energy_data_retrieval.bess_catalogue.nz_pipeline#
Stage explicitly classified batteries from the EA September 2024 pipeline.
- energy_data_retrieval.bess_catalogue.nz_pipeline.parse_nz_pipeline(content)[source]#
Keep row locators and dated planning stages; never infer storage MWh or COD.
No identities are merged. The 2024 file can contain superseded ratings, multi-phase aggregates and projects already operating in newer sources.
- Parameters:
content (bytes)
- Return type:
list[dict[str, Any]]
- energy_data_retrieval.bess_catalogue.nz_pipeline.parse_transpower_pipeline(content)[source]#
Stage October 2026 forward BESS rows, including unnamed rows for review.
This adapter grants no source reuse rights. Connection stages are never physical construction/operating statuses; Max MW is not battery nameplate. Completed-sheet reconciliation is deliberately outside this forward adapter.
- Parameters:
content (bytes)
- Return type:
list[dict[str, Any]]