Worldwide BESS projects: coverage, power, energy and evidence#
Rebuild the committed worldwide battery project catalogue into typed Parquet, then inspect coverage and source quality. These are real source-backed records, not synthetic sites or an exhaustive market inventory. Status is a dated source observation; a commissioning announcement does not establish live availability.
Run from a repository checkout with the workspace installed. No live API calls or credentials are required. Explore the same records in the BESS viewer.
from pathlib import Path
from tempfile import TemporaryDirectory
import matplotlib.pyplot as plt
import pandas as pd
from energy_analysis.pv_database import field_profile, grouped_statistics
from energy_data_retrieval.bess_catalogue import build_parquet
ROOT = next(p for p in (Path.cwd(), *Path.cwd().parents) if (p / "catalogues/bess").is_dir())
with TemporaryDirectory() as folder:
snapshot = Path(folder) / "bess"
manifest = build_parquet(ROOT / "catalogues/bess", snapshot)
projects = pd.read_parquet(snapshot / "projects.parquet")
coverage = grouped_statistics(
snapshot / "projects.parquet", "country_code", "energy_capacity_mwh"
)
completeness = field_profile(snapshot / "projects.parquet")
print(f"{len(projects)} projects in {projects['country_code'].nunique()} countries")
print("Input fingerprint:", manifest["input_sha256"])
print("Country counts and energy-field availability (all source dates/statuses):")
print(coverage[["records", "known", "missing"]].to_string())
print("Status observations; not live operating status:")
print(projects["status"].value_counts().to_string())
2669 projects in 57 countries
Input fingerprint: 4cbba42192ffbd139e672daaf7d7f3bc1c27bf2a6cd3c4d616dc24c769aa91da
Country counts and energy-field availability (all source dates/statuses):
records known missing
country_code
AUS 113 111 2
BEL 3 2 1
BRA 1 1 0
BWA 1 1 0
CAN 25 1 24
CHE 1 0 1
CHL 81 81 0
CHN 6 6 0
COK 6 2 4
CPV 4 4 0
DEU 424 419 5
DNK 6 4 2
DOM 7 6 1
EGY 6 5 1
ESP 35 25 10
EST 2 2 0
FIN 20 16 4
FRA 358 351 7
GBR 203 7 196
HUN 1 1 0
IDN 2 1 1
IND 35 34 1
IRL 7 6 1
ITA 3 2 1
JPN 10 4 6
KEN 6 3 3
KHM 1 1 0
LTU 15 14 1
LVA 13 5 8
MDV 77 77 0
MUS 12 11 1
MYS 2 2 0
NAM 2 1 1
NGA 14 7 7
NLD 9 7 2
NZL 17 13 4
PER 1 1 0
PHL 33 12 21
POL 72 14 58
PRI 1 1 0
PRT 3 3 0
ROU 1 0 1
SAU 2 2 0
SEN 3 3 0
SGP 1 1 0
SVK 1 0 1
SVN 2 2 0
SWE 32 13 19
SYC 3 2 1
TCD 1 1 0
TON 20 12 8
TWN 6 5 1
USA 919 919 0
UZB 4 4 0
WSM 3 3 0
XKX 2 2 0
ZAF 31 23 8
Status observations; not live operating status:
status
operational 2136
announced 246
under_construction 180
unknown 44
permitted 42
partially_operational 8
suspended 6
commissioning 6
retired 1
A focused query keeps the conflicting owner/regulatory MW observations visible. Inspect conflicts_json before deciding which rating is appropriate for a study.
print("Chile projects and unresolved rating observations:")
print(
projects.loc[
projects["country_code"].eq("CHL"),
[
"name",
"power_capacity_mw",
"energy_capacity_mwh",
"status_as_of",
"quality_status",
"conflicts_json",
"source_urls",
],
].to_string(index=False)
)
print("Technical-field completeness:")
print(
completeness.loc[
[
"power_capacity_mw",
"energy_capacity_mwh",
"chemistry",
"latitude",
"duration_hours",
"battery_manufacturers",
"round_trip_efficiency_pct",
]
].to_string()
)
Chile projects and unresolved rating observations:
name power_capacity_mw energy_capacity_mwh status_as_of quality_status conflicts_json source_urls
BESS Zelble (Ex Dos Pinos) NaN 12.000 2026-10-30 needs_review None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
Andino Los Maitenes — BESS component 90.0 360.000 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
BESS Amuleto 9.0 36.000 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
Juan Gonzalo Solar — BESS component 9.0 36.000 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
BESS Cardonal 20.0 104.330 2026-10-30 needs_review None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
BESS El Olivar 9.0 49.500 2026-10-30 needs_review None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
Juncal Solar — BESS component 9.0 36.000 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
BESS La Huayca 29.0 125.375 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
BESS Finis Terrae 100.0 460.000 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
BESS Charrabata 2 9.0 45.000 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
BESS Livorno NaN 28.800 2026-10-30 needs_review None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
Dartel Renca distribution center BESS NaN 0.430 2026-11-08 source_backed None [https://elum-energy.com/references/dartel-new-distribution-center-chile/]
Panta Solar El Milagro — BESS component 6.0 24.000 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
Parque Solar Margarita Sur — BESS component 3.0 24.000 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
Parque Fotovoltaico Los Rastrojos — BESS component 141.0 840.000 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
BESS Monza 6.5 26.000 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
BESS Luz del Norte 141.0 677.410 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
Parque Solar Río Bueno — BESS component 9.0 40.120 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
BESS Hijuela 9.0 49.500 2026-10-30 needs_review None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
BESS Sol de Valle Hermoso 9.0 49.500 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
Parque Fotovoltaico Planchón 75 MW — BESS component 75.0 300.000 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
BESS Tamango 28.0 140.000 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
BESS Diego de Almagro Sur II 228.0 912.000 2026-10-28 needs_review None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx, https://www.colbun.cl/corporativo/sala-de-prensa/noticias-y-comunicados/detalle/2026/10/28/colbun-informa-ebitda-de-us196-6-millones-durante-el-tercer-trimestre-de-2026, https://www.colbun.cl/nuestras-energias/proyectos-de-energia-renovable/proyectos-de-almacenamiento/bess-ii-das]
Planta Solar El Membrillar BESS 9.0 39.600 2026-10-30 needs_review None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
Parque Solar Pampa Alegre — BESS component 9.0 40.120 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
Pichirropulli BESS 6.0 30.000 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
Planta Solar El Trigal — BESS component 9.0 40.500 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
BESS Azabache 58.1 232.300 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
BESS Tamaya 68.0 418.000 2026-11-01 needs_review {"power_capacity_mw":{"alternative":76,"alternative_source":"engie_financial_2025","resolution":"Unresolved rating/scope difference; retain both observations, exclude from unqualified totals.","selected":68,"selected_source":"engie_storage"}} [https://www.cmfchile.cl/institucional/inc/inf_financiera/ifrs/safec_ifrs_verarchivo.php?auth=YTkzMzg5N2Q1NzVhYjg0YmQxNGVkZDQ1ZDY1YjU5MmI%3D&send=aTLbRr%2F7WtG0t9iSEYFzO7yoE2%2FVR6LkV0F57PF3dpY8m4jmpYcoaGZpfwneYsXRwIlXZjuYRoRicccbOcDrZ0gHG6YUSV2RxGE71hXYJrKSw7IXoi1yVuWH7hiH5GAZhoC6eH+HvxGZ7yP10tgDpCUpJvbQPBAl2L8V56+AXzTHOAQ%3D, https://www.engie.digital/almacenamiento-bess/]
Pampa Solar del Tamarugal — BESS component 120.0 616.000 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
BESS Mirlo 16.4 82.000 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
BESS Proyecto Algarrobal 200 MW 200.0 1300.000 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
BESS Rivazzurra 9.0 18.200 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
PMG San Marcos — BESS component 2.9 2.300 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
Ampliación Parque Solar Aris - BESS 9.0 40.100 2026-10-30 needs_review None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
BESS Tarapacá 336.0 1344.000 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
BESS Monte Águila 240.0 960.000 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
Parque Solar Don Juve — BESS component 9.0 36.000 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
SANTA MARTA SOLAR BESS 9.0 36.000 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
Planta Solar Las Torres — BESS component 9.0 40.500 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
BESS Parque Fotovoltaico Malgarida II 200.0 1000.000 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
Sandstone BESS IV 300.0 1500.000 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
BESS de Generación Solar – Etapa 2 15.0 30.000 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
Santa Graciela Solar — BESS component 20.0 80.000 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
BESS Modena 9.0 36.000 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
BESS Libélula 203.0 1034.000 2026-08-28 source_backed None [https://www.engie.cl/impulsamos-la-transicion-energetica-con-la-entrada-en-operacion-de-dos-nuevos-parques-de-almacenamiento/]
Planta Solar Los Pétalos — BESS component 9.0 40.050 2026-10-30 needs_review None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
Parque Solar Polpaico — BESS component 3.0 15.000 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
PFV Lumira Solar — BESS component 6.0 30.000 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
BESS Las Salinas 200.0 800.000 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
BESS Tocopilla 116.0 660.000 2026-03-04 source_backed None [https://www.engie.cl/obtuvimos-la-entrada-en-operacion-comercial-de-bess-tocopilla/]
BESS Parque Fotovoltaico El Romero 196.0 980.000 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
Ana Solar — BESS component 7.5 30.090 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
Matilde Solar — BESS component 9.0 36.000 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
Parque Solar Cañal Bajo — BESS component 9.0 40.120 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
BESS La Pampina 159.0 636.000 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
BESS Luna de Verano 300.0 600.100 2026-10-30 needs_review None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
Isidora Solar — BESS component 9.0 40.000 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
BESS Mandarinos 8.0 32.000 2026-10-30 needs_review None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
Parque Solar Vichuquén Santa Elena — BESS component 4.5 20.000 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
Librillo BESS 117.0 585.000 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
Doña Pierina — BESS component 9.0 36.000 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
BESS Valle del Sol 150.0 600.000 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
Planta Solar Santa Isidora BESS 9.0 41.280 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
BESS Latorre Sunlight 4.9 24.500 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
BESS Copihue Nuevo 20.0 100.000 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
El Pelícano BESS 75.0 300.000 2026-10-30 needs_review None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
BESS Los Loros 48.0 275.230 2026-08-28 source_backed None [https://www.engie.cl/impulsamos-la-transicion-energetica-con-la-entrada-en-operacion-de-dos-nuevos-parques-de-almacenamiento/]
BESS San Juan 9.0 45.000 2026-10-30 needs_review None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
BESS Celda Solar 228.0 912.000 2026-10-28 source_backed None [https://www.colbun.cl/corporativo/sala-de-prensa/noticias-y-comunicados/detalle/2026/10/28/colbun-informa-ebitda-de-us196-6-millones-durante-el-tercer-trimestre-de-2026, https://www.colbun.cl/nuestras-energias/proyectos-de-energia-renovable/proyectos-de-almacenamiento/celda-solar]
Parque Solar La Esmeralda — BESS component 9.0 40.120 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
CRCA Observatorio del Verano — BESS component 120.0 606.810 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
BESS Lile 142.0 802.000 2026-10-08 source_backed None [https://www.engie.cl/concluimos-la-primera-etapa-de-la-reconversion-del-complejo-energetico-mejillones/]
BESS Nueva Paillaco 4.5 25.100 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
BESS Angol 4.5 18.000 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
BESS Valle de los Vientos 36.0 144.000 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
Parque Fotovoltaico El Capitán — BESS component 9.0 40.500 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
BESS DUNE 306.3 1334.000 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
Planta Fotovoltaica José Solar — BESS component 9.0 40.500 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
BESS Coya 139.0 638.000 2024-03-18 needs_review {"power_capacity_mw":{"alternative":140.97,"alternative_source":"engie_financial_2025","resolution":"Unresolved rating/scope difference; retain both observations, exclude from unqualified totals.","selected":139,"selected_source":"engie_coya_2024"}} [https://www.cmfchile.cl/institucional/inc/inf_financiera/ifrs/safec_ifrs_verarchivo.php?auth=YTkzMzg5N2Q1NzVhYjg0YmQxNGVkZDQ1ZDY1YjU5MmI%3D&send=aTLbRr%2F7WtG0t9iSEYFzO7yoE2%2FVR6LkV0F57PF3dpY8m4jmpYcoaGZpfwneYsXRwIlXZjuYRoRicccbOcDrZ0gHG6YUSV2RxGE71hXYJrKSw7IXoi1yVuWH7hiH5GAZhoC6eH+HvxGZ7yP10tgDpCUpJvbQPBAl2L8V56+AXzTHOAQ%3D, https://www.engie.cl/inicia-su-operacion-comercial-el-sistema-de-almacenamiento-mas-grande-de-america-latina/]
BESS Chicha Solar 9.0 45.000 2026-10-30 source_backed None [https://www.cne.cl/wp-content/uploads/2026/10/Resolucion-Exenta-603-2026.pdf, https://www.cne.cl/wp-content/uploads/2026/10/Tablas-Declaracion-Construccion-octubre-2026.xlsx]
Technical-field completeness:
type unit known missing coverage_pct
field
power_capacity_mw double MW 2331 338 87.336081
energy_capacity_mwh double MWh 2256 413 84.526040
chemistry string 1516 1153 56.800300
latitude double degrees 1322 1347 49.531660
duration_hours double h 47 2622 1.760959
battery_manufacturers list<element: string> 34 2635 1.273885
round_trip_efficiency_pct double % 1 2668 0.037467
Plot project counts and paired ratings. Never use the PV or whole-site grid connection capacity in place of missing battery MW. Colour separates source status, and open conflict records are omitted from the capacity scatter.
fig, axes = plt.subplots(1, 2, figsize=(13, 9), layout="constrained")
projects["country_code"].value_counts().sort_values().plot.barh(ax=axes[0], color="#167d9a")
axes[0].set(
xscale="log",
xlabel="Project / plant records (log scale)",
ylabel="Country",
title="Catalogue coverage; not market share",
)
paired = projects.loc[
projects["quality_status"].eq("source_backed")
& projects["power_capacity_mw"].gt(0)
& projects["energy_capacity_mwh"].gt(0)
]
for status, group in paired.groupby("status"):
axes[1].scatter(
group["power_capacity_mw"], group["energy_capacity_mwh"], label=status, alpha=0.8
)
axes[1].set(
xscale="log",
yscale="log",
xlabel="Reported battery power (MW)",
ylabel="Reported battery energy (MWh)",
title="Paired source ratings; unresolved conflicts excluded",
)
axes[1].legend(fontsize=8)
axes[1].grid(alpha=0.2)
fig.suptitle("Worldwide BESS catalogue · source observations, not market totals", fontweight="bold")
plt.show()

The E/P ratio is not presented as guaranteed discharge duration: energy may be nominal or usable, and power may have an unspecified AC/DC basis. Capacities also have different status dates and phase scopes. Filter and reconcile these fields before any fleet sum, ranking, project comparison or market estimate.
Total running time of the script: (0 minutes 0.898 seconds)