; native HTTP403",
    "sha256": null,
    "locator": "Article body: named project, close, agreement and location paragraphs",
    "license": "No open dataset licence found. Public privacy policy inspected; bounded manually reviewed owner facts, no article redistribution."
  },
  "mulilo_mookodi_cc_20241017": {
    "url": "https://www.mulilo.com/news/2024/mulilo-reaches-commercial-close-on-its-first-of-three-oasis-bess-projects/",
    "publisher": "Mulilo",
    "title": "Mulilo reaches Commercial close on its first of three Oasis BESS projects",
    "publication_date": "2024-10-17",
    "retrieved_at": "2026-11-09T20:04:21.683164+00:00",
    "access_method": "original_web_reader; native HTTP403",
    "sha256": null,
    "locator": "Article body: named project, close, agreement and location paragraphs",
    "license": "No open dataset licence found. Public privacy policy inspected; bounded manually reviewed owner facts, no article redistribution."
  },
  "pmg_nw5130_20261007": {
    "url": "https://pmg.org.za/committee-question/41121/",
    "publisher": "Minister of Electricity and Energy; published by Parliamentary Monitoring Group",
    "title": "Question NW5130: IPPPP construction and pre-financial-close pipeline at end June 2026",
    "publication_date": "2026-10-07",
    "retrieved_at": "2026-11-10T08:13:21.452069+00:00",
    "license": "CC BY 3.0 South Africa, https://creativecommons.org/licenses/by/3.0/za/; adapted from Parliamentary Monitoring Group https://www.pmg.org.za, no endorsement. Rights: https://pmg.org.za/page/disclaimer-copyright",
    "sha256": "bea63fae2177ccddef76e78474d3f330c4584c0b4855b0f10781601b25563be9",
    "access_method": "original_public_html; original ministerial DOCX independently cross-checked",
    "locator": "Construction table (split across two HTML tables), and Table 2; exact native project row stored in extension",
    "original_document_url": "https://static.pmg.org.za/RNW5130-2026-10-07.docx",
    "original_document_sha256": "a989cfd0191d779ce420d7770b10dd5a4c729ceb2545e4c768eba3253be7b769",
    "rights_sha256": "f34a637ff4c50e8e51e717c3fc77eff5fa00496bcaa4fe3d57c8eaa87d911319",
    "reporting_date": "2026-06-30"
  },
  "g7_oya_20261110": {
    "url": "https://g7energies.com/project/oya-energy/",
    "publisher": "G7 Renewable Energies",
    "title": "Oya Energy project: hybrid technology, battery-specific ratings and construction status",
    "publication_date": null,
    "retrieved_at": "2026-11-10T08:23:19.985126+00:00",
    "sha256": "a5935c45912322a14541067d4d133f99fb17d50a3acde898c95dc40c55597581",
    "license": "Copyright retained; bounded factual project review, no open bulk licence asserted. Disclaimer inspected: general accuracy/liability conditions, no dataset licence.",
    "terms_url": "https://g7energies.com/disclaimer/",
    "terms_sha256": "3c9a745ddc9188fe1fbd8173fb891d549d009a0bb0beb652aec770fc6999c2b7",
    "locator": "Project overview paragraphs2–4; construction paragraph; Quick facts technology and contracted-capacity rows",
    "access_method": "original_public_html; web reader independently cross-checked"
  },
  "puc_seychelles_annual2024_bess": {
    "url": "https://www.puc.sc/wp-content/uploads/puc-doc/reports/2024.pdf",
    "publisher": "Public Utilities Corporation, Seychelles",
    "title": "Annual Report2024: two planned solar projects with battery storage",
    "publication_date": null,
    "document_revision": "Annual Report2024; reporting period2024, publication day unstated",
    "retrieved_at": "2026-11-10T20:05:56.880729+00:00",
    "sha256": "897b32f42e8ea5e59a0f30ed58d14ae33b51a081cf3429575f36a6f50cb72cae",
    "access_method": "original_public_pdf; pdftotext layout and visual page25 cross-check",
    "locator": "PDF page25 of95, printed25, Looking Ahead, Agrivoltaic and solar plant with BESS on Ile de Romainville",
    "license": "Copyright retained. Bounded factual review of two named projects from utility annual report, no open bulk-reuse licence asserted. Report and official page footer inspected; no source-specific reuse grant or restrictive notice located. No full document, images or prose redistributed.",
    "rights_review_url": "https://www.puc.sc/electricity/",
    "rights_review_sha256": "7b2777110b56c0b99337df726859cbd92c9d791f17c6136b7244e36eefb165c1"
  },
  "puc_roche_caiman_2021": {
    "url": "https://www.puc.sc/wp-content/uploads/puc-doc/pressreleases/2021-06-24__Ile%20de%20Romainville%20Solar%20Farm%20Media%20kit.pdf",
    "publisher": "Public Utilities Corporation",
    "title": "Ile de Romainville solar farm media kit",
    "retrieved_at": "2026-11-11T08:18:43.447548+00:00",
    "publication_date": null,
    "license": "Copyright retained; bounded factual transcription from utility media kit page7. No open bulk licence asserted; document/footer reviewed. No original redistribution.",
    "sha256": "dff12faa13145143c099b888c5faa5e7ec779b0c28b0b901e01e532b15a46586",
    "locator": "PDF page7",
    "access_method": "original public PDF"
  },
  "ritar_jiangmen_20261111": {
    "url": "https://www.ritarpower.com/8mwh-energy-storage-project.html",
    "publisher": "Ritar International Group",
    "title": "Jiangmen Panasonic Electronics2MW/8MWh Energy Storage Project",
    "retrieved_at": "2026-11-11T08:18:43.447548+00:00",
    "publication_date": null,
    "license": "Copyright retained; bounded factual transcription, not an open bulk licence. Original documents, images and prose are not redistributed. Linked terms cover remote monitoring services, not a catalogue reuse grant.",
    "sha256": "c5ada1f87ee48b70d4a793f5648633e010dc94ec4c2bab4e88cf7685c63bfbd3",
    "locator": "Project / Scheduled Time / Introduction",
    "access_method": "original public HTML"
  },
  "ritar_hengyang_20261111": {
    "url": "https://www.ritarpower.com/ruida-industrial-park-in-hengyang-hunan.html",
    "publisher": "Ritar International Group",
    "title": "Ruida Industrial Park in Hengyang, Hunan",
    "retrieved_at": "2026-11-11T08:18:43.447548+00:00",
    "publication_date": null,
    "license": "Copyright retained; bounded factual transcription, not an open bulk licence. Original documents, images and prose are not redistributed. Linked terms cover remote monitoring services, not a catalogue reuse grant.",
    "sha256": "c78bd678e3344a39977f3f167146b869db4586ea353695fd9e7172a4fe8cf368",
    "locator": "Project / Scale / Model",
    "access_method": "original public HTML"
  },
  "rwe_ragusa_construction_20261110": {
    "url": "https://www.rwe.com/en/press/rwe-renewables-europe-australia/2026-11-10-rwe-starts-construction-of-its-first-battery-in-italy/",
    "publisher": "RWE Renewables Europe & Australia",
    "title": "RWE starts construction of its first battery in Italy",
    "published_date": "2026-11-10",
    "retrieved_at": "2026-11-11T20:08:14.765150+00:00",
    "access_method": "primary webpage and official two-page PDF via web reader; original downloads returned HTTP403",
    "license": "Copyright RWE; limited attributed factual metadata from public press release; no bulk licence or original redistribution asserted.",
    "locator": "Opening project paragraph and grid-services paragraph; official PDF page1",
    "document_url": "https://www.rwe.com/-/media/RWE/RWE-Italy/documents/press/2026/2026-11-10-rwe-starts-construction-of-its-first-battery-in-italy.pdf",
    "evidence_note": "No downloaded-byte checksum asserted. Forecasts remain forecasts; 4h output capability is separate from nominal 262.5MWh."
  },
  "statkraft_neilston_coylton_20261112": {
    "url": "https://www.statkraft.co.uk/newsroom/2026/neilston-scheme-now-operational/",
    "title": "Statkraft’s first grid-forming battery scheme now operational",
    "publisher": "Statkraft",
    "retrieved_at": "2026-11-14T11:13:49.553531+00:00",
    "license": "Copyright retained by publisher; selective factual extraction and citation only. No open bulk-reuse licence established; original bytes excluded from Git.",
    "source_type": "primary",
    "access_method": "original_download",
    "sha256": "720f739ca39f8ba48e7e65b051f7d93411037e466ad180cd197c5cf80366dad7",
    "locator": "Opening paragraphs and final project portfolio paragraph",
    "document_revision": null,
    "publication_date": "2026-11-12"
  },
  "boe_a_2026_14321": {
    "url": "https://www.boe.es/diario_boe/xml.php?id=BOE-A-2026-14321",
    "title": "Resolución de 17 de junio de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Arena Power Ren 29, SL, autorización administrativa previa para el proyecto de almacenamiento energético stand alone «PB Babor 7», de 66 MW de potencia instalada, y su infraestructura de evacuación, en Tarifa (Cádiz).",
    "publisher": "Agencia Estatal Boletín Oficial del Estado",
    "retrieved_at": "2026-11-14T23:18:57.237198+00:00",
    "sha256": "ae3c90182022c1f614adcefe371735339992a548ef3e024725b718ab741f4597",
    "locator": "Original XML ./texto/p, one-based numbered paragraphs; decisive technical and authorisation sections",
    "document_revision": "Decision 2026-06-17, publication 2026-07-01",
    "license": "BOE general reuse conditions, 27 June 2024 licence: commercial/non-commercial factual extraction with attribution and update metadata; no endorsement. https://www.boe.es/informacion/aviso_legal/index.php",
    "access_method": "original_public_download",
    "published_date": "2026-07-01",
    "source_updated_at": "20260701071600",
    "attribution": "Basado en datos de la Agencia Estatal Boletín Oficial del Estado (https://www.boe.es). Independent factual extraction; not an official product or endorsement."
  },
  "boe_a_2026_14322": {
    "url": "https://www.boe.es/diario_boe/xml.php?id=BOE-A-2026-14322",
    "title": "Resolución de 17 de junio de 2026, de la Dirección General de Política Energética y Minas, por la que se otorga a Oropesa Solar, SL, autorización administrativa previa y autorización administrativa de construcción para el módulo de almacenamiento «Talayuela II BESS», de 22,26 MW de potencia instalada, y parte de su infraestructura de evacuación, para su hibridación con la planta fotovoltaica existente, «PSFV Talayuela II», de 44,55 MW de potencia instalada, conformando una instalación hibrida de 66,81 MW de potencia instalada, en Talayuela (Cáceres).",
    "publisher": "Agencia Estatal Boletín Oficial del Estado",
    "retrieved_at": "2026-11-14T23:18:57.237198+00:00",
    "sha256": "5576a7867f278eba412165837fb6ce096771f710e18b9910c79bb9d3a807f41c",
    "locator": "Original XML ./texto/p, one-based numbered paragraphs; decisive technical and authorisation sections",
    "document_revision": "Decision 2026-06-17, publication 2026-07-01",
    "license": "BOE general reuse conditions, 27 June 2024 licence: commercial/non-commercial factual extraction with attribution and update metadata; no endorsement. https://www.boe.es/informacion/aviso_legal/index.php",
    "access_method": "original_public_download",
    "published_date": "2026-07-01",
    "source_updated_at": "20260701071600",
    "attribution": "Basado en datos de la Agencia Estatal Boletín Oficial del Estado (https://www.boe.es). Independent factual extraction; not an official product or endorsement."
  },
  "statkraft_talayuela_project_20261114": {
    "url": "https://www.statkraft.es/somos-statkraft/donde-operamos/espana/talayuela-ii-bess/",
    "title": "Batería Talayuela II / Extremadura",
    "publisher": "Statkraft",
    "retrieved_at": "2026-11-14T23:18:57.237198+00:00",
    "sha256": "4cc51a267e5a78ba5d236225a8616df0588175c2ca4c71603938a9ffa220f01d",
    "locator": "Project characteristics, investment and institutional funding sections",
    "document_revision": "Undated live page",
    "license": "Copyright retained by publisher; no open bulk-reuse licence asserted. Selective factual metadata only; original bytes outside Git.",
    "access_method": "original_public_download"
  },
  "statkraft_q3_2026_presentation": {
    "url": "https://www.statkraft.com/globalassets/0/.com/6-investor-relations/reports-and-presentations/2026/q3/2026-q3-statkraft-as-presentation.pdf",
    "title": "Q3 2026 presentation — investment decisions",
    "publisher": "Statkraft",
    "retrieved_at": "2026-11-14T23:18:57.237198+00:00",
    "sha256": "5ace36bae398206e76f89c11308baf7045d2281359989333dba56a876e71f669",
    "locator": "PDF page 6: Talayuela II BESS 25 MW investment decision",
    "document_revision": "2026-10-29",
    "license": "Copyright retained by publisher; no open bulk-reuse licence asserted. Selective factual metadata only; original bytes outside Git.",
    "access_method": "original_public_download",
    "published_date": "2026-10-29"
  }
}