energy_data_retrieval.bess_catalogue.nz_pipeline#

Stage explicitly classified batteries from the EA September 2024 pipeline.

energy_data_retrieval.bess_catalogue.nz_pipeline.parse_nz_pipeline(content)[source]#

Keep row locators and dated planning stages; never infer storage MWh or COD.

No identities are merged. The 2024 file can contain superseded ratings, multi-phase aggregates and projects already operating in newer sources.

Parameters:

content (bytes)

Return type:

list[dict[str, Any]]

energy_data_retrieval.bess_catalogue.nz_pipeline.parse_transpower_pipeline(content)[source]#

Stage October 2026 forward BESS rows, including unnamed rows for review.

This adapter grants no source reuse rights. Connection stages are never physical construction/operating statuses; Max MW is not battery nameplate. Completed-sheet reconciliation is deliberately outside this forward adapter.

Parameters:

content (bytes)

Return type:

list[dict[str, Any]]