Worldwide BESS projects database#

The battery energy storage section contains 2,519 records in 55 countries and territories and 485 registered sources. It complements the PV catalogue with its own 60-field schema and typed Parquet export. It combines commercial projects and registry-defined plants, not a census or a ranking of current installed capacity.

Open the BESS project viewer, Database gallery, catalogue/update guide, data dictionary, or latest research and reconciliation.

Published snapshot#

After a successful main documentation deployment, download:

JSONL is canonical in Git. Parquet uses Zstandard, native source lists, nullable numeric fields and UTC timestamps. The browser projection comes from the exact Parquet snapshot and carries matching checksums. Search all fields, filter country/status/chemistry, choose columns, inspect evidence, compare groups and export filtered CSVs. The existing PV viewer remains available separately.

Metadata and interpretation#

Group

Standard fields

Identity and location

Stable UUID, name/aliases, country, region, locality, sourced coordinates, external IDs

Ratings

BESS power MW, energy MWh, electrical/energy basis, source-reported duration, charging MW

Configuration

Chemistry, standalone/co-located/microgrid, grid operator, substation, voltage, applications

Parties and equipment

Owners, developers, operators, EPCs, integrators, battery/PCS suppliers and models

Lifecycle and economics

Dated status, confirmed/expected COD, capital cost/currency/scope, design life

Evidence and maintenance

Source lists, per-field evidence, creation/update/access timestamps, conflicts, phases, extensions

Unknown values remain null. Power and energy must never be combined into one capacity column. A solar rating or site interconnection rating is not battery output. Do not assume that MW is AC or MWh is usable energy when a source does not state the basis. Source-reported duration is separate from any calculated E/P ratio. U.S. inventory plant coordinates are retained as reported; UK grid coordinates stay in native metadata. Many supplier/financial fields remain unpopulated.

Status is tied to its source date; it is not live availability. Old commissioning releases remain historical evidence. Coya, Tamaya, Jurong Island, Salisbury and Edwards & Sanborn contain unresolved rating or scope observations and are explicitly marked needs_review. Phases and fleet totals are not additional project rows. Inspect capacity_scope and phases_json before any aggregation, including partly operating projects.

Reproducible offline analysis#

uv run python -m energy_data_retrieval.bess_catalogue validate
uv run python -m energy_data_retrieval.bess_catalogue build --output artifacts/bess-v1
uv run python examples/database/plot_bess_projects.py
import pandas as pd
from energy_analysis.pv_database import field_profile, grouped_statistics

bess = pd.read_parquet("artifacts/bess-v1/projects.parquet")
print(bess.groupby(["country_code", "status"], dropna=False).size())
print(field_profile("artifacts/bess-v1/projects.parquet"))
print(
    grouped_statistics("artifacts/bess-v1/projects.parquet", "country_code", "energy_capacity_mwh")
)

The shared pv_database analysis helpers accept any compatible Parquet schema, including BESS. Reported sums describe selected source records only. They do not harmonize rating bases, dates, status or scope and are not national market totals.

Source terms apply to exports. Only factual metadata and attribution are included; no original articles or datasheets are redistributed. The U.S. EIA-860 2025 and UK REPD July 2026 snapshots are pinned by SHA-256. See the catalogue guide for offline candidate staging and the explicit exclusion ledger. Coverage remains strongly weighted toward the U.S. and UK; further research should prioritize China, Australia, Chile and other national registries.